Attachment 1 Replace Altitude Valve_SOW v6.pdf

PDF 3 MB Posted

Attached to
Replace Altitude Valve Federal contract opportunity
Solicitation number
W50S76-25-Q-A003
Issued by
Department of the Army National Guard

About this file

This Statement of Work (SOW) details the replacement of an altitude valve for the 136th Airlift Wing's fire suppression system at Naval Air Station Joint Reserve Base in Fort Worth, Texas. The project involves furnishing all labor, equipment, and materials to remove the existing inoperable 8-inch altitude valve and install a fully functional replacement that meets performance specifications. The contractor will be responsible for system isolation, valve removal and disposal, new valve installation, control system integration, testing, and providing documentation and training.

Key project requirements include field verification of existing conditions, compliance with NFPA and UFC standards, proper valve integration with the fire suppression system, and ensuring the new valve maintains water levels in the 400,000-gallon ground-level water storage tank. The project has a 60-calendar day performance period, is 100% set aside for small businesses, and has a project magnitude between $25,000 and $100,000. The site visit is scheduled for 12 August 2025 at 10:00 AM, with advance registration required. The solicitation is issued by the Department of the Army National Guard, with a point of contact at 136th Airlift Wing.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Altitude Valve, newest first.
File Type Posted
RFI Response - Replace Altitude Valve.pdf PDF
W50S7625QA003 B1677 Replace Altitude Valve.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work: DDPM252018_B1677 Replace Altitude Valve

Statement of Work

Location: 136th Airlift Wing, Naval Air Station Joint Reserve Base, Fort Worth, TX 76127 Date: 17 June 2025

Project: Building 1677 Replace Altitude Valve Project Number: DDPM252018

1. Background:

1.1. Building 1677 was constructed in 1999 and serves as the 136th Airlift Wing Fire Suppression Pump House. The existing Altitude Valve, which is critical to maintain a specific water level in an elevated storage tank, is inoperable, thus requiring recurrent manual filling of the water storage tank.

2. Scope of Work and Objectives:

2.1. Overall Objective: The Contractor shall provide all labor, supervision, equipment, tools, materials, transportation, and incidentals necessary to furnish and install a fully functional replacement altitude valve on the existing underground fire suppression line to the fire protection storage tank located within Building 1677, the 136th Airlift Wing Fire Suppression Pump House. The objective is to restore the proper operation and reliability of the fire suppression system, ensuring adequate water pressure and level control within the storage tank to meet the fire protection needs of the 136th Airlift Wing complex and hangars. The Contractor shall ensure a fully functional and compliant altitude valve for the existing fire suppression system upon completion of this project.

2.2. Compliance and Approvals: All work must be performed in accordance with this statement of work (SOW), applicable specifications, drawings, and applicable federal, state, and local building codes, as well as Unified Facilities Criteria (UFC) and Unified Facilities Guide Specifications (UFGS).

3. Tasks: The Contractor shall perform the following:

3.1. Pre-Work Verification and Responsibility: The Contractor is encouraged to field verify all existing conditions, dimensions, and system configurations prior to submitting a bid. This includes, but is not limited to:

3.1.1. Altitude Valve Inspection: Inspect and document the size, connection type (flanged, threaded, etc.), and condition of the existing altitude valve, and any other pertinent information in accordance with industry standards. Determine the valve's operating pressure range and flow capacity.

3.1.2. Piping System Assessment: Verify the material, size, and condition of the existing underground piping connected to the altitude valve. Identify any signs of corrosion, leaks, or damage.

3.1.3. Control System Interface: Determine how the altitude valve interacts with the overall fire suppression system control panel and any associated sensors or monitoring devices. Verify compatibility of the replacement valve with the existing control system.

3.1.4. Power Requirements: Determine the voltage and amperage requirements for the replacement valve, if applicable.

3.1.5. Applicable Codes and Standards: Verify all applicable federal, state, and local building codes, as well as Unified Facilities Criteria (UFC), National Fire Protection Association (NFPA) standards (specifically NFPA 13 and NFPA 25), and any other relevant regulations that govern the installation and operation of fire suppression systems.

3.2. System Isolation and Shutdown: Safely isolate the affected portion of the fire suppression system to allow for valve replacement. Implement appropriate lockout/tagout procedures. The Contractor shall coordinate all shutdowns with the 136th CES to minimize disruption to operations.

3.3. Altitude Valve Removal and Disposal: Remove the existing altitude valve from the piping system. Dispose of the removed valve in accordance with all applicable environmental regulations.

3.4. Altitude Valve Installation: Install a new altitude valve that meets or exceeds the performance specifications of the existing valve listed in section four of this document. Ensure proper alignment, connection, and sealing to prevent leaks.

3.5. Control System Integration: Integrate the new altitude valve with the existing fire suppression system control panel. Configure the control system to properly monitor and control the valve's operation. Verify compatibility with the existing system.

3.6. System Startup and Testing: Repressurize the fire suppression system and test the operation of the new altitude valve. Verify that the valve maintains the proper water level in the storage tank and that all associated auto operation systems are functional. Conduct flow tests to verify adequate water supply.

3.7. Documentation and Training: Provide all required documentation, including system test certificates, as-built drawings, and operation and maintenance manuals. Provide training to designated 136th AW personnel on the operation and maintenance of the new altitude valve and associated systems.

4. Existing System Information. The following information regarding the existing fire suppression systems is provided for informational purposes only and does not constitute a complete or guaranteed representation of the existing conditions. The Contractor shall verify the accuracy and completeness of this information and fully identify all existing components, equipment, and conditions necessary for the successful completion of this project.

4.1. Existing Fire Suppression System Configuration: The existing fire suppression system employs a 400,000-gallon ground-level water storage tank as its primary water source. Protection is provided to two aircraft hangars and approximately eight other facilities via a network of fire suppression piping. System pressure is maintained at 120 psi by an electric jockey pump. In the event of a fire and subsequent pressure drop within the system, the following pumps are activated sequentially based on decreasing pressure thresholds:

4.1.1. Electric Pump 1: 2500 GPM @ 100 psi

4.1.2. Electric Pump 2: @ 80 psi

4.1.3. Diesel Pump: @ 55 psi

4.2. The water tank is intended to be automatically replenished via an altitude control valve installed within an underground vault. The altitude control valve modulates based on tank water level/pressure to maintain adequate water supply by drawing from the commercial water supply. The existing altitude control is located in a 8” pipe, and is currently inoperable.

4.2.1. The metal plate on the altitude valve is faded but is interpreted to the best of Governments ability to read:

4.2.1.1. Size & Cat No. - 8 / 210-01AB

4.2.1.2. Stock No. - 210-01-215J

4.2.1.3. Code: PR

5. General Tasks

5.1. Protect surrounding vehicles and equipment. Minimize potential Foreign Object Debris (FOD).

5.2. The Contractor shall install and maintain a construction boundary fence to clearly identify limits of construction site.

5.3. All Government provided documents are for reference only. The Contractor is encouraged field verify all existing conditions and dimensions during scheduled site visit.

5.4. The Contractor shall observe all applicable Occupational Safety and Health Administration (OSHA) and

State safety precautions pertaining to the contract.

5.5. Clean job site daily during the progress of work. The Contractor shall be responsible for off-site disposal of all demolition debris and excess material, unless otherwise indicated by the Government (see paragraph ten). The project site shall be restored to initial condition prior to final acceptance by the Government. This is to include the removal of any temporary fencing or material the Contractor installs and repairing and resodding any distributed ground or vegetation.

5.6. The Contractor shall coordinate inspections prior to commencing and during critical elements of work and/or as required by the Contracting Officer’s Representative (COR). If a COR is not assigned, the Contractor shall coordinate with the Contracting Officer. The completion of a Government inspection does not relieve the Contractor of its responsibility to comply with required project documents, codes, or the need to provide quality materials and workmanship.

5.7. The Contractor shall request a Pre-Final Inspection from the Contracting Officer at or near the 75% completion status to verify that the project does not have deficiencies which require re-work before proceeding to 100% complete and ready for final acceptance. At 100% complete, the Contractor shall request a Pre-Final Inspection in order to develop a Pre-Final Inspection Punch List as a result of this inspection. The Contractor shall ensure that all items on this list have been corrected before notifying the Contracting Officer to schedule a Final Acceptance Inspection.

5.8. The Contractor shall request a Final Acceptance Inspection from the Contracting Officer to perform final inspection and acceptance of the project. Notify the Contracting Officer at least 14 days prior to the Final Acceptance Inspection and include the Contractor's assurance that all specific items previously identified to the Contractor as being unacceptable, along with all remaining work performed under the contract, will be complete and acceptable by the date scheduled for the Final Acceptance Inspection.

6. Deliverables: The Contractor shall provide the following deliverables:

6.1. Proof of insurance.

6.2. Electronic submittals of any drawings and specifications included in this project.

6.3. Meeting minutes for each progress meeting, updated schedule by task and planned work.

6.4. Letter of Guarantee that warrants the project against defects in materials and workmanship for one year from the date of final acceptance.

6.5. Minimum one (1) year on all workmanship and standard manufacturer’s warranty on products.

7. Government Furnished Property: Electrical power and water shall be provided as required. The Contractor is responsible for any required connections.

8. Security: The Contractor is responsible for obtaining and maintaining all necessary base access for its personnel, including subcontractors. The Contractor shall submit all base access requests to the Government point of contact no less than fourteen (14) business days prior to the required access date. The Government is not responsible for delays related to processing base access requests.

8.1. Access may be denied to individuals deemed security risks, including, but not limited to, those with:

8.1.1. Active arrest warrants or felony convictions

8.1.2. Illegal drug involvement

8.1.3. Registration on a sexual offender registry

8.1.4. Convictions/charges related to disrespect for the law

8.1.5. Lack of proper documentation for non-U.S. citizens

8.2. The installation utilizes the following access procedures:

8.2.1. Daily/Weekly/Monthly Visitor Passes: Obtained at the NAS JRB Fort Worth Visitor Control Center

(VCC). The Contractor is responsible for any delays associated with this process. Contact the Visitor Control Center at 817-782-3058 for hours of operation.

8.2.2. Pass requests are submitted to VCC via 136 CE. Duration of issued pass is determined by contract length and access request methods.

8.3. Concealed carry, open carry, and personal firearms of any kind are NOT allowed on base. Vehicles may be searched upon entering the installation.

9. Cultural Resources: The Contractor shall halt any ground disturbance activity if any Native American or other historical artifacts, fossils, human remains, unmarked graves, or burial sites are found. Report any possible observations to the Contracting Officer. The Contracting officer shall suspend performance at the site of work and notify the Base Civil Engineer and Environmental Office. Performance cannot resume until directed by the Contracting Office.

10. Disposal: All waste products and debris from facility washing and prep shall be collected for disposal; wash water shall be filtered free of debris before being allowed to leave the work site via the soil or a waterway.

Wastes related to facility surface coating shall also be collected, to include paint debris/materials, spent paints, solvents, empty containers, rags, brushes, rollers, clothing, filtering and barrier materials, etc. The surface prep debris and surface coating wastes shall be collected in appropriate closed containers, labeled: “UNIVERSAL WASTE – PAINT AND PAINT-RELATED WASTES”, and coordinated for disposal by the Government through the 136th Environmental Office. Other non-hazardous waste or debris shall be removed by the Contractor from the base and disposed at an appropriately permitted facility.

11. Place of Performance: The Contractor shall perform all work at the 136th Airlift Wing located on Naval

Air Station Joint Reserve Base Fort Worth in Texas (76127). The Contractor shall use Government approved space for storing equipment and materials. The Contractor is responsible to provide appropriate fencing with gate(s) which can be locked when not in use. At the end of each workday, the

Contractor shall clear all equipment and materials from the work site.

12. Period of Performance: The Contractor shall complete delivery and/or installation within 60 calendar days after receipt of Notice to Proceed. The normal business hours for the 136th Airlift Wing are 6:30AM to 5:15PM, Tuesday through Friday. The 136th Airlift Wing observes all Federal Holidays, which often results in shifted workweeks; holiday and shifted workweek schedules will be provided to the Contractor. The Contractor shall submit a request to work hours other than normal business hours to the Contracting Officer at least one-week prior to need date.

13. Pricing. The Contractor shall submit a firm-fixed-price proposal. The proposal shall include all labor, materials, equipment, and services necessary to complete the specified Government objective, including but not limited to the tasks outlined in this Statement of Work.

14. The Contractor shall adhere to all applicable regulations, standards, specifications, UFCs, and UFGSs.

References of particular importance include:

14.1. NFPA 101, Life Safety Code

14.2. NFPA 13, Standard for the Installation of Sprinkler Systems

14.3. NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Sys

14.4. UFC 1-200-01 DOD Building Code (General Building Requirements)

14.5. UFC 3-201-01 Civil Engineering

14.6. UFC 3-600-01 Fire Protection Engineering for Facilities

14.7. UFC 3-601-02 Fire Protection Systems Inspection, Testing, and Maintenance

14.8. UPC – Uniform Plumbing Code

14.9. UFGS 01 30 00 Admin Requirements

14.10. UFGS 01 33 00 Submittal Procedures

14.11. UFGS 01 35 26 Governmental Safety Requirements

14.12. UFGS 01 45 00 Quality Control

14.13. UFGS 01 45 35 Special Inspections

14.14. UFGS 01 74 19 Construction Waste Management and Disposal

14.15. UFGS 01 78 00 Closeout Submittals

14.16. UFGS 01 78 23 Operations and Maintenance Data

15. Government Point of Contact:

15.1. Base Contracting Officer: Captain Donald Crabtree, (817) 852-3307, donald.crabtree.3@us.af.mil

15.2. Contract Specialist: Mr. Fletcher Weems, (817) 852-3310, fletcher.weems.3@us.af.mil

15.3. Project Engineer: Major Nate Norton, PE, (817) 852- 3323, nathaniel.norton@us.af.mil

15.4. Project Manager: Mr. David Shamburger, (817) 852-3328, david.shamburger.5@us.af.mil

15.5. CES Operations Manager: MSgt David Jones, (817) 852-3345, david.jones.233@us.af.mil

15.6. CES Operations Manager: MSgt Michael Meeks, (817) 852-3336, michael.meeks@us.af.mil

END OF SECTION