Attachment 1 - Replace Installation Main Gate Sign - SOW.pdf
PDF 222 KB Posted
- Attached to
- Replace Installation Main Gate Sign
- Solicitation number
- FA6670-25-B-0004
About this file
This Statement of Work (SOW) details a construction project to replace the main gate sign at Niagara Falls Air Reserve Station (NFARS). The project, identified as RVKQ 24-0007, requires the contractor to selectively demolish the existing damaged sign and install a new sign displaying "Niagara Falls Air Reserve Station Main Gate" in accordance with UFC 3-120-01 standards. Key requirements include external illumination using high-efficiency floodlights, replacement of existing concrete and electrical infrastructure, and adherence to multiple design codes including AASHTO, FHWA, and other federal guidelines.
The project involves comprehensive environmental protection measures, including proper waste disposal, recycling, and documentation. The contractor must submit a work schedule, waste logs, and comply with green purchasing requirements. All ground disturbances must be restored to their natural state, and operational testing is required before project completion. The work is to be performed within 45 calendar days, with the contractor responsible for all materials, equipment, labor, and compliance with federal, state, and local regulations.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
To Supplement SABER Contract
For Task Order
RVKQ 24-0007– Replace Installation Main Gate Sign
1 April 2025
1. SUMMARY OF WORK: The Contractor shall furnish and install all material, equipment, components, parts, tools, labor, transportation, hauling, disposal/recycling, cleaning, inspection, testing, commissioning, training, reporting, etc., necessary to perform this project as described in the contract-delivery order, including this Statement of Work and any / all applicable federal, state and local laws, regulations, and standards. Unless otherwise stated, any / all requirement for contractor to remove and properly dispose of / recycle off base, and to furnish and install / incorporate any / all new materials / equipment / components needed to properly complete the work item; any Government furnished property and / or reinstallation of existing materials / equipment / components shall be as stated / specified herein. Contractor shall submit materials / methods for approval prior to ordering and / or incorporation into the work; at a minimum, submittals shall include product literature, SDS, standard color, texture and style samples / swatches / boards, and place of origin / manufacture. Demolished materials, waste / debris is property of the contractor, unless otherwise stated herein;
contractor is responsible for proper disposal / recycling of such materials off base; such materials shall be promptly removed from the installation and shall not be stored / stockpiled unless submitted and approved for such. Contractor is responsible for verification of all details, measurement, etc., prior to ordering materials and execution of work.
2. Replace NFARS’ main gate sign off Lockport Road. Develop and install a new installation specific sign designed in accordance with UFC 3-120-01 to display “Niagara Falls Air Reserve Station Main Gate”.
3. Selectively demolish, remove, and properly dispose of the existing damaged sign and all ancillary components for the new sign to be installed.
4. Design and install a new main gate sign to display “Niagara Falls Air Reserve Station Main
Gate”. The design must conform to figures 3-2 through 3-9 in UFC 3-120-01 to the maximum extent practical.
914 MSG / CEC
Niagara Falls Air Reserve Station 2405 Franklin Drive Niagara Falls, New York 14304-5063
RVKQ 24-0007 – Installation Main Gate Sign
5. Provide external illumination for increased visibility using high-efficiency floodlights to the standard in UFC 3-120-01 to the maximum extent practical.
6. Selectively demolish and remove existing concrete. Replace in kind to accommodate the new installation sign.
7. Selectively demolish and replace existing electrical wiring and conduit back to local disconnect.
8. Contractor shall adhere to all exterior sign design codes in UFC 3-120-01 para. 1-3.1.
8.1. AASHTO Roadside Design Guide
8.2.ABAAS
8.3.FHWA MUTCD
8.4.FHWA Standard Highway Signs 8.5.ITE Traffic Control Devices Handbook 8.6.SSDCTE supplement to MUTCD 8.7.SSDCTEA Pamphlet 55-14 8.8.SSDCTEA Pamphlet 55-15 8.9.SSDCTEA Pamphlet 55-17
8.10. UFC 2-100-01
8.11. UFC 3-535-01
8.12. UFGS 10 14 01
9. All ground disturbance shall be returned to its natural state by soil replacement, rolling and grass seeding as necessary.
10. Perform operational and maintenance testing to ensure proper operation before turning over to the base staff.
11. Environmental Protection
11.1. Collect, containerize and properly dispose of all waste materials generated from the project off base, including but not limited to construction waste, electrical wiring and concrete.
11.2. Ensure the work area is clean and free of all debris at the end of each work day.
11.3. The Contractor shall be responsible for characterization, storage, describing, packaging, labeling, marking, and placarding of wastes. The Contractor shall characterize the waste as required by the disposal facility. Any analytical results shall be forwarded to 914 MSG/CEV for review and approval. Waste shall not leave the base until approval has been obtained from 914 MSG/CEV. It is anticipated the waste will be characterized as non-hazardous. The Contractor shall manifest, pack, ship and dispose of all waste in compliance with Federal, State and local laws and regulations.
RVKQ 24-0007 – Installation Main Gate Sign
11.4. Comply with Base standards for storage of hazardous materials such as sealant and gasoline and wastes. Contractor must provide SDS’s and volumes of hazardous materials to be used on project prior to bringing on base. Bulk materials and wastes must be secured and stored under cover. Maintain supplies on hand to contain and cleanup any spills generated by the Contractor’s activities. Report any spills to the Base Environmental office in accordance with Base’s HAZMAT Plan.
11.5. Contractor is to recycle or divert as much waste as practical.
11.6. Quarterly the Contractor must submit the Waste / Recycle Materials Log for
Contractors with a list of materials disposed and recycled.
11.7. Green Purchasing: The Contractor shall comply with the Green Purchasing requirements of the contract. Known / possible EPA Comprehensive Procurement Guideline, USDA Biobased, Green Seal Energy Star, etc., items. Recycled materials must be used to fullest extent in accordance with Executive Order 13101.
The EPA web-site, http://www.epa.gov/cpg, can be accessed for further instruction on what is an EPA-designated material.
11.8. Complete and submit to 914 MSG/CEV a refrigerant evacuation form upon removal of the existing refrigerant.
11.9. An asbestos survey was not completed in any of the mentioned work areas. The contractor shall immediately contact 914 MSG/CEV and 914 MSG/SGPB prior to disturbance if any asbestos containing materials are suspected.
12. Submittals
12.1. In addition to any submittals required by the general contract, provide the following project specific submittals for government review and approval prior to initiating work:
12.1.1. Work Schedule
12.1.2. Waste Logs
13. Attachments
13.1. Attachment 1 UFC 3-130-01 Sign Standards