Attachment 1 PWS for KMRD Vault Pumping.pdf

PDF 952 KB Posted

Attached to
KMRD Vault Pumping - Ketchikan, AK Federal contract opportunity
Solicitation number
1240BF24Q0001
Issued by
Department of Agriculture Forest Service

About this file

This performance work statement outlines vault pumping services required by the Ketchikan-Misty Ranger District located in Ketchikan Borough, Alaska. The contractor shall provide pumping services for twelve 750-gallon vaults located in Ward Lake Recreation Area and two 1000-gallon vaults located at Margaret Bay. Services include pumping and disposal of waste materials from the vaults on an as-needed basis. The contract type is firm-fixed-price, and the period of performance is one base year with four one-year options running from the date of award through November 2028. The Department of Agriculture Forest Service will award this contract under solicitation number 1240BF24Q0001. Key deliverables, performance standards, and quality assurance measures are defined to ensure contractor performance meets requirements.

View the file

Other files for this federal contract opportunity

Other files attached to KMRD Vault Pumping - Ketchikan, AK, newest first.
File Type Posted
Attachment 2 SCA WD 2015-5685 R20 2023.07.27.pdf PDF
Attachment 3 Quote Sheet KMRD Vault Pump.xlsx XLSX spreadsheet
1240BF24Q0001 KMRD Vault Pumping.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KMRD Vault Pumping Services Performance Work Statement (PWS) Page 1 of 9

General Information

1.0 General

This is a non-personal services contract to provide vault pumping services to the Ketchikan-Misty Ranger District (KMRD) located on the Tongass National Forest (TNF). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.

2.0 Background and Purpose

The Forest Service is responsible for maintaining healthy, diverse, and productive National Forests. Part of these responsibilities include maintaining twelve 750-gallon toilet vaults located in the Ward Lake Recreation Area which is on the Ketchikan Borough road system AND two 1000-gallon toilet vaults located at Margaret Bay which IS NOT connected to the Ketchikan Borough road system and IS ONLY ACCESSBILE VIA BOAT OR PLANE.

3.0 Description of Services

The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items and non-personal services necessary to provide vault pumping services to campgrounds and public use sites at Ward Lake Recreation Area and at Margaret Bay. The contractor shall provide services in accordance with (IAW) this Performance Work Statement (PWS), and all applicable federal, state and local laws and regulations.

4.0 Place Performance The work shall be performed at Ketchikan Borough, Alaska.

5.0 Period of Performance The period of performance shall be from as indicated below.

Period POP Start Date POP End Date Base Period Date Of Award November 30 2024 Option Period 1 (12-Month Option Period) December 1 2024 November 30 2025 Option Period 2 (12-Month Option Period) December 1 2025 November 30 2026 Option Period 3 (12-Month Option Period) December 1 2026 November 30 2027 Option Period 4 (12-Month Option Period) December 1 2027 November 30 2028

6.0 Contract Type

The Government will award a Firm-Fixed Priced (FFP), Requirements, Service Contract with up to a 5-Year Ordering Period. Performance shall be made only as authorized by Task Orders issued IAW the Ordering Clause. Subject to any limitations in the Order Limitations Clause or elsewhere in this contract, the Contractor shall furnish to the Government all services specified in the Schedule of Items and called for by orders issued IAW the Ordering Clause.

Note: Task Orders will be issued at the rates specified in the Schedule of Items. The quantities of services specified in the Schedule of Items are estimates only.

7.0 Government Regular Working Hours

The Government's regular working hours are Monday through Friday from 0700 to 1700, except federal holidays or when the government installation is closed due to local or national emergencies, administrative closings, or similar government directed closings.

8.0 Federal Observed Holidays

When a federal holiday occurs on a Saturday, federal employees are normally granted the previous Friday as the holiday observance. When a federal holiday occurs on a Sunday, federal employees are normally granted the following Monday as the holiday observance. Below is the list of recognized federal holidays:

Federal Holidays New Year’s Day (January) Labor Day (September) Martin Luther King Jr’s Birthday (January) Columbus Day (October) President’s Day (February) Veteran’s Day (November) Memorial Day (May) Thanksgiving Day (November) Juneteenth Day (June) Christmas Day (December) Independence Day (July)

Performance Work Statement (PWS) Page 2 of 9

9.0 Contractor Key Personnel

Contract Manager: The Contractor shall provide a Contract Manager and designated alternate, as applicable, who has full authority to act for the Contractor on all contract matters relating to this contract. The Contract Manager or alternate shall be available during the Government's regular working hours.

Quality Control Representative: The Contractor shall provide a Quality Control Representative who shall be responsible for the Contractor’s Quality Control Plan (QCP) to ensure services are performed IAW the PWS. The Quality Control Representative shall implement and maintain full compliance of the QCP throughout the contract period.

10.0 Government Key Personnel

Contracting Officer (CO): The CO is the only person with the authority to: enter into, administer, and or terminate contracts; make related determinations and findings on behalf of the government; and legally bind the government. The CO shall ensure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO shall determine and document the final assessment of the contractor's performance in the government’s past performance tracking system.

Contracting Officer’s Representative (COR): A COR may be assigned to this contract to monitor all technical aspects and assist in contract administration. The COR may be authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communication with the Contractor concerning technical aspects of the contract;

issue written interpretations of technical requirements (without increasing or decreasing contract scope), including Government drawings designs, and specifications; monitor Contractor's performance and notify both the CO and Contractor of deficiencies; and provide site entry of Contractor personnel. The COR is not authorized to change any of the terms and conditions of the contract or any resulting task order.

11.0 Post-Award Conference and Periodic Progress Meetings

The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office IAW Federal Acquisition Regulation (FAR) Subpart 42.5. The CO and/or COR shall meet periodically with the Contractor to review the contractor's performance. At these meetings the CO will apprise the Contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.

12.0 Changes

The quantities specified in the Schedule of Items are estimates only. The government reserves the right to add, delete, or change the items and quantities to be serviced under this contract, as required. Price adjustments for these changes shall be based on the rates specified in the Schedule of Items for identical or similar items. Changes will only be authorized by a warranted CO.

13.0 Inspection and Acceptance

Any inspection and acceptance will be at the location specified in the contract. The designated COR will act as the representative of the CO for purposes of inspection and acceptance of services to ensure compliance with the terms, conditions, and specifications of the subject contract. The COR has no authority to make any changes to the terms and conditions of the contract.

14.0 Invoicing

All contractor invoices shall be submitted via the Invoice Processing Platform (IPP) using contract line item numbers (CLINs). The contractor shall be required to establish account(s), access method(s), log-in(s), and necessary training in order to submit invoices through IPP. Invoices not submitted via IPP shall not be accepted or paid.

Note: The contractor shall only invoice for work performed and as authorized by the contract or any task orders issued IAW the Ordering Clause, as applicable.

Performance Work Statement (PWS) Page 3 of 9

Security and Safety Requirements

15.0 Security

The contractor shall be responsible for safeguarding all government property provided to the contractor for contractor use under this contract. At the close of each work period, all government property shall be secured.

16.0 Access to Government Facilities

The contractor shall coordinate all contractor personnel access to government facilities with the COR at least 5 business days prior to any scheduled service or visit. Only contractor personnel performing work under this contract shall have access to government facilities. If no coordination is made, access will be denied. Contractor personnel entering government facilities shall abide by all security regulations.

17.0 Key Control

No keys or key cards shall be issued to the contractor under this contract.

18.0 Identification of Contractor Employees

All contract personnel working in situations where their contractor status is not obvious to third parties are required to identify themselves by wearing clearly written and visible nametags at all times, as such to avoid creating an impression in the minds of members of the public that they are Government officials.

19.0 Conduct of Contractor Personnel

The CO may require the contractor to remove from the work site any employee working under this contract for reasons of misconduct, security, or found to be or suspected to be under the influence of alcohol, drugs, or other incapacitating agent. Contractor employee shall be subject to dismissal from the premises upon determination by the CO that such action is in the best interests of the government. Such removal from the work site or dismissal from the premises shall not relieve the contractor of the requirement to provide sufficient personnel to perform the services as required by this PWS.

20.0 Safety

Contractor activities shall be conducted in a safe manner that minimizes accidents as well as any impacts on Government operations and members of the public. Contractor shall comply with applicable federal, state, and local codes and standards, including safety and occupational health requirements, as well as any additional specific requirement contained in this PWS.

Technical Requirements

21.0 Specific Tasks

The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items and non-personal services necessary to provide pumping services to twelve 750-gallon vaults located in the campgrounds and public use sites at Ward Lake Recreation Area on KMRD and two 1000-gallon toilet vaults located at Margaret Bay. The contractor shall provide services in accordance with (IAW) this Performance Work Statement (PWS), and all applicable federal, state and local laws and regulations. The COR will not place an order in freezing conditions or when road access conditions are unfavorable.

Task 1 – Toilet Vault Pumping Services (Map Section 36.0): When ordered by the COR the Contractor shall pump and dispose of waste material including solids for each 750-gallon vault(s) ordered within 7 calendar days. The COR will only call for each vault when needed.

Task 2 – Toilet Vault Pumping Services at Margaret Bay (Map Section 37.0): Margaret Bay has two vaults that are each 1000-gallons. When ordered by the COR the Contractor shall mobilize, pump, and dispose of waste material including any solids associated with the two 1000-gallon vaults at Margaret Bay within 30 calendar days. Due to mobilization each order will include both vaults.

Performance Work Statement (PWS) Page 4 of 9

22.0 Over and Above Work

Work not covered in Paragraph 21.0 of this PWS may be considered Over and Above Work. The contractor shall submit the following information for all over and above work: type of work required; detailed work description; specific location, estimated labor hours; materials required to complete the work, and proposed cost. Data shall be sufficient to satisfy contract requirements and obtain the authorization of the CO to perform the proposed work.

The contractor shall not proceed with over and above work until the Government promptly reviews the information submitted. The government will verify that the proposed work is required and not covered under the basic contract line item(s) and that the proposed corrective action is appropriate. The government will authorize over and above work as necessary and through the issuance of modifications to the contract, issuance of task orders, or use of government Purchase Card (GPC).

The government and contractor will negotiate a settlement for the over and above work. Contract modifications will be executed to definitize over and above work. Failure to agree on the price of over and above work shall be a dispute within the meaning of the Disputes clause of this contract.

Additional Requirements

23.0 Work Schedule

NA

24.0 Quality Control Plan (QCP)

The Contractor shall develop and maintain an effective QCP to ensure services are performed IAW this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.

The Contractor’s QCP is the means by which the Contractor assures that their work complies with the requirements of the contract. The Contractor’s QCP shall be provided to the CO and COR NLT 10 business days after contract award. After acceptance of the QCP, the Contractor shall receive the CO’s acceptance in writing of any proposed change to the QCP.

25.0 Special Qualifications

The contractor shall, at no additional cost to the government, obtain all licenses and permits required for performance of work and for complying with all applicable local, state, and federal laws and regulations.

26.0 Service Interruptions

If any services must be interrupted (even temporarily) due to maintenance of contract work, the Contractor shall notify the CO and COR at least 3 business days in advance. If the service is due to an emergency breakdown, the Contractor shall notify the CO and COR as soon as practicable.

27.0 Travel

The Contractor shall be responsible for all travel to and from the work site locations.

Deliverables Schedule

28.0 Key Deliverables

The Contractor shall submit an electronic copy of all deliverables to the CO and COR in PDF format and phrased in layperson language. Below is a list of all deliverables outlining each objective and due date.

Item # Deliverable Objective Due 2 Over and Above

Work Request Provide a work request for all Over and Above Work. The request shall include the type of work required, detailed work description, specific location, estimated labor hours, materials required to complete the work, and proposed cost.

NLT 10 business days from the date the work was discovered.

3 List of Contractor Personnel

Provide a list of all contractor personnel assigned to this contract and their point of contacts.

NLT 10 business days after contract award. An updated copy shall be provided to the CO and COR as changes occur.

Performance Work Statement (PWS) Page 5 of 9

4 Invoices Invoices shall be submitted via IPP. NLT 10 business days after work performance. For monthly invoicing, invoices shall be submitted NLT 10 days after the end of the month.

Performance Requirements Measures

29.0 Contractor’s Performance

The government expects the contractor to work at an acceptable performance level throughout the life of the contract, and the contractor’s performance shall be given significant consideration when evaluating recommendations for future government contracts and/or awards.

30.0 Acceptable Performance

Acceptable performance is achieved if 100% of the requirement is successfully satisfied. The Contractor’s acceptable performance will be rated in COR reports and in the Contractor Performance Assessment Reporting System (CPARS) as Satisfactory, Very Good, or Exceptional.

31.0 Unacceptable Performance

Unacceptable performance is achieved if less than 100% of the requirement is satisfied (e.g., work specified by contract is incomplete or work is not IAW the PWS, task order, and manufacturer’s specifications). If the performance is deemed unacceptable for any objective (required task), the COR will determine the possible cause of this unacceptable performance. Unacceptable performance caused by actions of the Contractor shall be reported to the Contractor’s on-site representative and request its signature on documentation acknowledging notification. Unacceptable performance caused by actions of the Government shall not be held against the Contractor. If the Contractor disputes the results of surveillance, the COR must refer the Contractor to the CO for resolution. The Contractor’s unacceptable performance will be rated in COR reports and in CPARS as Marginal or Unsatisfactory.

32.0 Performance Requirements Summary

Item # Performance Objective

Performance Standard

Performance Threshold

Surveillance Method Remedy

1 Toilet Vault Pumping Services

Work shall be performed IAW this PWS (Paragraph 21.0), the terms of each task order, and all applicable federal, state, and local laws and regulations.

No variances allowed. 100% services performed as required by the contract.

Periodic and/or random inspections by the COR or Government Technical Representative (GTM).

The government has the right to change or modify inspection methods at its discretion.

Rework at no cost to Government for defective services.

Full invoice payment upon successful completion and acceptance.

2 Over and Above Work

Work shall be performed IAW this PWS (Paragraph 22.0), the terms of each task order, and all applicable federal, state, and local laws and regulations.

No variances allowed. 100% services performed as required by the contract.

Periodic and/or random inspections by the COR or Government Technical Representative (GTM).

The government has the right to change or modify inspection methods at its discretion.

Rework at no cost to Government for defective services.

Full invoice payment upon successful completion and acceptance.

Government-Furnished Property and Utilities

33.0 Government-Furnished Property

The Government will not provide Government-Furnished Property for the performance of this contract.

34.0 Government-Furnished Utilities

The Government will not provide Government-Furnished Utilities for the performance of this contract.

Performance Work Statement (PWS) Page 6 of 9

Definitions

35.0 Definitions

Acceptance: The act of an authorized representative of the Government by which the Government, for itself or as agent of another, assumes ownership of existing identified supplies tendered or approves specific services rendered as partial or complete performance of the contract.

Business Day: Refers to any day in which government normal business operations are conducted. For this contract, a business day will be IAW PWS Paragraph 6.0, Government Regular Working Hours.

Calendar Day: Refers to the period of elapse time, using Coordinated Universal Time or local time that begins at midnight and ends 24 hours later at the next midnight.

Contracting Officer (CO): A person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer. "Administrative Contracting Officer (ACO)" refers to a Contracting Officer who is administering contracts. "Termination Contracting Officer (TCO)" refers to a Contracting Officer who is settling terminated contracts. A single Contracting Officer may be responsible for duties in any or all of these areas.

Contracting Officer’s Representative (COR): An individual, including a Contracting Officer’s Technical Representative (COTR), designated, and authorized in writing by the Contracting Officer to perform specific technical or administrative functions.

Contractor: A supplier or service provider that enters into a contract with the Government to provide specific supplies or services to the Government. The term in this contract refers to the prime.

Day: Unless otherwise specified, it means a calendar day.

Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.

Deliverable: Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

Equipment: A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.

Facility: An establishment, structure, or assembly of equipment designated for a specific function; something designed, built, installed, etc., to serve a specific function affording a convenience or service.

Government-Furnished Property (GFP): Property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.

Government Property: All property owned or leased by the Government. Government property includes both government-furnished property and contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.

Inspection: Examining and testing supplies or services (including, when appropriate, raw materials, components, and intermediates assemblies) to determine whether they conform to contract requirements.

Invoice: A contractor’s bill or written request for payment under the contract for supplies delivered or services performed.

Performance Work Statement (PWS) Page 7 of 9

Line Item: the basic structural element in a procurement instrument that describes and organizes the required product or service for pricing, delivery, inspection, acceptance, invoicing, and payment. The use of the term "line item" includes "subline item," as applicable.

Line Item Number: Either a numeric or alphanumeric format to identify a line item.

Non-Personal Services Contract: A contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government IAW FAR 37.012, under general contracting authority, and do not require specific statutory authorization.

Option: Unilateral right in a contract by which, for a specified time, the Government may elect to purchase additional supplies or services called for by the contract, or may elect to extend the term of the contract.

Over and Above Work: Work discovered during the course of performing overhaul, maintenance and repair efforts that is within the general scope of the contract; not covered by the line item(s) for the basic work under the contract; and necessary in order to satisfactorily complete the contract.

Performance Objectives: Describe the work that is to take place.

Performance Requirements Summary (PRS): Identifies the key performance indicators of the contract that will be evaluated by the Government to ensure the Contractor meets standards.

Performance Standard: Describe the desired results that are to be achieved. A measure of comparison; an acceptability criterion; a benchmark or yardstick against which a service will be measured.

Quality Assurance (QA): Refers to the various functions, including inspection, performed by the Government to determine whether a contractor has fulfilled the contract obligations pertaining to quality and quantity.

Quality Assurance Surveillance Plan (QASP): An organized written document used by the Government for quality assurance surveillance. A plan describing how the government will survey, observe, test, sample, evaluate and document the contractor’s performance in meeting critical performance standards identified in the contract.

Quality Control (QC): Refers to the various functions performed by the contractor to control and improve the quality of goods and services provided.

Quality Control Plan (QCP): An organized written document used by the Contractor for quality control. A contractor’s internal quality assurance procedures for measuring, tracking, reporting, and analyzing contract performance. A contractor’s QCP is separate from the government’s QASP.

Random Sampling: A method of looking at a few individual items in a lot to determine the quality of that lot against a standard.

Service Contract: A contract that directly engages the time and effort of a contractor whose primary purpose is to perform an identifiable task rather than to furnish an end item of supply.

Serviceable Condition: Refers to items that are usable; ready for use; in proper operating condition; durable; clean and in good condition; usable for its intended purpose.

Sub-Contractor: One that enters into a contract with a prime Contractor. The Government does not have privy of contract with the sub-contractor.

Task Order: An order for services placed against an established contract or with Government sources.

Work Request: Document prepared by the Contractor which describes over and above work being proposed.

Performance Work Statement (PWS) Page 8 of 9

Appendices

36.0 Ward Lake Recreation Area Map

Performance Work Statement (PWS) Page 9 of 9

37.0 Margaret Bay Area Map

Margaret Bay Vault Toilet Locations

General Information
1.0 General
2.0 Background and Purpose
3.0 Description of Services
4.0 Place Performance The work shall be performed at Ketchikan Borough, Alaska.
5.0 Period of Performance The period of performance shall be from as indicated below.
6.0 Contract Type
7.0 Government Regular Working Hours
8.0 Federal Observed Holidays
9.0 Contractor Key Personnel
10.0 Government Key Personnel
11.0 Post-Award Conference and Periodic Progress Meetings
12.0 Changes
13.0 Inspection and Acceptance
14.0 Invoicing
Security and Safety Requirements
Technical Requirements
21.0 Specific Tasks
Additional Requirements
25.0 Special Qualifications
26.0 Service Interruptions
Deliverables Schedule
Performance Requirements Measures
Government-Furnished Property and Utilities
Definitions
35.0 Definitions

Appendices

File details come from the government source that posted it. Updated .