Attachment 1 - Requirements Document_Revised.pdf
PDF 180 KB Posted
- Attached to
- Stryten Energy Absolyte GP 3-100G17 Battery Kits
- Solicitation number
- 2125405B4200RA003
About this file
This is a Requirements Document for the United States Coast Guard's procurement of battery replacement kits. The document details the acquisition of four (4) Stryten Energy Absolyte GP 3-100G17 Battery Kits (NSN: 6140-01-627-6177) to support the Rescue 21 communications system in Alaska. The battery kits will be used for secondary backup power at the Remote Fixed Facility (RFF) MT. Robert Barron, with delivery to the Deckload Aviation Hangar at Kodiak Municipal Airport. The period of performance is one year from the date of hardware acceptance, and the Government will not furnish any additional resources to the contractor. The requirement is a total small business set-aside with a brand name only specification, meaning no substitutions are allowed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NESSS Battery Replacement Kits Requirements Document
2125405B4200RA003
UNITED STATES COAST GUARD
REQUIREMENTS DOCUMENT
1.0 PROJECT TITLE: BATTERY KIT REPLENISHMENT
The purpose of this statement of work is to define needed Acquisition Program Management Office Support for the purchase of Stryten Energy Absolyte GP 3- 100G17 Battery Kits NSN: 6140-01-627-6177
2.0 BACKGROUND
The Coast Guard currently has over ninety (90) 12 Cell Battery Kits installed throughout the Rescue 21 Alaska Area of Operation (AOR). These Battery Kits provide secondary backup power to critical Rescue21 communications equipment.
3.0 SCOPE
The Stryten Energy Absolyte GP 3-100G17 Battery Kits will be utilized for current casualty support for Remote Fixed Facility (RFF) MT. Robert Barron in Alaska.
4.0 APPLICABLE DOCUMENTS
None
5.0 REQUIREMENTS
The contractor shall provide four (4) Stryten Energy Absolyte GP 3-100G17 Battery Kits.
This information is provided below in Table 1.
Table 1:
MFG Part No.: Description Qty
100G17 Stryten Energy Absolyte BATTERY KIT (12 Cell) 4 EA
6.0 DELIVERABLES AND DELIVERY SCHEDULE
Contractor shall deliver all materials to:
NESSS Battery Replacement Kits Requirements Document
2125405B4200RA003
Deckload Aviation Hangar Kodiak Municipal Airport City Airport Road Kodiak, AK 99615
7.0 GOVERNMENT-FURNISHED EQUIPMENT AND INFORMATION
The Government will not furnish any resources to the Contractor in support of this acquisition.
8.0 PLACE OF PERFORMANCE
The primary place of performance will be at RFF MT. Robert Barron, Alaska.
9.0 PERIOD OF PERFORMANCE
The period of performance will be 1 Year from date of acceptance of hardware.
10.0 SECTION 508 REQUIREMENTS
1. Section 508 does not apply to your deliveries
# End of Requirements Document #
10.0 SECTION 508 REQUIREMENTS
File details come from the government source that posted it. Updated .