Attachment 1 PWS Hoods and Ducts cleaning services Aviano and Ghedi Air Bases Italy.pdf
PDF 125 KB Posted
- Solicitation number
- FA568225Q8027
About this file
This Performance Work Statement (PWS) details a contract for hoods and ducts cleaning services at Aviano and Ghedi Air Bases in Italy. The primary objective is to ensure maximum cleanliness and functionality of commercial kitchen hood and duct exhaust systems, with a critical focus on preventing kitchen fires associated with grease residue. The contractor must provide all management, supervision, tools, supplies, equipment, vehicles, and qualified personnel to clean exhaust systems in accordance with multiple standards, including NFPA 96, Air Force Instruction 91-203, and Italian safety regulations.
Key requirements include developing a monthly work schedule, conducting thorough cleaning of entire extraction systems, performing preparation and post-service inspections, and obtaining acceptance inspections from the Fire Prevention Office. The contractor must comply with safety protocols, wear proper identification, maintain English language communication capabilities, and follow strict environmental protection guidelines. The contract emphasizes preventing facility closures, maintaining operational systems, and ensuring all cleaning is performed with minimal disruption to building operations. The performance will be evaluated against specific thresholds, such as no more than one validated discrepancy per quarter and no more than one failed inspection per year.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
HOODS & DUCTS CLEANING
SERVICES
AVIANO & GHEDI AIR BASES
30 APRIL 2025
PARA
TABLE OF CONTENTS
DESCRIPTION
PAGE
1. DESCRIPTION OF SERVICES
1.1 OBJECTIVES 3
1.1.1 GENERAL 3
1.1.2 STANDARDS 3
1.2 WORK SCHEDULE 3
1.2.1 SERVICE SUSPENSION 3
1.3 CLEANING SERVICE 4
1.3.1 AEREA PREPARATION 4
1.3.2 PREPARATION INSPECTION 4
1.3.3 POSTING 4
1.3.4 ACCEPTANCE INSPECTION 4
1.3.4.1 COORDINATION 4
1.3.5 SERVICE COMPLETION 5
2. SERVICE SUMMARY
CONTRACTOR QUALITY CONTROL PLAN (QCP)
GOVERNMENT QUALITY ASSURANCE
PERFORMANCE EVALUATION MEETING
PROPERTY AND SERVICES
2.1 5
2.2 5
2.3 5
3. 6
3.1 GOVERNMENT FURNISHED 6
3.1.1 DOCUMENTS 6
3.1.2 UTILITIES 6
3.2 CONTRACTOR FURNISHED 6
3.2.1 EQUIPMENT AND SUPPLIES 6
4. ADMINISTRATIVE REQUIREMENTS 6
4.1 SAFETY AND HEALTH PROGRAM 6
4.2 HOST NATION LAW COMPLIANCE 6
4.3 SAFETY BRIEFING 6
4.4 INTERFERRENTIAL RISK 6
4.5 PROMPTLY REPORTS INJURIES, ACCIDENT, DAMAGES 7
4.6 CONTRACTOR PERSONNEL 7
4.7 ENVIROMENTAL PROTECTION 7
4.7.1 SAFETY DATA SHEET (SDS) 7
4.7.2 ENVIROMENTAL SPILLS 7
4.7.3 HAZARDOUS WASTE 7
4.8 NORMAL WORKING HOURS 7
4.9 PERFORMANCE OF SERVICE DURING CRISIS 8
4.10 CONTRACTOR PERSONNEL 8
4.10.1 ORGANIZATION CHART 8
4.10.2 CERTIFICATIONS 8
4.10.3 CONTRACT MANAGER (CM) 8
4.10.4 ENGLISH LANGUAGE REQUIREMENTS 8
4.10.5 IDENTIFICATION OF CONTRACT EMPLOYEES 9
4.11 KEY CONTROL SYSTEM 9
4.11.1 LOST KEYS 9
4.11.2 RE_KEYING OR REPLACEMENT 9
4.12 RECORDS 9
4.13 CONTRACTOR COMMUNICATIONS 9
4.14 LIABILITIES AND RESPONSIBILITIES 9
5. APPENDICES 9
PERFORMANCE WORK STATEMENT
FOR
HOODS & DUCTS CLEANING SERVICES
1. DESCRIPTION OF SERVICES
1.1 OBJECTIVE. The objective of this service contract is to ensure the maximum cleanliness and functionality of the Commercial Kitchen Hoods and Ducts Exhaust Systems at Aviano and Ghedi Air Base. Proper execution of this service is to prevent kitchen fires associated with grease residue in the Hoods and Ducts Exhaust Systems. Facility closures or operation limitations due to unclean or inoperable systems must be prevented to the maximum extent possible and will directly reflect on the quality of services provided under this contract.
1.1.1 GENERAL. The Contractor must provide all management, supervision, tools, supplies, equipment, vehicles, qualified personnel, services, and any other items necessary to clean the Commercial Kitchen Hood and Duct Exhaust Systems at Aviano and Ghedi AB, in accordance with (IAW) the requirements specified in this Performance Work Statement (PWS). The buildings and exhaust systems requiring Contractor Services are indicated in Appendix A. Appendix B has locations sketches for buildings with multiple systems. The exhaust system includes equipment and ducts starting at the hood system in the kitchen, through the exhaust duct system, to and including the exterior exhaust fan system. Work must be accomplished in such a manner to prevent disruption to the building operations. When the Contractor completes its service on a system, that system must be clean and operational with no components missing and all inspection access panels are to be secured.
1.1.2 STANDARDS. All workmanship must meet the standards specified herein and be accomplished in accordance with applicable industry standards, equipment manufacturers guidelines, applicable regulations, and applicable laws. Standards include but are not limited to the United States National Fire Protection Association (NFPA) 96 (version 2017 or later), Air Force Instruction (AFI) 91-203, and Italian Safety Legislative Decree (D. Lgs) 81/2008, European Regulation 852/2004/CE and UNI EN 1093-4, Ministerial Decree 12/04/1996 (Italian fire prevention norm) and guidelines from HACCP System.
1.2 WORK SCHEDULE. The Contractor must coordinate with the Facility Manager to develop the monthly Work Schedule. Within 10 working days of contract award and prior to starting services, the Contractor must submit a Facility Manager coordinated Work Schedule to the MO (Mission Owner) for approval. See Appendix A. If the Contractor has coordination issues with a Facility Manager, then it will contact the MO for assistance. The schedule should contain information indicating, month/year, building number, building description, hood number, service date, service start time. The Contractor must submit all schedules by the 15th day of every month. Any change to the work schedule will be approved by the MO. Since some buildings have multiple systems, the Contractor may service the individual systems on different days. If the Contractor requires additional hours, it must coordinate and obtain approval as previously indicated at no additional cost to the Government. A sample of monthly work schedule format and list of Facility Managers will be provided after contract award.
1.2.1 SERVICE SUSPENSION. The Government will notify the Contractor at least 48 hours prior to the scheduled service date if a system service needs to be suspended. The Contractor will coordinate a new date with the Facility Manager, Fire Prevention Office (FPO), and MO if service is still required during the current period. Rescheduling or suspension of service will be at no additional cost to the Government.
1.3 CLEANING SERVICE. The service must be executed IAW NFPA 96 that includes but is not limited to:
A. Cleaning entire system of extraction and components (blades, covers, fans, filters, etc.)
B. Cleaning of all hoods including all grease filters and drainages.
C. Removing, cleaning, and reinstalling (airtight) all inspection access panels and covers.
NOTE**: During the cleaning services, Contractor shall not interfere with the Automatic Fire Suppression System located on the Hoods.
1.3.1 AREA PREPARATION. Before initiating cleaning service, the Contractor must ensure that the system is deactivated, and any electrical system is disconnected. Open flames must be extinguished, and switches/breakers serving the appliance and cooking area outlets must be turned off, tagged out, and locked out. Contractor must protect all Government property from contamination. Contractor should not move or relocate fire extinguishing system components from their original position or orientation. Contractor shall inform MO of any condition deemed unsafe; MO will notify the Facility Manager to take required action to eliminate all identified safety issues prior to contractor cleaning the system. No service will be provided until area is determined to be safe for the cleaning operation to begin.
1.3.2 PREPARATION INSPECTION. The Contractor will inspect the work area and document the system condition prior to initiating service. This documentation will be included electronically with the Monthly Service Record submission. Documentation must consist of a numbered Discrepancy Summary along with date and time stamped digital pictures. Conditions to document are:
A. damage to Government Property;
B. malfunctioning system equipment;
C. missing protective caps on fire extinguishing nozzles;
D. damaged fusible links, refer to NFPA 96;
E. prior to service cleanliness pictures of dirt and grease accumulation;
Pictures are required for the following, but are not limited to these areas:
A. under and inside the hoods;
B. above the vents;
C. exterior exhaust system fan (once turned off);
D. locations of heavy accumulation which may mandate increasing the service frequency.
1.3.3 POSTING. Upon completion of the service, the Contractor must post Labeling and Certificates in IAW NFPA 96.
1.3.4 ACCEPTANCE INSPECTION. When the scheduled cleaning is complete, there will be an Acceptance Inspection executed by Fire Prevention Office (FPO) to verify compliance with NFPA 96 and PWS cleaning requirements. Appendix C is a copy of the Inspection Checklist. The Contractor is required to read and sign the completed checklist(s). Original report will be kept at the FPO and a copy will be stored on the Drive. Re-performance associated with a failed Acceptance Inspection must be executed within same day or as soon as facility operations allow. If facility operations prevent immediate re-performance, then the Contract Manager (CM) will coordinate with the Facility Manager and notify the MO and FPO when the re-performance can take place.
1.3.4.1 COORDINATION. The Contractor must notify the Fire Dept./FPO at least 60 minutes prior to service completion to coordinate the inspection time. If the representative does not arrive, the Contractor must contact the MO for instructions. If service is being executed after normal working hours, then the Contractor will complete the Inspection Checklist, restore system to full operation and notify the MO accordingly during the next workday. Contact information for DRG will be provided within 5 working days of contract award.
1.3.5 SERVICE COMPLETION. The Contractor must clean walls, floors, and equipment adjacent to and behind ducts to restore the site to the original condition as it was prior to initiating service. All Government property moved by the Contractor during the cleaning service must be placed in its original location.
2. SERVICE SUMMARY. The contract service requirements are summarized into performance objectives that relate to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each objective. These thresholds are critical to mission success. The Contractor’s performance will be assessed against these objectives and thresholds.
TABLE: SERVICE SUMMARIZED REQUIREMENTS
Item Performance Objective
PWS
Par. Performance Threshold Remedy
1 Work Schedule Submittal 1.2 No more than 1 late submittal per year.
Contractor submits schedule within 12 hours of notification
2 Cleaning Service Executed IAW PWS Requirements
1.3 No more than 1 validated
discrepancies per Quarter.
Contractor re-performs service within 4 hours at no additional cost to Government, or provide notification of when discrepancies will be resolved
3 Post Required Labeling and Cleaning Certificate
1.3.3 No more than 1 label and
certificates missing or incorrect per Quarter.
Contractor posts required and correct labeling and certificates within 12 hours of notification
4 Acceptance Inspection 1.3.4 No more than 1 failed inspection per year.
Contractor re-performs work within the same day or as soon as facility operations will allow
5 Quarterly Service Record Submittal
2.2 No more than 2 late or
incomplete submittals per year.
Contractor submits or resubmits complete submittal within 12 hrs of notification
2.1 CONTRACTOR QUALITY CONTROL PLAN (QCP). The Contractor must establish and maintain a QCP to ensure all services are performed in accordance with this PWS, commercial standard practices, applicable laws, and regulations. After contract award, proposed changes to the plan must be submitted to the Contracting Officer (CO) and MO for approval no later 10 working days prior to the proposed implementation date. The QCP must include, but is not limited to:
A. addressing how Contractor will meet Service Summary Table Performance Objectives.
B. contractor corrective action procedures to avoid and remedy unsatisfactory performance.
C. description and sample copies of required contract records.
QCP must be sent electronically and definitively to CO and MO within 20 calendar days after award.
2.2 GOVERNMENT QUALITY ASSURANCE. The MO will evaluate Contractor’s performance through random on-site inspections of the Contractor’s services and by receipt of customer complaints. If the MO determines a complaint is invalid, the MO will document the findings and notify the Customer. If the MO determines the complaint is valid, it will inform the CM, and the CM must initiate corrective actions and return the written Customer complaint with the annotated corrective actions to the MO. The Contactor has 4 work hours to respond with service re-performance or notification of when the discrepancy will be resolved. If Contractor disagrees with the complaint, the CO will be informed and will make the final determination of action to be taken.
2.3 PERFORMANCE EVALUATION MEETING. The Contractor may be required to meet with Government Personnel if deemed necessary. The Contractor may request a meeting with the CO when the Contractor believes a meeting is necessary. If the CO or the MO deems necessary, written minutes of any meetings shall be recorded, submitted to CM, MO, and included in the contract file. If the Contractor does not concur with any portion of the minutes, such non-concurrence must be provided in writing to the CO within 5 working days of receipt of the minutes.
3 PROPERTY AND SERVICES
3.1 GOVERNMENT FURNISHED
3.1.1 DOCUMENTS. Technical information and drawings of the systems are not available. System is old and documentation gets lost.
3.1.2 UTILITIES. The Government will furnish the following utility services at existing outlets for use in those facilities provided by the Government and as may be required for the work to be performed under this contract: electricity and fresh water. The Government will not make alterations to existing utility systems to specifically supply the Contractor with their utility needs. If utilities are not available, the Contractor must provide the required utility to perform service.
3.2 CONTRACTOR FURNISHED
3.2.1 EQUIPMENT AND SUPPLIES. Equipment and supplies must be EN/UNI approved and in compliance with all Italian and Air Force safety laws/standards. All equipment must be of commercial quality, size, and type suitable for accomplishing the various types of work specified and must be able to operate from existing sources of Government furnished electrical power. It is the responsibility of the Contractor to ensure the operation of electrical equipment, or combinations thereof, do not exceed the capacity of existing building power circuits. The CO, MO, and FPO may inspect the Contractor’s equipment and tools at any time and direct the removal of unsafe equipment and tools. These items must be removed from the job site by the Contractor and replaced with compliant equipment at no additional cost to the Government. If using a steam cleaner, operator must protect all fusible links on automatic fire extinguishing system from possible activation due to cleaning fluid (steam or hot water) temperature. Due to the nature and the work hours, adequate lighting may not be available at the site.
Contractor is responsible for providing any additional lighting necessary to perform cleaning.
4 ADMINISTRATIVE REQUIREMENTS
4.1 SAFETY AND HEALTH PROGRAM. Contractor must develop and maintain a Safety and Occupational Health plan which meets all applicable Aviano Air Base and Italian Standards to include, but not limited, to requirements outlined in the Air Force Occupational Safety, Fire, and Health Standards, DAFMAN 91-203, and Italian Lgs. Decree 81/2008.
4.2 HOST NATION LAW COMPLIANCE. The Contractor shall perform work in a safe manner as required by Host Nation laws and norms concerning safety but not limited to, Italian Law Lgs. Decree 81/08 and any subsequent amendment.
Contractor will ensure that their employees are properly equipped, trained and qualified to perform the job in this Contract.
Contractor will ensure that their employees are wearing Personal Protective Equipment (PPE) and clothing during their job.
The Contractor shall ensure safety trainings to their employees, including emergency maneuver trainings to their personnel (such as “Primo Soccorso” - First Aid - and “Corso Antincendio” - Fire-fighting training – as per Italian Lgs. Decree 81/2008 requirement).
Contractor will provide COR/MO all training certificates related to above requirements. At Certificate expiration date, will provide refresher documents. This applies to all Contractor’s employees involved.
4.3 SAFETY BRIEFING. Prior to starting activities, the Contractor shall take a safety briefing provided by Wing Safety Office (SEG) during a pre-performance conference
4.4 INTERFERRENTIAL RISK. Prior to starting activities, the Contractor shall coordinate with 31FW/CCPP Prevention and Protection Office, to fulfill art. 26 of Lgs. Decree 81/08 requirements.
The Contractor must immediately notify the MO and CO of any adverse safety and occupational health conditions pertaining to its employees, Government personnel, and Government property while performing contractual services. A written report detailing the occurrence must be given to MO within 2 working days after incident occurrence. If injuries are life threatening, the Contractor shall immediately contact emergency services. Emergency Service contact and phone numbers info will be provided after contract award.
4.5 PROMPTLY REPORT INJURIES, ACCIDENTS, DAMAGES If Contractor’s employees, or Government Customers, are injured or Government assets are damaged, the Contractor shall promptly inform the CO who, in turn, will inform the 31 FW/SEG (commercial phone number 0434-30- 7233, Bldg. 1413, Area F), 31 FW/CCPP (0434-30-5709, Bldg. 1472, Area F) and 31 CONS/PKB.
Provide a verbal report to the CO as soon as possible of each occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact. Provide a completed copy of required Accident Investigation Reports to the CO within five calendar days of each occurrence. If injuries are life threatening, the Contractor shall immediately contact either the corresponding local emergency responders or the on-base emergency responders via 0434-30-1911
4.6 ALCOHOL AND DRUG PROHIBITION. Consumption of and/or being under the influence of alcohol (to include smelling of alcohol) or drugs while on duty is strictly prohibited. At the direction of the CO, Contractor’s personnel found to be or suspected to be under the influence of alcohol or drugs during duty will be immediately removed from duty. Upon notification, the Contractor shall provide a qualified replacement immediately and at no additional cost to the Government.
4.7 ENVIRONMENTAL PROTECTION. The Contractor must ensure the purchase, use, handling, storage, and disposal of all toxic, hazardous cleaning products, materials, special materials, and wastes are in accordance with all applicable environmental protection standards. Contractor is required to pay any fines for which it is determined to be responsible, and complete the appropriate paperwork to be submitted to the proper authorities with copies provided to the 31 Civil Engineer Squadron (CES) Environmental Element, MO and CO. No chemical or cleaning product not authorized or hazardous products shall be brought onto Government property without the approval of the 31 CES Environmental Element.
4.7.1 SAFETY DATA SHEET (SDS). Prior to bringing any hazardous material or cleaning product onto Aviano and Ghedi Air Bases, the Contractor must have a 31 CES Environmental Element approved SDS for the hazardous material. The Contractor must submit all SDS’s to the MO at least 10 working days prior to the intended use of the hazardous material. The MO will coordinate with the 31 CES Environmental Element to obtain approval. All approved SDS’s must be kept updated with the latest manufacture information and be consolidated in a binder. At a minimum, the Contractor must keep a binder at its office location, and on-site where service work is being performed that day.
During the life of the Contract, any time that Contractor is in need to change the cleaning product, he must provide to MO the new SDS of the product or material intend to use.
4.7.2 ENVIRONMENTAL SPILLS. If the Contractor spills or releases any substance listed in 40 CFR 302 into the environment, it must immediately report the incident to the Government Representative.
4.7.3 HAZARDOUS WASTE. At no time will the Contractor release or dispose of any Hazardous Waste into the environment or sanitary sewer system. The Contractor is responsible for all coordination and approvals from all appropriate agencies prior to any disposal of agents. All approvals must be in writing and kept in the contract record. Contractor is responsible for the complete removal and disposal of Hazardous Waste through legal and approved methods. The Contractor must also provide the 31 CES Environmental Element and MO with copies of all documentation for shipment, handling, storage and disposal of Hazardous Waste from the Aviano and Ghedi AB.
4.8 NORMAL WORKING HOURS. The Normal Working Hours of the Aviano AB are Monday through Friday, from 8:00 A.M. to 5:00 P.M., except American and Italian holidays. To limit the impact to building operations the Contractor will be required to work outside these hours. Unless coordinated and approved by the MO and FPO, the Contractor will not provide services on the following American and Italian holidays:
U.S. FEDERAL HOLIDAYS
New Year’s Day 1st January Martin Luther King’s Birthday 3rd Monday in January President’s Day 3rd Monday in February Memorial Day Last Monday in May Juneteenth 19th June Independence Day 04th July Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day 11th November Thanksgiving Day 4th Thursday in November Christmas Day 25th December
ITALIAN HOLIDAYS
New Year’s Day 1st January Epiphany Easter 06th January Easter Monday As stated on current year’s calendar Aviano Patrons Day As stated on current year’s calendar Liberation Day As stated on current year’s calendar Italian Labor Day 1st May Republic Day 2nd June Assumption Day 15th August All Saints 1st November National Unity Day As stated on current year’s calendar Immaculate Conception 8th December Christmas Day 25th December Saint Stephen Day 26th December
NOTE: American holidays falling on a Saturday are normally observed on the previous Friday. American holidays falling on a Sunday are observed on the following Monday. Government will provide FY Holiday calendar at the beginning of each option year upon request.
4.9 PERFORMANCE OF SERVICES DURING CRISIS. This is not an essential service.
4.10 CONTRACTOR PERSONNEL. All work under this contract must be performed in a skillful and workman like manner. Contractor employees must conduct themselves in a proper, efficient, courteous, and businesslike manner. The Government reserves the right to remove the job site of any employee who endangers persons or property, whose continued employment is inconsistent with the interests of military security, or whose presence deters the accomplishment of work.
4.10.1 ORGANIZATION CHART. After contract award, the Contractor must notify the MO in writing at least 5 working days prior to any changes.
4.10.2 CERTIFICATIONS. Contractor must have all required certifications as per Italian Chamber of Commerce or equivalent. Certifications must be current at the time of submission and must be valid for the entire duration of the contract.
4.10.3 CONTRACT MANAGER (CM). The Contractor must provide the Government the name of the CM authorized to act for the Contractor. The CM must be available during Normal Working Hours, and within 4 hours of notification, be able to meet at Aviano AB with the CO or MO to discuss problematic issues when arise. CM or alternate delegate person contact information must be provided to the CO and the MO within 10 working days of contract award. CM must be available from Monday to Friday from 07:30 to 16:30 for any issues to discuss with Government Representative.
4.10.4 ENGLISH LANGUAGE REQUIREMENTS. The Contractor’s CM, call reception personnel, as well as the lead service technician must have a good command of the English language in order to properly and independently coordinate services with United States Government personnel.
4.10.5 IDENTIFICATION OF CONTRACTOR EMPLOYEES. While performing services Contractor personnel must wear clothing and badges that clearly identify their name and the name of the Contractor.
4.11 KEY CONTROL SYSTEM. The Contractor must establish and implement a key control system to ensure keys issued to the Contractor are not lost, misplaced, or used by unauthorized personnel.
The Contractor must establish a log to show the following: facility, name signing out/in the key, date and time out/in, and any other pertinent information necessary to control keys. The Contractor must not duplicate any keys issued by the Government.
4.11.1 LOST KEYS. The Contractor must immediately report to the MO any occurrences of lost, unauthorized use, or unauthorized duplication of keys.
4.11.2 RE-KEYING OR REPLACEMENT. In the event keys other than master keys are lost or duplicated, the Contractor is required, upon written direction of the MO, to re-key or replace the affected lock or locks without cost to the Government. In the event a master key is lost or duplicated, all locks and keys for that system will be replaced by the Government and the total cost of the re-keying effort will be deducted from any payment due to the Contractor.
4.12 RECORDS. Records include all documentation generated by the Contractor in the performance of its contractual services. All contract records must be in English. All the records will be included into the inspection reports after each cleaning service is provided.
4.13 CONTRACTOR COMMUNICATIONS. To facilitate communication between the Government and the Contractor, the Contractor must designate and maintain an email account(s) and contact telephone number(s) for the life of the contract.
4.14 LIABILITIES AND RESPONSIBILITIES. The Contractor is responsible for all damages to persons or property that occurs during the performance of this contract because of the Contractor’s fault or negligence. The Contractor is also responsible for all work performed until completion and acceptance of the entire work. The Contractor must safeguard all building occupants while performing the service under this contract.
5 APPENDICES
A. Estimate Yearly Workload data 2025-2030 – 30 April 2025 B. Multiple Systems Location Sketches – 30 April 2025 C. Template/Example of Inspection Checklist – 30 April 2025