This is a Request for Bid (RFB) specification document issued by the New Hampshire Fish and Game Department for aerial stocking services of fingerling brook trout into remote ponds. The contractor must provide a helicopter with an experienced pilot to stock fingerling trout in 43 remote ponds located throughout central and northern New Hampshire, including areas in the White Mountains. The operation must be completed in early June within a 16-hour timeframe, encompassing pre-event and post-event duties such as setup, breakdown, and equipment cleaning. In addition to helicopter services, the contractor shall supply a fuel service truck at up to nine landing sites, an insulated, watertight fish transport and holding tank measuring 24"x24"x36" (approximately 20 gallons) equipped with an electrically powered aerator, and a flexible drain line with on/off capability. The pilot must collect and maintain ten water samples passed from an accompanying NHFGD representative during sorties. The operation requires specialized expertise in mountain terrain flying at elevations up to 4,000 feet, with the ability to safely descend to and ascend from pond surfaces in confined basins and deep chasms. The helicopter must be equipped with fixed floats for water landings.
The contractor must complete the stocking operation within one day unless weather delays occur, in which case the contractor assumes all associated costs for meals and lodging. The contractor is responsible for all travel expenses to the starting destination in New Hampshire and return to their base location. The specifications indicate that sorties and pond coordinates are available upon request, though no specific pricing terms, set-aside requirements, award dates, or contract term details are provided in this specification document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| attachment-2-rfb-f-g-2026-04-0.xls | XLS spreadsheet | |
| attachment-3-rfb-f-g-2026-04.xls | XLS spreadsheet | |
| rfb-f-g-2026-04.pdf | ||
| rfb-f-g-2026-04-award.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2026 NH Remote Pond Brook Trout Aerial Stocking Specifications:
• Contractor must provide an appropriate helicopter with an experienced pilot for the purpose of directly stocking fish and obtaining select water samples in 43 remote ponds, under the direction of New Hampshire Fish and Game Department (NHFGD) fisheries personnel. The operation is to be completed in early June, within 16 hours, including pre-and post-event duties (e.g. set up, breakdown, cleaning).
• In addition to the helicopter and pilot, the contractor shall provide a fuel service truck at up to nine (9) landing sites located throughout central and northern New Hampshire, under the direction of NHFGD fisheries personnel.
• Contractor must supply an insulated, watertight fish transport/holding tank (dimensions 24”x24”x36” - approximately 20 gallons) equipped with an electrically powered aerator for fish survival, as well as a flexible drain line with on/off capability and suitable length to extend beyond the helicopter’s exterior.
• Ten (10) water samples, to be collected by accompanying NHFGD representative from the rear passenger seat, are to be passed forward, stored, and maintained by the pilot as necessary during sorties.
• The operation requires a highly experienced pilot to fly and work over mountainous terrain, including the White Mountains and other hazardous zones; particular sorties occur at upwards of 4,000 feet. Pilot will require specialized skills descending to and ascending from a liquid medium/pond surfaces in a short period of time, including isolated ponds in confined basins/deep chasms.
• Helicopter must be equipped with fixed floats for landing on water.
• Contractor must complete stocking in one day unless delays occur due to inclement weather. In the event of associated delays, contractor must be prepared to absorb any associated cost due to meals and lodging.
• Contractor must cover all associated travel costs to starting destination in New Hampshire as well as cost to contractor’s base destination.
· Sorties and pond coordinates are available upon request.