Attachment 1_PWS Technical Exhibit.pdf

PDF 125 KB Posted

Attached to
Purchase and Installation of Audiovisual Equipment (Reposting)
Solicitation number
47QSSC26Q0190A
Issued by

About this file

Technical Exhibit A: Performance Requirements Summary and Technical Exhibit B: Deliverables Schedule

This document consists of two technical exhibits detailing performance requirements and deliverables for a federal contract. Technical Exhibit A establishes four mandatory performance objectives, all requiring 100% compliance with corresponding incentive measures. The contractor must notify all employees, including subcontractors, of the U.S. Government's zero tolerance policy on trafficking in persons as specified in FAR 52.222-50(c), with documented compliance tracked in the CPAR system. All contractor employees and subcontractors must complete Level I OPSEC training within ten days of employment, with verification provided to the Contracting Officer's Representative (COR) within ten days of completion. Additionally, the contractor must conduct iWATCH program training for all employees per locally developed standards established by the requiring activity ATO, with similar verification requirements to the COR within ten days. Non-compliance with any performance objective results in corrective action, including potential service re-performance.

Technical Exhibit B specifies five deliverables required throughout the contract period. Deliverable 01 requires a Quality Control Plan submitted once in PDF or Word format to the COR. Deliverable 02 mandates a Quality Assurance Plan submitted as issues are identified in electronic format. Deliverable 03 requires an Installation Pass Log submitted once upon initial award and thereafter as required, using a COR-provided template conforming to Fort Irwin DES SOP standards. Deliverables 04 and 05 address individual and contract termination or cancellation procedures, requiring submission of one or all hard copies of passes to the COR as required or upon request.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT A

Performance Requirements Summary (PRS)

Performance Objective (The Service required -usually a shall statement)

Standard Performance Threshold1

Incentive (Positive and/or Negative)

1. Combating Trafficking in Persons FAR 52.222-50 c

The Contractor shall notify its employees of:

a. The United States Government's zero tolerance policy described in paragraph (b) of this clause.

The actions that will be taken against employees for violations of this policy. Such actions may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment.

100% Compliance Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR system; contractor shall re-perform the service.

2. Level I OPSEC Training.

PWS Paragraph 1.24.2

All Contractor employees, including subcontractors, shall complete Level I OPSEC training within ten (10) of employment under this contract. OPSEC Level I training is available at:

http://www.cdse.edu/catalog/elearning/GS130.html.

100% Compliance Verification of the training shall be provided to the COR within ten (10) days after completion of the training.

iWatch Training PWS Paragraph 1.24.3

The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR.

100% Compliance Verification of the training shall be provided to the COR within ten (10) days after completion of the training.

1 This is the Maximum Error Rate. It could possibly be "Zero Deviation from Standard"

TECHNICAL EXHIBIT B

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To Deliverable 01 Quality Control Plan (QCP).

PWS Paragraph 1.5.1

Once Electronic PDF/ Word Doc. COR

Deliverable 02 Quality Assurance Plan PWS Paragraph 1.5.2

As Issues are identified Electronic Email / PDF/ Word Dpc. COR

Deliverable 03 Installation Pass Log. PWS Paragraph 1.6.3.2

Once upon initial award and then as required

Electronic COR Provided Templat IAW Ft. Irwin DES SOP COR

Deliverable 04 Individual Termination or Cancellation PWS Paragraph 1.6.3.2

As Required One (1) Hard Copy of Pass COR

Deliverable 05 Contract Termination or Cancellation

As Required / Upon Request All Hard Copy of Passes COR

TECHNICAL EXHIBIT A
Performance Requirements Summary (PRS)
DELIVERABLES SCHEDULE

File details come from the government source that posted it. Updated .