This is a Performance Work Statement (PWS) for radar foam repair services required by the 162nd Wing Maintenance Group at Morris Air National Guard Base in Tucson, AZ. The contractor must repair and return F-16 Radar Absorption Panels to serviceable condition, specifically addressing six different part numbers including absorbers, structural panels, and radomes that provide protection for radar system microelectronics and improve target detection sensitivity.

The key requirements include: removing defective foam from damaged panels, replacing absorption foam with compliant materials and adhesives, painting panels per specifications, remarking part numbers, and shipping repaired panels to the specified location. The contractor must complete all work at their facility within 30 days of receipt, maintain ISO 9001-2013 quality standards, follow OSHA safety requirements, and provide repair/inspection records via email. The facility must meet commercial industry environmental control standards, and the contractor must provide any applicable commercial warranties. No specific warranty is required beyond workmanship error corrections. Performance standards require 100% compliance with specifications and monthly inspections.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

RADAR FOAM REPAIR

SPECIFICATIONS FOR REPAIR OF AIRCRAFT PARTS for the AIR FORCE REPAIR

ENHANCEMENT PROGRAM (AFREP)

1.0 SCOPE

Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, to perform services required to repair and return F-16 Radar Absorption Panels to a serviceable condition, as defined in this PWS.

1.1 Background

Radar Absorption Panels installed on the F-16 Radar system are intended to provide protection for the radar system’s microelectronics and to improve the target detection sensitivity (capability) of the radar system. The radar absorption panels are of differing sizes and shapes strategically placed around the front of the radar processor package. Over time, the foam absorption material dries out losing its elasticity which results in cracks forming in the material and/or pieces of the foam becoming dislodged from the panels. In either case, the net result is degradation in the radar system protection characteristics which the absorption panels are intended to provide. The part numbers and stock numbers of the panels are identified below.

2.0 APPLICABLE DOCUMENTS

The following documents form a part of this PWS to the extent specified herein. In the event of a conflict between these documents and the contents of this PWS, the contents of the drawing shall take precedence.

2.1 Other Government Documents

T.O. 1F-16C 3-3 53-21-01 Structural Repair T.O. 00-25-234 General Shop Practice Requirements for the

Repair, Maintenance, and Test of Electrical Equipment

Applicable drawings 16B1741, Cover, Bulkhead Upper Assy 16B1742, Cover Bulkhead Lower Assy 16B1743, Cover, Electrical Harness Assy 16B1744, Cover, Antenna Base, Upper Assy 16B1745, Cover Antenna Base, Upper Assy 16B1746, Cover Antenna Base, Lower Assy 16B1726, Cover, Radome 16B1727, Cover, Radome 16B1728, Cover, Radome

3.0 REQUIREMENTS

3.1 General Requirements

3.1.1 The part numbers and stock numbers of the radar absorption panels that are subject to repair under the scope of this statement of work are as follows:

3.1.2 Upon receipt of the unserviceable/damaged radar absorption panels, the contractor shall take those actions necessary to ascertain the condition of each panel and to remove the defective foam from each panel.

3.1.3 Repair of each panel shall be accomplished by replacing the absorption foam with a material compliant with the requirements of the applicable drawing and by using the adhesives specified within the drawing. Note: The contour of the replacement absorption material shall be carefully controlled to ensure the panel will not be an obstruction to the radar antenna when reinstalled on the aircraft.

3.1.4 The contractor shall then prepare and paint each panel with the paint specified within the drawing.

3.1.5 The part number for each panel shall be remarked on each panel as specified within the drawing package.

3.1.6 The repaired panels shall be prepared for return to the customer using best commercial practices and shall be shipped by commercial transportation to the attention of MSgt

NSN Part Number Name

6625-01-330-3327

16B1743-3

Absorber, Radio Frequency

1560-01-333-2249

16B1745-3

Panel, Structural, Aircraft

5985-01-290-4623

16B-1726-1

Radome

6625-01-330-3328

16B1744-5

Absorber, Radio Frequency

5985-01-290-4621

16B1728-1

Radome

1560-01-331-4816

16B1741-3

Panel, Structural, Aircraft

Michael Whitt, 162 MXG/MXQ, 162nd Wing Morris ANG Base, at 6620 S. Air Guard Way, Tucson, AZ 85706.

3.2 Facility Requirements

Facility environmental controls shall meet commercial industry standards for the work being performed.

3.3 Warranties

The government shall be provided the information pertaining to any commercial warranty that has been extended to the contractor during the course of work under this contract.

No other specific warranty shall be offered for the repairs effected to each radar absorption panel other than to correct discrepancies identified as a result of workmanship errors.

3.4 Quality Assurance

The contractor shall maintain a quality assurance inspection program that ensures conformance to contractual requirements and meets the requirements of ISO 9001-2013 or an equivalent quality system model.

3.5 Safety System

The contractor shall conduct a system safety program and comply with Federal Occupational Safety and Health (OSHA) Standard, 1910 and/or other nationally recognized sources of safety, health, and fire prevention standards. Using good safety engineering principles, the contractor shall analyze and evaluate safety factors in the repair of the Radar Absorption Panels.

3.6 Period and Location of Performance

All work shall be accomplished at the contracted entity’s facility and shall be completed within thirty (30) days of receipt of the defective panels.

4.0 Contractor Personnel

4.1 A copy of the repair and inspection record shall be provided to the 162nd Wing AFREP office via e-mail to michael.whitt.1@us.af.mil and richard.moore.12@us.af.mil

5. Service Delivery Summary

Contract Objective: To provide radar foam Repair service to the 162nd Wing Maintenance Group (MXG). The vendor repairs radar foam and returns them to the 162nd Wing in like-new condition.

Deliverable Performance

Standard Acceptable Quality Level

(AQL)

Method Used / Frequency mailto:michael.whitt.1@us.af.mil mailto:richard.moore.12@us.af.mil

Contractor shall furnish the repaired product to the Air Force as the Original Equipment Manufacturer (OEM) intended.

Para. 3.1.1. of PWS Must maintain 100% compliance

Periodic Inspection/ Spot Checks/ Monthly

A record of the repair and test results to be e-mailed to 162nd Wing AFREP

Manager:

michael.whitt.1@us.af.mil and richard.moore.12@us.af.mil

Para. 4.1. of PWS Must maintain 100% compliance

Periodic Inspection/ Spot Checks/ Monthly mailto:richard.moore.12@us.af.mil

File details come from the government source that posted it. Updated .