Attachment 1 - PWS VTE Svc Contract-Solicitation.pdf
PDF 289 KB Posted
- Attached to
- 99 CES VTE Elevator Maintenance recompete
- Solicitation number
- F3G3CE4095AW02
About this file
This document is a Performance Work Statement (PWS) for providing vertical transportation equipment (VTE) maintenance, repair, and inspection services at Nellis Air Force Base. The contractor shall provide all management, tools, supplies, equipment, parts and labor necessary to maintain, repair, and inspect the VTEs in a manner that ensures continuous and safe operation. The PWS details the required maintenance and inspection services, response times for routine and emergency calls, performance objectives and thresholds, security and safety requirements, and other general information. The contractor shall develop a Maintenance Control Program and Quality Control Program to ensure services are performed per applicable standards and codes. The work is a full maintenance contract, with certain alterations and services excluded. The government will periodically evaluate contractor performance. The PWS includes appendices listing the VTEs, their inspection and testing status, and equipment location maps.
The related federal contract opportunity is a solicitation for these VTE maintenance, repair, and inspection services at Nellis Air Force Base. It is a combined synopsis/solicitation for commercial services issued as a small business set-aside. The contract will be a firm-fixed price type with a base period of performance from 16 Oct 2024 to 15 Oct 2025, and four 12-month option years. Offerors must complete a price list and provide a technical proposal, past performance information, and other required documents by the offer due date of 16 Sep 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 4 - Past Performance Evaluation Survey-UPDATED.docx | DOCX document | |
| Attachment 3 - Combo Synopsis.docx | DOCX document | |
| Attachment 2 - Price List.xlsx | XLSX spreadsheet | |
| Attachment 3 - Combo Synopsis.docx | DOCX document | |
| Attachment 4 - Past Performance Evaluation Survey.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
VERTICAL TRANSPORTATION EQUIPMENT
MAINTENANCE, REPAIR, AND INSPECTION
SERVICES
16 OCTOBER 2024
PERFORMANCE WORK STATEMENT (PWS) FOR
VERTICAL TRANSPORTATION EQUIPMENT MAINTENANCE, REPAIR, &
INSPECTION SERVICES
1. DESCRIPTION OF SERVICES. The Contractor shall provide all management, tools, supplies, equipment, parts and labor necessary to maintain, repair, and inspect the real property vertical transportation equipment (VTE) at Nellis Air Force Base in a manner that will ensure continuous and safe operation (full maintenance and repair with the exception of the exclusions listed in paragraph 2 below). The VTE and their locations are listed in Appendix A. NOTE: The term “VTE” in this Performance Work Statement (PWS) includes all equipment listed in Appendix A: passenger elevators.
1.1. This full maintenance contract signifies a VTE service provider (Contractor) takes total service responsibility for the equipment identified in the contract. Except those services covered in paragraph 2 below, the monthly fixed price includes all inspections, maintenance, repairs, replacements, and routine and emergency service calls. This contract allows the Government to budget total yearly costs and eliminates concerns relating to individual parts repair or replacement invoicing. The Contractor assumes all responsibility and determines the amount of service visits and types of service required to keep the VTE operating safely and within the performance objectives of paragraph 6.
1.2. Work conducted on VTE will be in accordance with the American Society of Mechanical Engineers (ASME) A17.1-2016 (or applicable code for year VTE put in service) Safety Code for Elevators and Escalators (ASME A17.1); ANSI/ASME A17.2-2014, Guide for Inspection of Elevators, Escalators, and Moving Walks (applicable to equipment); A17.3-2015, Safety Code for Existing Elevators and Escalators (applicable to equipment and state) (State of Nevada adopted ASME A17.3 (2020) on August 1, 2021). National Fire Protection Association Standards (NFPA);
Unified Facilities Criteria (UFC) 3-600-01; Fire Protection Engineering for Facilities, Occupational Safety and Health Administration (OSHA) Standards and the recommendations of the original equipment manufacturer (OEM).
2. EXCLUDED SERVICES. The following are not covered in the full maintenance service arrangement and are considered over and above services:
2.1. Alterations (a.k.a., modernizations) are not covered in the full maintenance service arrangement. (See Paragraph 3.2)
2.2. Acts by parties other than the Contractor of vandalism, abuse, negligence, damage resulting from rescue and recovery operations, acts of God (including damage resulting from emergency power generator power spikes and low quality) are not included in the contract.
2.3. Additional items excluded in the full maintenance coverage are cosmetic, construction, ancillary components of the VTE system including the finishing, repairing or replacement of the cab enclosure, ceiling frames, hoistway door panels, door frames, sills, car flooring, floor covering, main line power switches, main power breaker(s), hydraulic elevator jack outer housing, buried piping, smoke and fire sensors, fire service reports, main communication feeders to controller, security systems, batteries for emergency lighting and lowering that are not solely dedicated to the VTE, air conditioners, and heaters.
2.4. Routine cleaning and refinishing of the interior of cars and the exterior of the hoistway doors and frames is not included in the basic full maintenance service.
2.5. In the event the Contractor encounters an “excluded item” of work included in paragraph 2.1 through 2.4, the Contractor shall immediately report the situation to the Contracting Officer’s Representative (COR). The Contractor shall provide a written “exclude item” report to the COR to include the work location, a detailed scope of the required work, justification for Contractor determination why the work is not included in the contract, and an itemized repair service cost estimate (quote). The Contractor’s cost estimate shall include the estimated repair time, itemized list of repair parts, material cost breakout and a breakdown of labor hours (cost per labor hour/number labor hours). The Government will not accept lump sum pricing for any services requested. The Contractor’s written “exclude item” report and repair service cost estimate (quote) shall be provided to the COR in writing within two (2) business days of the identification of any repairs not covered in the full maintenance service contract. NOTE: Any part, component or assembly unavailable from the manufacturer due to obsolescence, remains the Contractor’s responsibility to obtain an engineered equivalent product from a commercial source.
3. DEFINITIONS:
3.1. Maintenance, Repair and Replacement. Maintenance, repair, and replacement are on existing VTE and included in the contract scope of services. All maintenance, repair, and replacement of damaged, broken, or worn parts are to be done in a manner that ensures that the equipment may be operated safely. Maintenance, repair, and replacement are actions to restore equipment to a state in which it may safely perform its required operations as installed in accordance with the manufacturer’s recommendations. See ASME A17.1 for requirements.
3.2 Alteration. An alteration is also on existing VTE but is not included under the full maintenance service arrangement. Alteration/modernization will be covered on an over and above Contract Line Item, or it may result in a modification to the contract. The typical alteration results in a betterment to the safe operation of the equipment. In the case of elevators, when an alteration is made, all affected safety requirements must be complied with. All work as part of an alteration is required to comply with specific requirements of the current ASME A17.1 code edition. See ASME A17.1 for requirements.
4. MAINTENANCE AND INSPECTION SERVICES:
4.1. The Contractor with the CO/COR (or representative) shall determine the working order and condition of all VTE listed in Appendix A within five (5) calendar days of contract award. The Contractor shall provide the CO/COR a written VTE acceptance letter within ten (10) calendar days of contract award. The Contractor’s VTE acceptance letter shall list all accepted VTEs and/or list any VTEs not accepted with written justification as to why the Contractor determined the VTE was not in safe working order or serviceable condition. The Contractor shall provide the CO/COR an itemized repair service cost estimate (quote) for any nonaccepted VTE to include estimated repair time, itemized list of repair parts, material cost breakout and a breakdown of labor hours (cost per labor hour/number labor hours). The Government will either replace missing items or repair all items not in working order or serviceable condition, or the CO will direct the Contractor to replace the missing items, accomplish the repair, and reimburse the Contractor in accordance with approved repair service quote. The CO will give instructions for situations where a VTE requires a level of repair potentially constituting alteration as described by paragraph 3. The Contractor and the CO shall certify their agreement as to the working order of the equipment. All repair work shall be in accordance with standard commercial practices using only new parts of equal quality specified by the VTE manufacturer in effecting repairs (substitution of a different component is only permitted where it is equivalent to that which was tested, as determined by the certifying agency).
4.2 The Contractor shall develop and submit to the CO/COR an annual written Maintenance Control Program (MCP) for each VTE within fifteen (15) calendar days after contract award to cover the basic contract and any option periods. The MCP shall, at a minimum, include required inspections, timelines for inspections, maintenance to be performed and the interval schedule maintenance will be performed. The MCP is required to specify an appropriate interval maintenance schedule for specific maintenance items with a written maintenance completion report provided monthly to COR per para 4.3. The Contractor shall perform inspections and maintenance of all VTE in accordance with the MCP. The MCP shall ensure compliance with all minimum code requirements.
4.3. The Contractor shall perform maintenance in accordance with the MCP to ensure reliable and continuous safe operation. The maintenance work shall be in accordance para 1.2 and with commercial practices and/or manufacturer’s specifications, if available, and shall be intended to maintain the VTE in safe and reliable operating condition. The Contractor shall prepare and submit to the COR a written monthly VTE maintenance completion report. The report shall identify the VTE maintenance completed in accordance with MCP interval schedule, the date the maintenance was completed, the VTE elevator and building number the maintenance was completed on, and the name of the elevator mechanic who completed the maintenance.
4.4. The Contractor shall perform daily cleanup of job sites and equipment spaces in conjunction with maintenance, inspections, tests, and repair services.
4.5. The Contractor shall perform necessary elevator inspections and tests as required under ASME A17.1 Appendix N, using a certified state Qualified Elevator Inspector (QEI) who is independent of the Contractor’s company and certified in accordance with Nevada Code (NAC 455C.130). The Contractor shall schedule and complete annual elevator inspections and testing prior to the end the month of the last annual elevator inspection/testing date reflected in Appendix C and subsequent inspection completion dates thereafter. The “initial” annual elevator inspection for Bldg 1771 elevator shall be completed by the Contractor within the first 60 days of contract award. The Category Five (CAT 5) year tests shall include all traction elevators, roped hydraulic elevators, and all hydraulic elevators with rupture valves. The Category Three (3) year tests are not required to be performed at Nellis Air Force Base due to “zero” installed water hydraulic elevators located on base/listed on Appendix A: VTE Equipment List. (Note: Category 3 tests are performed every
3 years only on water hydraulic type elevators. Specifically, test is performed on the unexposed portions of roped water hydraulic elevators and pressure vessels.)
4.6. The Government may perform inspections of the VTE at no cost to the Contractor for purposes of capital asset management and quality assurance. If discrepancies are discovered during these inspections, the Contractor will be notified in writing of any determination and may be responsible for the corrective actions.
4.7. The Contractor shall prepare and submit a written inspection and testing report to COR within two (2) business days of the completed inspection and testing service. The report shall identify each VTE, the location, inspections and testing performed, maintenance work performed, noted discrepancies, repairs needed, date of inspection and testing, overall condition of the VTE, and the printed name and signature of the QEI who performed the inspection. The Contractor shall securely post/affix annual elevator inspection and testing certification tags to the elevator controller in elevator mechanical room and post an annual elevator certification of inspection in the cab of the elevator in full view of all passengers (or post a permanent sign in the elevator cab that identifies the location of the annual elevator certification of inspection if posted in the elevator mechanical room). The annual elevator certification of inspection shall include at a minimum:
elevator company name, elevator identification information, type of inspections and tests performed, date inspections and tests were completed, printed name of inspector and inspector’s certification number.
4.8. The Contractor shall prepare and submit a written annual elevator inspection Notice of Violation discrepancy status report to COR within five (5) business days after annual elevator inspection completion date, identifying the party “Contractor” and/or “Government” who is responsible to resolve the identified inspection discrepancy for concurrence by COR. The CO will be notified by COR to resolve any disputes on resolution responsibility.
4.9. The Contractor shall resolve all identified “Contractor responsible” noted annual elevator inspection Notice of Violation discrepancies within sixty (60) calendar days after the annual elevator inspection completion date. The Contractor shall provide to COR a written report from the QEI who performed the inspection, certifying all the “Contractor responsible” noted annual elevator inspection discrepancies have been resolved by Contractor. The Contractor shall provide written justification to CO/COR as to why any noted “Contractor responsible” inspection discrepancies cannot be resolved within the 60 calendar days of annual elevator inspection completion date, provide an estimated resolution date and provide follow-on written confirmation from QEI when discrepancy has been resolved.
4.10. The Contractor shall maintain a copy of all current VTE inspection and testing documentation, along with an index indicating the location, date inspected/tested, and date of the next required inspection/testing having provided the original to the CO/COR. The index and copies of certificates shall be delivered to the CO/COR upon request; however, no later than one
(1) business day of a request to review.
5. REPAIR SERVICE CALLS. The Contractor shall provide service calls (routine and emergency) under the full maintenance service agreement at no additional charge. All repair work shall be done in accordance with standard commercial practices. The Contractor shall repair and replace components of the VTE at no additional cost to the Government. When a component in a labeled product is replaced, it must be replaced with an identical component manufactured under the original labeling service (certifying agency). Substitution of a different component is only permitted where it is equivalent to that which was tested, as determined by the certifying agency.
The parts used for replacement are required to comply with all the requirements that the old parts originally complied with. The Unified Facilities Guide Specifications (UFGS) and the UFC will be used to benchmark acceptable replacement components. See UFGS 14 21 00. 00 20 Electric Traction Elevators, UFGS 14 21 13 Electric Traction Freight Elevators, UFGS 14 21 23 Electric Traction Passenger Elevators, and UFGS 14 2 00 Hydraulic Elevators for guidance.
5.1. Routine Calls. Service calls shall be classified as routine when the work or adjustments do not qualify as an emergency call.
5.1.1. The Contractor shall provide the COR a 24-hour service call/dispatch telephone contact number. The COR or designated government representative will call in routine service calls to the 24-hour service call/dispatch contact number provided to the COR by the Contractor.
5.1.2. The Contractor shall respond in-person to the VTE and begin work on routine service calls at no additional cost to the Government within twenty-four (24) hours after receipt of the call during regular scheduled workdays/hours of operation at Nellis AFB, Mon - Fri, 07:00 AM - 4:00 PM, excluding federal holidays.
5.1.3. The Contractor shall report to the work location, survey the repair, execute covered repairs, or provide the COR an estimate of time and cost of any repairs not covered in the full maintenance service contract, but necessary to bring the VTE back to operation. The VTE repair service quote shall be provided to the COR in writing within two (2) business days after identification of an “excluded item” of work per para 2.5. The Contractor shall commence non-covered repair work after approval notification from the CO/COR. The Contractor shall prepare and submit to the CO/COR a written report within one (1) business day after the routine repair. The report shall include the date and time of the service call, the location of the VTE, the repairs performed, and the name of the technician performing the repairs.
5.2. Emergency Calls. Emergency calls are defined as calls made for services when a VTE system fails and constitutes a danger to personnel; threatens to damage properties; or threatens to disrupt activity, operations, and/or training missions.
5.2.1. The Contractor shall provide the COR a 24-hour service call/dispatch telephone contact number. The COR or designated government representative will call in emergency service calls to the 24-hour service call/dispatch contact number provided to the COR by the Contractor.
5.2.2. The Contractor shall respond in person to the VTE and begin work on emergency service calls within two (2) hours after receipt of the call 24 hours a day/7-days a week.
5.2.3. The Contractor shall report to the work location, survey the repair, execute covered repairs, and provide CO/COR an estimate of time to repair and cost of any repairs not covered in the basic full maintenance service contract, but necessary to bring the VTE back to operation. The VTE repair service quote shall be provided to the COR in writing within two (2) business days after identification of an “excluded item” of work per para 2.5. The Contractor shall commence non-covered repair work after approval notification from the CO/COR. The Contractor shall prepare and submit to the CO/COR a written report within one (1) business day after the emergency repair.
The report shall include the date and time of the service call, the location of the VTE, the repairs performed, and the name of the technician performing the repairs.
6. SERVICES SUMMARY. The Government will evaluate the Contractor performance in accordance with the following criteria. Performance evaluations will be rendered in one or more Government databases for that purpose.
Performance Objective PWS Para Performance Threshold
1. Written Maintenance Control Program (MCP) for each VTE for all equipment.
MCP identifies all maintenance intervals to include necessary inspections and tests.
4 MCP in accordance with ASME A17.1 submitted to CO/COR in 15 calendar days of contract award.
2. VTE Service Availability 4 VTE availability is 95%.
Calculation = ((sum of all VTE * # days in service during the selected month for each VTE) / (# VTE * # days in the selected month)).
3. Repair Service Call Routine – Response Time.
Response to routine calls within time specified in paragraph 5.1.2.
5 Response to routine service calls are on-time 95% of the time on a monthly basis.
4. Repair Service Call Emergency – Response Time.
Response to emergency calls within time specified in paragraph 5.2.2.
5 Response to emergency service calls are on-time 100% of the time on a monthly basis.
5. Service Call Repairs – Repair Quality.
Repairs are of high quality resulting in reduced call backs.
5 Only two call backs of the same problem (same instance) each month.
5. Inspections – MCP Adherence 4 Inspections performed in accordance with MCP 100%
6. Preventative Maintenance - MCP Adherence
2, 3 ,4 & 5 Preventative maintenance performed in accordance with MCP 100% of the time.
7. Reporting 2, 4 & 5 Submit reports in a manner consistent with PWS 95% of the time each month.
7. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The Government does not anticipate providing any government furnished property (GFP).
8. GENERAL INFORMATION.
8.1. QUALITY CONTROL. The Contractor shall develop and maintain a quality control program (QCP) to ensure maintenance and repair services are performed in accordance with ANSI/ASME A17 and other applicable standards and codes. The Contractor shall develop and implement procedures to eliminate reoccurrence of once identified/repaired defects. As a minimum, the Contractor shall develop quality control procedures that address the areas identified in Paragraph 6, Services Summary. The QCP shall demonstrate how the Contractor ensures quality performance during the contract period of performance. The Contractor shall maintain the QCP throughout the period of performance of the contract. The CO/COR will be provided updates to the QCP as they occur during the period of performance. The QCP will identify the procedures in writing for inspections, individual responsible, VTE MCP, and the location of all inspection records and key control logs which will always be available to the government upon request. The QCP will have the inspection forms and records which will be used for the service. The Contractor will identify to the CO/COR the responsible quality control inspector to notify in case of customer complaints.
8.2. QUALITY ASSURANCE. The Government will periodically evaluate the Contractor’s performance in accordance with the Quality Assurance Surveillance Plan.
8.3. HOURS OF OPERATION. Regular scheduled workdays/hours of operation at Nellis Air Force Base are Mon - Fri, 07:00 AM - 4:00 PM, excluding federal holidays. The recognized federal holidays include: New Year's Day, Martin Luther King Day, Presidents Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Days, Thanksgiving Day and Christmas Day. If the federal holiday falls on Saturday, it is observed on Friday and if the federal holiday falls on a Sunday, it is observed on Monday.
8.4. SECURITY REQUIREMENTS. The Contractor shall obtain a base access pass or Defense Biometric Identification System (DBIDS) card as required for his/her employees and/or subcontractors to enter the Nellis Air Force Base military installation prior to start of work. The Contractor shall submit Nellis Air Force Base access pass/DBIDS card requests for employees to the COR at the time of contract award, prior to each subsequent exercised contract period of performance and prior to start of work for any new employees. The contractor shall be responsible for all access passes/DBIDS cards issued to his/her employees and/or subcontractors under this contract. The Contractor shall comply with REAL ID Act requirements IAW Public Law 109-13, 49 U.S.C. Section 30301 and Code of Federal Regulations (CFR) Title 6, Part 37. Nellis AFB Pass and Registration Security Forces will conduct a background check on all Contractor employees requesting a base access pass/DBIDS card. Upon termination of employment, the Contractor shall be responsible for returning issued base passes/DIBIDS cards to Security Forces or COR within 24 hours. The Contractor shall also ensure all contractor vehicles have a company logo clearly displayed on vehicles entering the Nellis AFB military installation in the performance of this contract. Contractor vehicles are subject to inspection upon base access. Anticipate extended delays in getting commercial vehicles on base due to vehicle inspection requirements and allow time for commercial vehicles to reach their destination by driving designated routes at posted speed limits throughout the base. Procedures for commercial vehicle access to the base are subject to change without prior notice. Air Force installation base access requirements are contained in Air Force Federal Acquisition Regulation Supplement “5352.242-9000, Contractor
Access to Air Force Installations." The Contractor shall also provide physical security for the equipment under his control. The Government shall not be liable for any unsecured equipment.
8.5. SAFETY REQUIREMENTS. The Contractor shall conform to the safety requirements contained in this contract for all activities related to the accomplishment of the work under this contract. The Contractor shall perform work in a safe manner as required by OSHA 2206 (29 CFR 1910), General Industry Safety and Health Standards. Additionally, the Contractor shall provide protection to Government property to prevent damage during the period of time the property is under the control or in possession of the Contractor.
8.6. CONTINUATION OF ESSENTIAL DEPARTMENT OF DEFENSE SERVICES
DURING CRISIS DECLARED BY THE NATIONAL COMMAND AUTHORITY OR
OVERSEAS COMBATANT COMMANDER. Contractor services under this contract are mission-essential; thus, contractor services are required to be continued during crisis IAW DoDI 3020.37.
8.7. SPECIAL QUALIFICATIONS. The Contractor shall be licensed by the state in which the work is conducted to provide the services specified in this contract (State of Nevada Elevation and Conveyance (Class C7) Contractor’s License). All work will be performed by personnel who are trained and qualified for the systems and equipment serviced. Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements in repair service of VTE Elevators (State of Nevada Mechanical Compliance Section Elevator Mechanic Certification in accordance with Nevada Administrative Code: 455C). The Contractor shall provide the certification documentation to CO/COR upon request.
8.8. SCHEDULE COORDINATION. The Contractor shall be responsible for coordinating all phases of his/her operations with the appropriate base personnel through the CO/COR. The facilities shall remain in operation while the Contractor is working, and it is up to the Contractor to coordinate around the normal activities of the facility.
8.9. CONTRACT REPRESENTATIVE POINTS OF CONTRACT. The Contractor shall provide the COR the names of a primary and alternate Contract representative to contact for all contractual matters to include their telephone contact numbers and email addresses. The Contractor’s appointed representative shall have the ability to speak on behalf of the Contractor and have authorization to make decisions for the Contractor regarding this contract.
8.10. APPEARANCE AND CONDUCT. The Contractor shall ensure their employees present a neat appearance and be easily recognized as Contractor employees while on the military installation in conjunction with the execution of this contact. This shall be accomplished by wearing distinctive clothing bearing the company name or logo or by wearing appropriate badges with the company name and employee’s name in English that is visible at all times. Contractor personnel shall also always comply with all base regulations and shall conduct themselves in a profession al manner.
8.11. ENVIRONMENTAL CONTROL. The Contractor shall comply and assure that all subcontractors comply with all applicable federal, state, and local laws, regulations, ordinances, policies and standards related to environmental matters. Where applicable, the Contractor shall use environmentally safe products in the course of completion of their project. The Contractor shall maintain, in company vehicle on site, Safety Data Sheets (SDS) for all chemicals. The SDS data is subject to random checks by the government. A copy of all SDS will be provided to the CO/COR upon request. The Contractor shall maintain, and provide on demand, an inventory of materials being brought on to the military installation/used in Government facilities. The Contractor shall complete, and provide on-demand, monthly inventories of HAZMAT used, including but not limited to, solvents, paints, degreasers, greases, Ozone Depleting Substances, and oils brought on to the military installation/used in Government facilities. If the Contractor spills or releases any HAZMAT or other substance contained in 40 CFR 302 into the environment, the Contractor shall immediately notify the CO/COR and appropriate emergency responders. The Contractor is responsible for all costs associated with clean-up and restoration, including any applicable fines and/or penalties. The Contractor shall maintain a spill plan as required by federal, state, and local laws and regulations.
8.12. ASBESTOS. The Contractor shall comply with Section 29 CFR 1910.1001(j)(7)(iv). VTE may be located in facilities that may contain ACM or PACM. The Contractor (not the Government) shall determine if any exposure to ACM may result in performing work under the contract.
APPENDICES.
A. Vertical Transportation Equipment (VTE) Listing
B. Vertical Transportation Equipment (VTE) Last Annual Inspection/CAT 5 Test Date 2024
C. Vertical Transportation Equipment (VTE) Location Maps
Appendix A Vertical Transportation Equipment (VTE) Listing
# VTE
Type Bldg Organization Address Manufacturer Type Floors Capacity
(LBS)
Year Installed
CAT 5
Required
1 Elevator 7 99 ABW & 57 WG CCs (Outdoor Elev Entrance)
4430 Grissom Ave
Westinghouse Hydraulic 2 3,000 1988 N/R
2 Elevator 20 99 FSS (99 ABW) 4475 England Ave
Dover/Motion Cntrl Engr –
MCE (TKE)
Hydraulic 3 2,100 1997 N/R
3 Elevator 119 USAFWS / 26 WPS
(MQ-9) (57 WG)
4276 Tyndall Ave
KONE Traction 2 3,500 2016 YES
4 Elevator 120 USAFWS / 26 WPS
(F-35A) (57 WG)
4280 Tyndall Ave
KONE Traction 2 3,500 2016 YES
5 Elevator 200 NV Test & Training Range (NTTR)
3770 Duffer Dr Schumacher / Virginia Controls
Hydraulic 2 4,000 2010 N/R
6 Elevator 201 (P1)
57 OG / 414 CTS (Red Flag) (57 WG)
3662 Tyndall Ave
Motion Control Engineering-MCE
Hydraulic 2 4,000 1997 N/R
7 Elevator 201 (P2)
57 OG / 414 CTS (Red Flag 5th Gen) (57 WG)
3662 Tyndall Ave
Schindler (SEC) (Model 350A)
Hydraulic w/ Rupture Valve
2 3,500 2022 YES
8 Elevator 202 805 CTS (Shadow Operations Center - Nellis (ShOC-N) (505 CTG)
3663 Tyndall Ave
Century / Virginia Controls
Hydraulic w/ Rupture Valve
2 3,500 2003 YES
9 Elevator 244 757 AMXS (Strike AMU)
(57 WG)
3899 Tyndall Ave
Schindler (SEC) Hydraulic w/ Rupture Valve
2 2,500 2007 YES
10 Elevator 257 57 AMXS (F35) (Bolt AMU) (57 WG)
3991 Tyndall Ave
TKE Hydraulic w/ Rupture Valve
2 3,500 2017 YES
11 Elevator 259 57 AMXS (F35, Lightning
AMU) (57 WG)
3992 Tyndall Ave
OTIS Hydraulic w/ Rupture Valve
2 2,500 2011 YES
12 Elevator 282 USAFWS / 57 WPSS
(57 WG)
4269 Tyndall Ave
TKE Hydraulic w/ Rupture Valve
2 2,100 2007 YES
13 Elevator 297 857 AMXS (Tomahawk
AMU) (F16C/D) (57 WG)
6250 Fitzgerald Blvd
TKE Hydraulic w/ Rupture Valve
2 2,100 2008 YES
14 Elevator 332 926 WG (926 GP) (AF Reserve)
4300 Plattsburgh Ave
TKE Hydraulic w/ Rupture Valve
3 3,500 2022 YES
15 Elevator 334 926 WG (926 GP) (AF Reserve)
4325 Plattsburgh Ave
TKE Hydraulic w/ Rupture Valve
4 3,500 2009 YES
16 Elevator 465 (P1)
99 FSS / VAQ (99 ABW)
P1, Right Passenger Elev
4079 Duffer Dr Motion Control Engineering-MCE
Hydraulic 3 2,100 1997 N/R
17 Elevator 465 (P2)
99 FSS / VAQ (99 ABW)
P2, Left Passenger Elev
4079 Duffer Dr Motion Control Engineering-MCE
Hydraulic 3 2,100 1997 N/R
18 Elevator 466 99 FSS/VAQ (99 ABW) 4083 Duffer Dr Motion Control Engineering-MCE
Hydraulic 3 3,500 1998 N/R
19 Elevator 556 (P1)
99 FSS/Lodging (99 ABW) P1, Right Main Lobby
5941 Fitzgerald Blvd
TKE Hydraulic w/ Rupture Valve
4 3.500 2004 YES
20 Elevator 556 (P2)
99 FSS/Lodging (99 ABW) P2, Left, Main Lobby
5941 Fitzgerald Blvd
TKE Hydraulic w/ Rupture Valve
4 3.500 2004 YES
21 Elevator 556 (P3)
99 FSS/Lodging (99 ABW) P3, Right, SW Lobby
5941 Fitzgerald Blvd
TKE Hydraulic w/ Rupture Valve
4 3.500 2004 YES
22 Elevator 556 (P4)
99 FSS/Lodging (99 ABW) P4, Left, SW Lobby
5941 Fitzgerald Blvd
TKE Hydraulic w/ Rupture Valve
4 6,000 2004 YES
23 Elevator 1705 99 FSS / Fitness Ctr
(99 ABW)
3705 Freedom Circle
Schindler (SEC) Hydraulic w/ Rupture Valve
2 4,500 2011 YES
24 Elevator 1771 365 ISR Group (363 ISR
WG)
3900 Kinley Ave
TKE Hydraulic 2 3,500 2023 YES
25 Elevator 2064 57 OSS / Tower (57 WG) 4110 Perimeter Rd
Dover Traction 5 2,100 1990 YES
26 Elevator 2999 99 FSS / Youth Ctr
(99 ABW)
110 Stafford Dr Dover Hydraulic 2 2,100 1996 N/R
Appendix B Vertical Transportation Equipment (VTE) Last Annual Inspection/CAT 5 Test Date 2024
# VTE
Type Bldg Organization Address Manufacturer Type Last Insp Date
Last CAT 5 Test Date 2024
1 Elevator 7 99 ABW & 57 WG CCs (Outdoor Elev Entrance)
4430 Grissom Ave
Westinghouse Hydraulic 10 May 24 N/R
2 Elevator 20 99 FSS (99 ABW) 4475 England Ave
Dover/Motion Cntrl Engr –
MCE (TKE)
Hydraulic 10 May 24 N/R
3 Elevator 119 USAFWS / 26 WPS
(MQ-9) (57 WG)
4276 Tyndall Ave
KONE Traction 9 May 24 9 May 24
4 Elevator 120 USAFWS / 26 WPS
(F-35A) (57 WG)
4280 Tyndall Ave
KONE Traction 9 May 24 9 May 24
5 Elevator 200 NV Test & Training Range (NTTR)
3770 Duffer Dr Schumacher / Virginia Controls
Hydraulic 6 May 24 N/R
6 Elevator 201 (P1)
57 OG / 414 CTS (Red Flag) (57 WG)
3662 Tyndall Ave
Motion Control Engineering-MCE
Hydraulic 6 May 24 N/R
7 Elevator 201 (P2)
57 OG / 414 CTS (Red Flag 5th Gen) (57 WG)
3662 Tyndall Ave
Schindler (SEC) (Model 350A)
Hydraulic w/ Rupture Valve
6 May 24 6 May 24
8 Elevator 202 805 CTS (Shadow Operations Center - Nellis (ShOC-N) (505 CTG)
3663 Tyndall Ave
Century / Virginia Controls
Hydraulic w/ Rupture Valve
7 May 24 7 May 24
9 Elevator 244 757 AMXS (Strike AMU)
(57 WG)
3899 Tyndall Ave
Schindler (SEC) Hydraulic w/ Rupture Valve
9 May 24 9 May 24
10 Elevator 257 57 AMXS (F35) (Bolt AMU) (57 WG)
3991 Tyndall Ave
TKE Hydraulic w/ Rupture Valve
9 May 24 9 May 24
11 Elevator 259 57 AMXS (F35, Lightning
AMU) (57 WG)
3992 Tyndall Ave
OTIS Hydraulic w/ Rupture Valve
9 May 24 9 May 24
12 Elevator 282 USAFWS / 57 WPSS
(57 WG)
4269 Tyndall Ave
TKE Hydraulic w/ Rupture Valve
9 May 24 9 May 24
13 Elevator 297 857 AMXS (Tomahawk
AMU) (F16C/D) (57 WG)
6250 Fitzgerald Blvd
TKE Hydraulic w/ Rupture Valve
10 May 24 10 May 24
14 Elevator 332 926 WG (926 GP) (AF Reserve)
4300 Plattsburgh Ave
TKE Hydraulic w/ Rupture Valve
10 May 24 10 May 24
15 Elevator 334 926 WG (926 GP) (AF Reserve)
4325 Plattsburgh Ave
TKE Hydraulic w/ Rupture Valve
10 May 24 10 May 24
16 Elevator 465 (P1)
99 FSS / VAQ (99 ABW)
P1, Right Passenger Elev
4079 Duffer Dr Motion Control Engineering-MCE
Hydraulic 8 May 24 N/R
17 Elevator 465 (P2)
99 FSS / VAQ (99 ABW)
P2, Left Passenger Elev
4079 Duffer Dr Motion Control Engineering-MCE
Hydraulic 8 May 24 N/R
18 Elevator 466 99 FSS/VAQ (99 ABW) 4083 Duffer Dr Motion Control Engineering-MCE
Hydraulic 7 May 24 N/R
19 Elevator 556 (P1)
99 FSS/Lodging (99 ABW) P1, Right Main Lobby
5941 Fitzgerald Blvd
TKE Hydraulic w/ Rupture Valve
8 May 24 8 May 24
20 Elevator 556 (P2)
99 FSS/Lodging (99 ABW) P2, Left, Main Lobby
5941 Fitzgerald Blvd
TKE Hydraulic w/ Rupture Valve
8 May 24 8 May 24
21 Elevator 556 (P3)
99 FSS/Lodging (99 ABW) P3, Right, SW Lobby
5941 Fitzgerald Blvd
TKE Hydraulic w/ Rupture Valve
8 May 24 8 May 24
22 Elevator 556 (P4)
99 FSS/Lodging (99 ABW) P4, Left, SW Lobby
5941 Fitzgerald Blvd
TKE Hydraulic w/ Rupture Valve
8 May 24 8 May 24
23 Elevator 1705 99 FSS / Fitness Ctr
(99 ABW)
3705 Freedom Circle
Schindler (SEC) Hydraulic w/ Rupture Valve
9 May 24 9 May 24
24 Elevator 1771 365 ISR Group (363 ISR
WG)
3900 Kinley Ave
TKE Hydraulic Initial Annual Inspection Due
CAT 5 Required
25 Elevator 2064 57 OSS / Tower (57 WG) 4110 Perimeter Rd
Dover Traction 7 May 24 7 May 24
26 Elevator 2999 99 FSS / Youth Ctr
(99 ABW)
110 Stafford Dr Dover Hydraulic 10 May 24 N/R
Appendix C Vertical Transportation Equipment (VTE) Location Maps
PERFORMANCE WORK STATEMENT
File details come from the government source that posted it. Updated .