The file's text, extracted by GovTribe without its formatting.
Base Year
| Instructions: Fill in the shaded boxes only. All other numbers will automatically calculate. Use the tabs at the bottom to provide pricing for the base year through option year four. If your company has any additional charges or fees, prompt payment discounts, etc., clearly state what these are in your proposal. If you have any questions when completing this worksheet, please contact |
| PERIOD OF PERFORMANCE: BASE PERIOD |
| EFFECTIVE DATE OF CONTRACT AWARD FOR ONE CALENDAR YEAR PERIOD |
| CLIN | ITEM DESCRIPTION | EST QTY | UNIT OF ISSUE | UNIT PRICE | EST AMOUNT |
| 0001 | Repair | 10 | EA | | $ - 0 |
| Searchlight | | | | |
| NSN: 6220-01-334-4821 | | | | |
| P/N: 0247-11-31 | | | | |
| IAW SOW Section 3.1 | | | | |
| 0002 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Tail Drive Shaft Forward | | | |
| Searchlight | | | |
| NSN: 6220-01-334-4821 | | | |
| P/N: 0247-11-31 | | | |
| IAW SOW Section 3.3 | | | |
| 0003 | Repair | 20 | EA | $ - 0 |
| Gimbal | | | |
| NSN: 6220-01-316-0846 | | | |
| P/N: 030040-21 | | | |
| IAW SOW Section 3.1 | | | |
| 0004 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gimbal | | | |
| NSN: 6220-01-316-0846 | | | |
| P/N: 030040-21 | | | |
| IAW SOW Section 3.3 | | | |
| 0005 | Repair | 40 | EA | $ - 0 |
| Dual Amplifer, GA | | | |
| NSN: 6680-14-387-2590 | | | |
| P/N: 706786-3 | | | |
| IAW SOW Section 3.1 | | | |
| 0006 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Dual Amplifer, GA | | | |
| NSN: 6680-14-387-2590 | | | |
| P/N: 706786-3 | | | |
| IAW SOW Section 3.3 | | | |
| 0007 | Repair | 16 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0165 | | | |
| P/N: 794166 | | | |
| IAW SOW Section 3.1 | | | |
| 0008 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0165 | | | |
| P/N: 794166 | | | |
| IAW SOW Section 3.3 | | | |
| 0009 | Repair | 6 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0166 | | | |
| P/N: 794165 | | | |
| IAW SOW Section 3.1 | | | |
| 0010 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0166 | | | |
| P/N: 794165 | | | |
| IAW SOW Section 3.3 | | | |
| 00011 | Repair | 6 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0167 | | | |
| P/N: 794167-1 | | | |
| IAW SOW Section 3.1 | | | |
| 0012 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0167 | | | |
| P/N: 794167-1 | | | |
| IAW SOW Section 3.3 | | | |
| 0013 | Unusual Damage Evaluation Labor Rate | TBD | HR | |
| IAW SOW Section 6.3 | | | |
| 0014 | Technical Support Service Labor Rate | TBD | HR | |
| IAW SOW Section 7.1 | | | |
| 0015 | Product/Engineering Change Labor Rate | TBD | HR | |
| IAW SOW Section 7.2 | | | |
| 0016 | Service Bulletins Labor Rate | TBD | HR | |
| IAW SOW Section 7.3 | | | |
| 0017 | PQDR (No Cost Repair) | TBD | HR | |
| IAW SOW Section 9.1 | | | |
| ESTIMATED TOTAL BASE PERIOD: | | | $ - 0 |
| As per FAR Part 16.503 (c), Government Property furnished for repair. Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as "estimated" or Maximum" will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract. | | | |
&"Arial,Bold"Schedule of Services Contract Line Items
| Base Period | &"Arial,Bold"Attachment 1 - Requirements - |
| 70Z03823QB0000258 | &"Arial,Bold"Solicitation 70Z038253QB2000258 |
Period of Performance: TBD
&"Arial,Bold"Schedule of Services Contract Line Items
| Base Period | &"Arial,Bold"Attachment 1 - Requirements - |
| 70Z03823QB0000258 | &"Arial,Bold"Solicitation 70Z03823QB0000258 |
Period of Performance: TBD
Option Year 1
| Instructions: Fill in the shaded boxes only. All other numbers will automatically calculate. Use the tabs at the bottom to provide pricing for the base year through option year four. If your company has any additional charges or fees, prompt payment discounts, etc., clearly state what these are in your proposal. If you have any questions when completing this worksheet, please contact |
| PERIOD OF PERFORMANCE: OPTION PERIOD ONE |
| EFFECTIVE DATE OF CONTRACT AWARD FOR ONE CALENDAR YEAR PERIOD |
| CLIN | ITEM DESCRIPTION | EST QTY | UNIT OF ISSUE | UNIT PRICE | EST AMOUNT |
| 1001 | Repair | 10 | EA | | $ - 0 |
| Searchlight | | | | |
| NSN: 6220-01-334-4821 | | | | |
| P/N: 0247-11-31 | | | | |
| IAW SOW Section 3.1 | | | | |
| 1002 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Tail Drive Shaft Forward | | | |
| Searchlight | | | |
| NSN: 6220-01-334-4821 | | | |
| P/N: 0247-11-31 | | | |
| IAW SOW Section 3.3 | | | |
| 1003 | Repair | 20 | EA | $ - 0 |
| Gimbal | | | |
| NSN: 6220-01-316-0846 | | | |
| P/N: 030040-21 | | | |
| IAW SOW Section 3.1 | | | |
| 1004 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gimbal | | | |
| NSN: 6220-01-316-0846 | | | |
| P/N: 030040-21 | | | |
| IAW SOW Section 3.3 | | | |
| 1005 | Repair | 40 | EA | $ - 0 |
| Dual Amplifer, GA | | | |
| NSN: 6680-14-387-2590 | | | |
| P/N: 706786-3 | | | |
| IAW SOW Section 3.1 | | | |
| 1006 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Dual Amplifer, GA | | | |
| NSN: 6680-14-387-2590 | | | |
| P/N: 706786-3 | | | |
| IAW SOW Section 3.3 | | | |
| 1007 | Repair | 16 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0165 | | | |
| P/N: 794166 | | | |
| IAW SOW Section 3.1 | | | |
| 1008 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0165 | | | |
| P/N: 794166 | | | |
| IAW SOW Section 3.3 | | | |
| 0009 | Repair | 6 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0166 | | | |
| P/N: 794165 | | | |
| IAW SOW Section 3.1 | | | |
| 1010 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0166 | | | |
| P/N: 794165 | | | |
| IAW SOW Section 3.3 | | | |
| 1011 | Repair | 6 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0167 | | | |
| P/N: 794167-1 | | | |
| IAW SOW Section 3.1 | | | |
| 1012 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0167 | | | |
| P/N: 794167-1 | | | |
| IAW SOW Section 3.3 | | | |
| 1013 | Unusual Damage Evaluation Labor Rate | TBD | HR | |
| IAW SOW Section 6.3 | | | |
| 1014 | Technical Support Service Labor Rate | TBD | HR | |
| IAW SOW Section 7.1 | | | |
| 1015 | Product/Engineering Change Labor Rate | TBD | HR | |
| IAW SOW Section 7.2 | | | |
| 1016 | Service Bulletins Labor Rate | TBD | HR | |
| IAW SOW Section 7.3 | | | |
| 1017 | PQDR (No Cost Repair) | TBD | HR | |
| IAW SOW Section 9.1 | | | |
| ESTIMATED TOTAL OPTION PERIOD ONE: | | | $ - 0 |
| As per FAR Part 16.503 (c), Government Property furnished for repair. Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as "estimated" or Maximum" will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract. | | | |
| Option Period 1 | &"Arial,Bold"Attachment 1 - Requirements - |
| 70Z03823QB0000258 | &"Arial,Bold"Solcitation 70Z03823QB2000258 |
Period of Performance: TBD
&"Arial,Bold"Schedule of Services Contract Line Items
| Option Period 1 | &"Arial,Bold"Attachment 1 Requirements - |
| 70Z03823QB0000258 | &"Arial,Bold" Solicitation 70Z03823QB0000258 |
Option Year 2
| Instructions: Fill in the shaded boxes only. All other numbers will automatically calculate. Use the tabs at the bottom to provide pricing for the base year through option year four. If your company has any additional charges or fees, prompt payment discounts, etc., clearly state what these are in your proposal. If you have any questions when completing this worksheet, please contact |
| PERIOD OF PERFORMANCE: OPTION PERIOD TWO |
| EFFECTIVE DATE OF CONTRACT AWARD FOR ONE CALENDAR YEAR PERIOD |
| CLIN | ITEM DESCRIPTION | EST QTY | UNIT OF ISSUE | UNIT PRICE | EST AMOUNT |
| 2001 | Repair | 10 | EA | | $ - 0 |
| Searchlight | | | | |
| NSN: 6220-01-334-4821 | | | | |
| P/N: 0247-11-31 | | | | |
| IAW SOW Section 3.1 | | | | |
| 2002 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Tail Drive Shaft Forward | | | |
| Searchlight | | | |
| NSN: 6220-01-334-4821 | | | |
| P/N: 0247-11-31 | | | |
| IAW SOW Section 3.3 | | | |
| 2003 | Repair | 20 | EA | $ - 0 |
| Gimbal | | | |
| NSN: 6220-01-316-0846 | | | |
| P/N: 030040-21 | | | |
| IAW SOW Section 3.1 | | | |
| 2004 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gimbal | | | |
| NSN: 6220-01-316-0846 | | | |
| P/N: 030040-21 | | | |
| IAW SOW Section 3.3 | | | |
| 2005 | Repair | 40 | EA | $ - 0 |
| Dual Amplifer, GA | | | |
| NSN: 6680-14-387-2590 | | | |
| P/N: 706786-3 | | | |
| IAW SOW Section 3.1 | | | |
| 2006 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Dual Amplifer, GA | | | |
| NSN: 6680-14-387-2590 | | | |
| P/N: 706786-3 | | | |
| IAW SOW Section 3.3 | | | |
| 2007 | Repair | 16 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0165 | | | |
| P/N: 794166 | | | |
| IAW SOW Section 3.1 | | | |
| 2008 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0165 | | | |
| P/N: 794166 | | | |
| IAW SOW Section 3.3 | | | |
| 2009 | Repair | 6 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0166 | | | |
| P/N: 794165 | | | |
| IAW SOW Section 3.1 | | | |
| 2010 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0166 | | | |
| P/N: 794165 | | | |
| IAW SOW Section 3.3 | | | |
| 2011 | Repair | 6 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0167 | | | |
| P/N: 794167-1 | | | |
| IAW SOW Section 3.1 | | | |
| 2012 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0167 | | | |
| P/N: 794167-1 | | | |
| IAW SOW Section 3.3 | | | |
| 2013 | Unusual Damage Evaluation Labor Rate | TBD | HR | |
| IAW SOW Section 6.3 | | | |
| 2014 | Technical Support Service Labor Rate | TBD | HR | |
| IAW SOW Section 7.1 | | | |
| 2015 | Product/Engineering Change Labor Rate | TBD | HR | |
| IAW SOW Section 7.2 | | | |
| 2016 | Service Bulletins Labor Rate | TBD | HR | |
| IAW SOW Section 7.3 | | | |
| 2017 | PQDR (No Cost Repair) | TBD | HR | |
| IAW SOW Section 9.1 | | | |
| ESTIMATED TOTAL OPTION PERIOD TWO: | | | | $ - 0 |
| As per FAR Part 16.503 (c), Government Property furnished for repair. Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as "estimated" or Maximum" will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract. | | | |
| Option Period 2 | &"Arial,Bold"Attachment 1 - Requirements - |
| 70Z03823QB0000258 | &"Arial,Bold"Solicitation 70Z03823QB2000258 |
Period of Peformance: TBD
&"Arial,Bold"Schedule of Services Contract Line Items
| Option Period 2 | &"Arial,Bold"Attachment 1 - Requirements - |
| 70Z03823QB0000258 | &"Arial,Bold" Solicitation 70Z03823QB0000258 |
Option Year 3
| Instructions: Fill in the shaded boxes only. All other numbers will automatically calculate. Use the tabs at the bottom to provide pricing for the base year through option year four. If your company has any additional charges or fees, prompt payment discounts, etc., clearly state what these are in your proposal. If you have any questions when completing this worksheet, please contact |
| PERIOD OF PERFORMANCE: OPTION PERIOD THREE |
| EFFECTIVE DATE OF CONTRACT AWARD FOR ONE CALENDAR YEAR PERIOD |
| CLIN | ITEM DESCRIPTION | EST QTY | UNIT OF ISSUE | UNIT PRICE | EST AMOUNT |
| 3001 | Repair | 10 | EA | | $ - 0 |
| Searchlight | | | | |
| NSN: 6220-01-334-4821 | | | | |
| P/N: 0247-11-31 | | | | |
| IAW SOW Section 3.1 | | | | |
| 3002 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Tail Drive Shaft Forward | | | |
| Searchlight | | | |
| NSN: 6220-01-334-4821 | | | |
| P/N: 0247-11-31 | | | |
| IAW SOW Section 3.3 | | | |
| 3003 | Repair | 20 | EA | $ - 0 |
| Gimbal | | | |
| NSN: 6220-01-316-0846 | | | |
| P/N: 030040-21 | | | |
| IAW SOW Section 3.1 | | | |
| 3004 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gimbal | | | |
| NSN: 6220-01-316-0846 | | | |
| P/N: 030040-21 | | | |
| IAW SOW Section 3.3 | | | |
| 3005 | Repair | 40 | EA | $ - 0 |
| Dual Amplifer, GA | | | |
| NSN: 6680-14-387-2590 | | | |
| P/N: 706786-3 | | | |
| IAW SOW Section 3.1 | | | |
| 3006 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Dual Amplifer, GA | | | |
| NSN: 6680-14-387-2590 | | | |
| P/N: 706786-3 | | | |
| IAW SOW Section 3.3 | | | |
| 3007 | Repair | 16 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0165 | | | |
| P/N: 794166 | | | |
| IAW SOW Section 3.1 | | | |
| 3008 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0165 | | | |
| P/N: 794166 | | | |
| IAW SOW Section 3.3 | | | |
| 3009 | Repair | 6 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0166 | | | |
| P/N: 794165 | | | |
| IAW SOW Section 3.1 | | | |
| 3010 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0166 | | | |
| P/N: 794165 | | | |
| IAW SOW Section 3.3 | | | |
| 3011 | Repair | 6 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0167 | | | |
| P/N: 794167-1 | | | |
| IAW SOW Section 3.1 | | | |
| 3012 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0167 | | | |
| P/N: 794167-1 | | | |
| IAW SOW Section 3.3 | | | |
| 3013 | Unusual Damage Evaluation Labor Rate | TBD | HR | |
| IAW SOW Section 6.3 | | | |
| 3014 | Technical Support Service Labor Rate | TBD | HR | |
| IAW SOW Section 7.1 | | | |
| 3015 | Product/Engineering Change Labor Rate | TBD | HR | |
| IAW SOW Section 7.2 | | | |
| 3016 | Service Bulletins Labor Rate | TBD | HR | |
| IAW SOW Section 7.3 | | | |
| 3017 | PQDR (No Cost Repair) | TBD | HR | |
| IAW SOW Section 9.1 | | | |
| ESTIMATED TOTAL OPTION PERIOD THREE: | | | | $ - 0 |
| As per FAR Part 16.503 (c), Government Property furnished for repair. Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as "estimated" or Maximum" will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract. | | | |
| Option Period 3 | &"Arial,Bold"Attachment 1 - Requirements - |
| 70Z03823QB0000258 | &"Arial,Bold"Solicitation 70Z03823QB2000258 |
Period of Performance: TBD
&"Arial,Bold"Schedule of Services Contract Line Items
| Option Period 3 | &"Arial,Bold"Attachment 1- Requirements - |
| 70Z03823QB000258 | &"Arial,Bold" Solicitation 70Z03823QB0000258 |
Option Year 4
| Instructions: Fill in the shaded boxes only. All other numbers will automatically calculate. Use the tabs at the bottom to provide pricing for the base year through option year four. If your company has any additional charges or fees, prompt payment discounts, etc., clearly state what these are in your proposal. If you have any questions when completing this worksheet, please contact |
| PERIOD OF PERFORMANCE: OPTION PERIOD FOUR |
| EFFECTIVE DATE OF CONTRACT AWARD FOR ONE CALENDAR YEAR PERIOD |
| CLIN | ITEM DESCRIPTION | EST QTY | UNIT OF ISSUE | UNIT PRICE | EST AMOUNT |
| 4001 | Repair | 10 | EA | | $ - 0 |
| Searchlight | | | | |
| NSN: 6220-01-334-4821 | | | | |
| P/N: 0247-11-31 | | | | |
| IAW SOW Section 3.1 | | | | |
| 4002 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Tail Drive Shaft Forward | | | |
| Searchlight | | | |
| NSN: 6220-01-334-4821 | | | |
| P/N: 0247-11-31 | | | |
| IAW SOW Section 3.3 | | | |
| 4003 | Repair | 20 | EA | $ - 0 |
| Gimbal | | | |
| NSN: 6220-01-316-0846 | | | |
| P/N: 030040-21 | | | |
| IAW SOW Section 3.1 | | | |
| 4004 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gimbal | | | |
| NSN: 6220-01-316-0846 | | | |
| P/N: 030040-21 | | | |
| IAW SOW Section 3.3 | | | |
| 4005 | Repair | 40 | EA | $ - 0 |
| Dual Amplifer, GA | | | |
| NSN: 6680-14-387-2590 | | | |
| P/N: 706786-3 | | | |
| IAW SOW Section 3.1 | | | |
| 4006 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Dual Amplifer, GA | | | |
| NSN: 6680-14-387-2590 | | | |
| P/N: 706786-3 | | | |
| IAW SOW Section 3.3 | | | |
| 4007 | Repair | 16 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0165 | | | |
| P/N: 794166 | | | |
| IAW SOW Section 3.1 | | | |
| 4008 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0165 | | | |
| P/N: 794166 | | | |
| IAW SOW Section 3.3 | | | |
| 4009 | Repair | 6 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0166 | | | |
| P/N: 794165 | | | |
| IAW SOW Section 3.1 | | | |
| 4010 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0166 | | | |
| P/N: 794165 | | | |
| IAW SOW Section 3.3 | | | |
| 4011 | Repair | 6 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0167 | | | |
| P/N: 794167-1 | | | |
| IAW SOW Section 3.1 | | | |
| 4012 | Test and Evaluation (T&E) | 1 | EA | $ - 0 |
| Gauge, Fuel | | | |
| NSN: 6680-14-367-0167 | | | |
| P/N: 794167-1 | | | |
| IAW SOW Section 3.3 | | | |
| 4013 | Unusual Damage Evaluation Labor Rate | TBD | HR | |
| IAW SOW Section 6.3 | | | |
| 4014 | Technical Support Service Labor Rate | TBD | HR | |
| IAW SOW Section 7.1 | | | |
| 4015 | Product/Engineering Change Labor Rate | TBD | HR | |
| IAW SOW Section 7.2 | | | |
| 4016 | Service Bulletins Labor Rate | TBD | HR | |
| IAW SOW Section 7.3 | | | |
| 4017 | PQDR (No Cost Repair) | TBD | HR | |
| IAW SOW Section 9.1 | | | |
| ESTIMATED TOTAL OPTION PERIOD FOUR: | | | $ - 0 |
| ESTIMATED TOTAL FOR BASE AND ALL OPTION PERIODS | | | $ - 0 |
As per FAR Part 16.503 (c), Government Property furnished for repair. Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as "estimated" or Maximum" will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.
| Option Period 4 | &"Arial,Bold"Attachment 1 - Requirements - |
| 70Z03823QB0000258 | &"Arial,Bold"Solicitation 70Z03823QB2000258 |
Period of Performance: TBD
&"Arial,Bold"Schedule of Services Contract Line Items
| Option Period 4 | &"Arial,Bold"Attachment 1 - Requirements - |
| 70Z03823QB000258 | &"Arial,Bold" Solicitation 70Z03823QB0000258 |