Attachment 1 - PWS.pdf
PDF 294 KB Posted
- Attached to
- Radiography CRxFlexII Maintenance Services
- Solicitation number
- W9124R25QA012
About this file
This is a Performance Work Statement (PWS) for CRxFlex X-ray Scanner Maintenance services at the U.S. Army Yuma Proving Ground (YPG). The contract requires maintenance of a CRxFlex II Computed Radiography scanner used for radiographic imaging of test items at YPG's Radiography Facility, Building 3493 Kofa Firing Range. The equipment manufacturer is GE Sensing & Inspection (now Waygate Technologies), and only certified technicians who have completed Waygate's course can maintain this proprietary equipment.
The contractor must provide two annual preventive maintenance inspections (PMI), remote technical support via telephone 8 hours daily Monday-Friday (0700-1500 MST), transport maintenance kits when needed, and Rhythm software licenses, patches and updates. All transportation, labor, materials, and replacement parts are included in the contract price, though expendable spares and consumables remain the responsibility of YPG. Key personnel requirements include a Contract Manager and Alternate Contract Manager with minimum two years government contracting experience and WAWF knowledge, plus service technicians with current Waygate certification and minimum two years CRxFlex scanner experience. The contract includes nine deliverables covering personnel documentation, safety plans, training certifications, and maintenance reports. Government facility operating hours are 0500-1530 Monday-Thursday, and the contractor must comply with installation access requirements, background checks, and various mandatory training including Anti-Terrorism Level I, OPSEC, and iWATCH programs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUG24
PERFORMANCE WORK STATEMENT (PWS)
CRxFlex X-ray Scanner Maintenance May 28, 2025
Part 1 General Information
1. General: This is a non-personal service contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. The United States (U.S.) Government shall not exercise supervision or control over the Contractor’s employees performing the tasks herein. Such contract employees shall be accountable solely to the Contractor who, in turn shall be responsible to the U.S.
Government.
1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide services necessary to perform maintenance of the CRxFlex II scanner as defined in this Performance Work Statement (PWS).
1.2 Background: The CRxFlex II Computed Radiography scanner is used to provide radiographic imaging of the internal structure of test items at YPG. The images provide test personnel with data to determine the condition of test items before and after testing.
1.3 Scope: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services and provide two (2) preventive maintenance inspections (PMI). They are to provide remote support via telephone 8 hours a day, five days a week (8x5), provide transport maintenance kit and provide Rhythm software licenses, patches and updates as applicable contractors will provide all transportation, labor and materials to complete each PMI visit. Waygate Technologies is the manufacturer of proprietary equipment which, only certified technicians that have been through their course can maintain the CRxFlex II. The Contractor shall perform to the standards and acceptable quality levels identified in this PWS and associated contract documents.
1.4 Objectives: The CRxFlex II is vital to testing and safety at YPG. The maintenance contract will ensure the equipment is properly calibrated and maintained. The existing equipment, manufactured by GE Sensing & Inspection, requires biannual maintenance to service it. The contract will provide Preventative Maintenance Inspections (PMI) and software updates.
1.5 General Information:
1.5.1 Quality Control Plan (QCP): The contractor’s existing quality assurance system shall be utilized in accordance with FAR 12.208
1.5.1.1 RESERVED
1.5.1.2 RESERVED
1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.)
deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.
1.5.3.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer.
When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in Jan Presidents Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th
1.5.3.2 Host Nation Holidays: RESERVED
1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following:
1.5.4.1 Government Facility Office Hours: The Government facility office hours are 0500 to 1530 Monday through Thursday except U.S. Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.5.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0500 to 1530 Monday through Thursday. The Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor.
1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0500 to 1530 Monday through Thursday. The Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor. The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.
1.5.4.3.1 Contractor Work Plan: RESERVED
1.5.5 Training Holidays: RESERVED
1.5.6 Place of Performance: The work to be performed under this contract will be performed at the Radiography Facility, Building 3493 Kofa Firing Range (KFR), Yuma Proving Ground
(YPG).
1.6 Security Requirements: The following information is provided on security-related matters:
1.6.1 Security Program: RESERVED
1.6.2 Personnel Security Clearance Requirements: RESERVED
1.6.3 Access and general protection/security policy and procedures: Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204‐9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.6.3.1 Escorts: RESERVED
1.6.3.2 Installation Pass Log: RESERVED
1.6.3.3 Individual Termination or Expiration of Employment: RESERVED
1.6.3.4 Contract Termination or Cancellation: RESERVED
1.6.3.5 Common Access Cards (CAC) and CAC Log: RESERVED
1.6.4 Personnel Security Clearance Requirements: RESERVED
1.6.4.1 RESERVED
1.6.5 Background Checks The Contractor shall ensure contractor employees and subcontractor employees performing services under this contract have passed a security check conducted by the State Police Department of their U.S. residence. Security checks that have been completed as part of a personnel security clearance background investigation, or a previous background check that was a condition of employment, meet this requirement.
Documentation of these checks will be made available to the KO or COR upon request. The Government retains the right to exclude any employee from performance of duties under this contract if a background security check reveals an employee is a security risk. The exclusion of an employee for security reasons will not relieve the Contractor from performance of services required under this contract. If the Government determines additional background checks are required, at a minimum, and upon request from the Government, the Contractor shall provide to the KO or COR, the following information on any contractor or subcontractor employee performing services under this contract:
• Full birth name
• Married name (if applicable)
• SSN or local equivalent (ID card number)
• Date of birth
• Place of birth (city, country)
1.6.5.1 Background Check Notification Requirements: If a background check on any employee or subcontractor employee performing services under this contract, whether the check was conducted as a condition of employment or as part of the contract with the Government, reveals any information from any source (including host country law enforcement) of criminal activity by Contractor employees, subcontractors, or subcontractor employees, the Contractor shall immediately notify the KO and COR of that information. The Contractor shall make notification of:
(1) Traffic violations, other than parking, will be reported to the KO or COR only if the contract is for drivers for the Government;
(2) Any suspicious activity by Contractor employees, subcontractors, or subcontractor employees the Contractor believes may pose a risk to U.S. or host nation national security or imminent risk of deadly bodily harm to any person; and
(3) Any actions taken against Contractor employees, subcontractors, or subcontractor employees pursuant to this requirement.
1.6.5.2 Remedies. In addition to other remedies available to the Government, the Contractor’s failure to comply with the requirements of this paragraph my result in requiring the Contractor to remove a contractor employee or employees from the performance of the contract.
1.6.5.3 Subcontracts. The Contractor shall include the substance of this paragraph and the preceding paragraph in all subcontracts.
1.6.6 Uncleared Contractor Common Access Card (CAC) Credentialing and Access Procedures: RESERVED
1.6.6.1 Contractor Common Access Card (CAC) Eligible Requirements: RESERVED
1.6.6.1.1 Federal Installation/Facility Access: Contractor and all associated sub-contractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The employee performing services under this contract shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, Security Office or the host nation equivalent.
1.6.6.2. Contractor Non CAC Eligible Requirements for DOD Facility and Installation Access: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014- 05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.6.7 Access to Government Information Systems: RESERVED
1.6.8 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13.
1.6.9 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.
1.6.9.1 Operations Security (OPSEC) SOP/Plan Requirements: RESERVED
1.7 Key Control: RESERVED
1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter.
Meetings may start or end outside of regular duty hours.
1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
1.10 Key Personnel: The following personnel are considered key personnel by the Government: Contract Manager/Alternate, Service Technician(s). The Contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of this person and an Alternate Contract Manager, who shall act for the Contractor when the Contract Manager is absent, along with a Curriculum Vitae (CV) for each of these individuals, shall be provided in writing to the Contracting Officer no later than five (5) calendar days after contract award (Deliverable # 1). (Acceptance of the CV by the Contracting Officer is required before these individuals are permitted to perform any task on this contract.) The Contract Manager and Alternate Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contract Manager or Alternate Contract Manager shall be available between 0600 – 1730, Monday through Friday. Qualifications for all key personnel are listed below:
a. Contract Manager and Alternate Contract Manager: The CV provided by the Contract Manager and Alternate Contract Manager must demonstrate knowledge with government contracts and in using Wide Area Work Flow (WAWF) with a minimum of two years’ experience. They must be able to oversee the entire lifecycle of the contract, from pre-award to sustainment, ensuring compliance with all relevant regulations and requirements.
Contractor shall provide a resume as proof of minimum 2 years of experience required.
b. Special Qualifications or certifications: The Contractor shall ensure all service technicians possess and maintain current certification through Waygate to work on proprietary equipment and Rhythm Review software. They must have a minimum of two years of experience servicing CRxFlex scanners and software. Certifications and resumes shall be provided by the contractor to show proof of the required experience servicing the CRxFlex scanners and ensure that certifications are current and accurate.
1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.11.1 RESERVED
1.11.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715). (For services at Child, Youth, and School Services where children are present, recommend personnel wear identification when children are present.) ): If required by the Government, contract personnel and all associated subcontractor’s employees accessing U.S. facilities or activities, shall present a valid picture ID provided by the Government while accessing Government owned or contracted facilities and shall adhere to facility security policies and restrictions. If applicable, Government issued access badges will not be worn outside designated facility where visible to the general public. Contractor personnel shall return all U.S. Government issued identification to appropriate U.S. Government authorities within five (5) calendar days of the end of their contractual duties. The Contractor (to include subcontractors) shall provide each of their employees an easily readable identification badge. The badge must include the employee’s name, the contractor’s company name, the functional area of assignment, and a recent color photograph of the employee. Companies with U.S. Government contracts will require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations. The Contractor shall collect all ID Badges upon completion of the contract or termination of employee. A listing of issued ID cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor personnel changes.
(Deliverable #2)
1.11.3 Uniform RESERVED
1.12 Contractor Travel: RESERVED
1.13 Other Direct Costs (ODCs): RESERVED
1.14 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.15 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel, shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
1.16 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/ , the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
1.17 Non-Disclosure Statements: RESERVED
1.18 Advertisement and Social Media: The Contractor shall NOT post information to public website or social media locations, personal or professional, that in any way disclose names, locations, hotel data, participants, discussions, pictures, etc. before, during or after the contract period of performance without the express consent of the Government. The use of propaganda violates DOD Commercial Use of Imagery Guidelines stated at (http://www.defenseimagery.mil/products/DODimagery/commercialuse.html). The Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any marketing tools to include its company website.
http://www.dimoc.mil/resources/limitations/
1.19 Information Assurance: At no time will the Contractor or associated sub-contractor employees transmit government documents or information over using methods that do not meet the security requirements specified in the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, "Protecting Controlled Unclassified Information (CUI) in Nonfederal Information Systems and Organizations" such as personal electronic mail accounts, public digital data storage sites (cloud storage), social media platforms or instant messaging. Approved government sites such as DoD SAFE at https://safe.apps.mil, or All Partners Access Network (APAN) at https://community.apan.org/, or other transmission means determined by the government must be used.
1.20 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. (Deliverable #3) The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.21 Phase In /Phase Out Period: RESERVED
1.22 Safety: The following provides information pertaining to Safety and Accident Prevention:
1.22.1 Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g. U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)
The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:
(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel (Deliverable #4) . Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.
(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to http://www.usace.army.mil/ perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1);
(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work;
(d) The Contractor shall discuss the plans in conferences convened by the Contracting
Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within fifteen
(15) calendar days after award of the contract (Deliverable #4). Plans for subsequent major phases of work shall be submitted no later than fifteen (15) calendar days prior to initiation of work on each major phase; and
(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:
(i) Short sleeve shirt;
(ii) Long trousers;
(iii) Steel-toed safety boots; and
(iv) Hard hat.
1.22.1.1 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes.
The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract.
1.22.1.2 The Contractor shall complete and provide safety notifications required by local / federal authorities and will provide documented proof to the Contracting Officer via the COR, but no later than 4 hours after the occurrence. (Deliverable #5)
1.23 Environmental Compliance: RESERVED
1.23.1 Environmental Compliance Plan and Program: RESERVED
1.24 Required Training: The following provides information on training requirements.
1.24.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract shall complete AT Level I Training within 30 calendar days after contract start date (Deliverable #6) or effective date of incorporation of this requirement into the contract, whichever applies, or 30 calendar days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR or to the Contracting Officer, if a COR is not assigned within 5 calendar days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training (Deliverable #6) every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies.
1.24.1.1 If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training.
Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within 5 calendar days after completion of the training (Deliverable #6).
1.24.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within 30 calendar days of employment under this contract (Deliverable #7). Verification of the training shall be provided to the COR within 5 calendar days after completion of the training (Deliverable #7). OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel must complete refresher training every 12 months (Deliverable #7) Verification of the training shall be provided to the COR within 5 calendar days after completion of the training (Deliverable #7).
1.24.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days after the contract is awarded and within 5 calendar days after new employees commence contract performance, with the results reported to the COR within 30 calendar days after the contract is awarded and within 5 calendar days after new employees commence contract performance (Deliverable #8). Verification of the training shall be provided to the COR within 30 calendar days after completion of the training (Deliverable #8).
1.24.4 Information Assurance (IA) / Information Technology (IT) Training: RESERVED https://jkodirect.jten.mil/ http://www.cdse.edu/catalog/elearning/GS130.html
1.24.5 Personally Identifiable Information (PII): RESERVED
1.24.6 Threat Awareness Reporting Program (TARP Training): RESERVED
1.25 Government Property and Services: RESERVED
1.26 Safety Requirements: RESERVED
PART 2
DEFINITIONS & ACRONYMS
2. Definitions and Acronyms
2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.
Contracting Officer – means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. DoD Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, Contracting Officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing other surveillance support personnel to assist the COR when needed, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the Contracting Officer as alternate CORs.”
Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
Contractor-acquired Property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.
Day – means, unless otherwise specified, a calendar day.
Defective Service – means a service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable – means anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
Government-furnished Property – As reflected in FAR 52.245-1, Government-furnished Property “means property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract
Government Property - means all property owned or leased by the Government. Government property includes both Government-furnished and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
Property Administrator - means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.
High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.
Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.
Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document, and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.
Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.
Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
Work Day - The number of hours per day the Contractor provides services in accordance with the contract.
Work Week - Monday through Friday, unless otherwise specified.
2.2 Acronyms: Although not inclusive of every term used within this PWS, or that may be included in an acquisition, the following provides a list of acronyms commonly used in the acquisition field.
AHA Activity Hazard Analysis AOR Area of Responsibility AR Army Regulation AT Anti-terrorism ATO Anti-terrorism Officer CAC Common Access Card COR Contracting Officer’s Representative CUI Controlled Unclassified Information DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense EM Engineering Manual FAR Federal Acquisition Regulation FPCON Force Protection Condition HLO High Level Objective HQDA Head Quarters Department of Army ID Identification IT Information Technology KO Contracting Officer KFR Kofa Firing Range NCIC-III National Crime Information Center Interstate Identification Index
NIST National Institute of Standards and Technology OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operations Security PII Personally Identifiable Information PMI Preventative Maintenance Visit PRS Performance Requirements Summary PWS Performance Work Statement QASP Quality Assurance Surveillance Plan QCP Quality Control Program SOP Standard Operating Procedures SSN Social Security Number TARP Threat Awareness Reporting Program TSDB Terrorist Screening Database WAWF Wide Area Work Flow YPG Yuma Proving Ground
PART 3
GOVERNMENT PROPERTY (GP) AND SERVICES
3. Government Furnished Property
The Government will not provide property or services in the performance of this contract.
3.1.1 RESERVED
3.1.2 RESERVED
3.1.2.1 Final Inventory. RESERVED
3.1.3 RESERVED
3.1.4 RESERVED
3.1.5 RESERVED
3.1.6 RESERVED
3.1.7 RESERVED
3.1.8 RESERVED
3.2 Emergency and Rescue
3.2.1 The Government will furnish emergency medical and rescue services to prevent loss of life, limb, or undue suffering within the areas serviced by the applicable installation emergency services provider. The Government will seek reimbursement for medical services rendered, as appropriate.
3.2.2 The Government will provide installation fire services to include firefighting, fire prevention inspections and investigations; Installation security services; confined space rescue; and Hazardous Material (HAZMAT) first response.
3.3 Telecommunications/Utilities RESERVED
3.4 Government Owned Vehicles RESERVED
3.5 GFE Tools, Hand Tools, Equipment; Test, Measurement and Diagnostic Equipment (TDME) Calibration Services: RESERVED
3.6 Government Furnished Facilities and Real Property: RESERVED
3.7 Government Furnished Services: RESERVED
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. Contractor Furnished Property and Services
4.1 General: The Contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services.
4.2 Secret Facility Clearance: RESERVED
4.3 Materials: RESERVED
4.4 Vehicles and Equipment: RESERVED
4.5 Background Checks): RESERVED
PART 5
SPECIFIC TASKS
5.1 Basic Services: The Contractor shall provide non-personal services and support to the US Army Yuma Proving Ground Radiographic Facility for the maintenance and repair of the CRxFlex II CR Scanner.
• Provide two (2) preventive maintenance inspections (PMI) per annually
• Provide technical support.
• Provide remote support via telephone 8 hours a day, five days a week (8x5).
• Provide Transport Maintenance Kit.
• Provide Rhythm software licenses, patches and updates as applicable
Contractor will provide all transportation, labor and materials to complete each PMI visit
5.2 Tasks:
5.2.1 System maintenance and support:
5.2.1.1 Preventive Maintenance Inspections: This contract requires the contractor to provide
(2) annual preventive maintenance inspections (PMI) visits every year of the contract for equipment.
(a) After maintenance the contractor shall pass a performance check on and/or calibrate the equipment as applicable to ensure proper functioning. These visits will be scheduled in coordination with the COR.
(b) AQL: 100% compliance. The contractor needs to provide a report of all maintenance/repairs performed within 5 calendar days. (Deliverable #9)
5.2.1.2 Tech Support: Contractor will provide remote support via telephone.
(a) This support will be provided by telephone 8 hours a day (0700-1500 MST), five days a week to troubleshoot equipment and/or software issues.
(b) AQL: 100% Compliance.
5.2.1.3 Transport Maintenance Kit: Provide a transport maintenance kit during one PMI visit when needed.
(a) The contractor will provide a transport maintenance kit when equipment needs replacement. The costs for all replacement parts are included in the contract price. This contract does not cover or include any expendable spares or consumable items/parts which are the responsibility of the instrument owner (YPG).
(b) AQL: 100%
5.2.1.4 Rhythm software licenses, patches and updates as applicable: Contractor will provide all patches and updates to maintain current version for equipment.
(a) During PM visits the contractor will ensure that all proprietary software is up to date and has all required licenses and no patches are required. After updates the contractor will run a test to ensure all hardware and software are communicating and working to manufacturers’ standards.
(b) AQL: 100% compliance
5.3 Service Contract Reporting: Service Contract Reporting is not applicable to this contract.
PART 6
APPLICABLE PUBLICATIONS
6. Applicable Publications (Current Editions): The following publications, manuals, regulations, etc. are mentioned in this PWS and are listed below.
6.1.1 Personal Identity Verification of Contractor Personnel (FAR clause 52.204-9)
6.1.2 National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13)
6.1.3 Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
6.1.4 National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171
6.1.5 U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)
PART 7
ATTACHMENT AND TECHNICAL EXHIBIT LISTING
7. Attachment and Technical Exhibit List
7.1 Technical Exhibit A Performance Requirements Summary
7.2 Technical Exhibit B – Deliverables Schedule
7.3 Attachment 1 – RESERVED
7.4 Attachment 2 – RESERVED
7.5 Attachment 3 – RESERVED
TECHNICAL EXHIBIT A
Performance Requirements Summary (PRS)
Performance Objective
Standard Performance Threshold
Incentive (Positive and/or
Negative)
PRS #1. Combating Trafficking in Persons
FAR 52.222-50 c
The Contractor shall Notify its employees of
a. The United States Government's zero tolerance policy described in paragraph
(b) of this clause
The actions that will be taken against employees for violations of this policy. Such actions may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment.
100% Compliance
Contractor compliance rate shall be utilized as objective evidence of contract compliance
PRS #2
(Para 5.2.1.1)
Preventative Maintenance Inspection
The contractor shall provide (2) PMI visits per year.
The contractor will visit the site twice a year to repair, replace parts and re-calibrate the
CRxFlex II. SN# 02269.
100% compliance
Contractor compliance rate shall be utilized as objective evidence of contract compliance
PRS #3
(Para 5.2.1.2) Tech
Support Phone availability during business hours Mon-Fri
0700-1500 MST
Phone support during the year. 100% compliance compliance rate shall be utilized as objective evidence of contract compliance
PRS #4
(Para 5.2.1.3)
Provide (Qty1) per year Sets of Transport and
Upper scan rollers.
Contractor will ship to site and have on hand during PMI visit on set of Maintenance Kits per year. Kit will be consumed during one of the two yearly visits.
100% Compliance
Contractor compliance rate shall be utilized as objective evidence of contract compliance
PRS #5
(Para 5.2.1.4) Provide Rhythm software, patches, and updates.
Contractor shall confer with representative of the contract and if deemed beneficial install any software, patches and updates to the software package.
100% Compliance
Contractor compliance rate shall be utilized as objective evidence of contract compliance
TECHNICAL EXHIBIT B
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To
Deliverable #1 Key Personnel Para (1.10) no later than five (5) days after contract award or as needed to reflect personnel changes.
One copy to the Contracting Officer through the Contracting Officer’s Representative
(COR)
Provide document sent via email
To the Contracting Officer through the Contracting Officer’s Representative (COR)
Deliverable #2
Identification Badges Para (1.11.2)
Every 6 months or as needed to reflect contractor personnel changes.
One copy to the Contracting Officer through the Contracting Officer’s
To the Contracting Officer through the
Deliverable #3 Organizational Conflict of Interest
(OCI)
Para (1.20)
Immediately
One copy to the Contracting Officer through the Contracting Officer’s Representative
(COR)
Provide OCI Mitigation Plan via email
To the Contracting Officer through the
Deliverable #4 Safety Laws and Regulations Para (1.22.1 (a)(d))
Before initiation of work at the job site, 15 days prior
One copy to the Contracting Officer through the Contracting Officer’s
To the Contracting Officer through the
Deliverable #5 Safety Laws and Regulations Para (1.22.1.2)
4 hours after the occurrence
One copy to the Contracting Officer through the Contracting Officer’s
To the Contracting Officer through the
Deliverable #6 Anti-Terrorism Training Para (1.24.1)
30 days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 days after employment of new personnel. Contractor personnel shall complete refresher training every twelve (12) months
One copy to the Contracting Officer through the Contracting Officer’s
PDF copy of certificate sent via email
To the Contracting Officer through the
Deliverable #7 OPSEC Training Para (1.24.2)
30 days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 days after employment of new personnel. Contractor personnel shall complete refresher training every twelve (12) months
One copy to the Contracting Officer through the Contracting Officer’s
PDF copy of certificate sent via email
To the Contracting Officer through the
Deliverable #8 iWatch Training Para (1.24.3
This training shall be completed within 30 days after the contract is awarded and within 5 days after new employees commence contract performance
Verification of the training shall be provided to the COR within 30 days after completion of the training
Roster sent electronically via email to Contracting Officer’s
To the Contracting Officer through the
Deliverable #9 Para (5.2.1) Maintenance inspection report
No later than 5 days after each preventative maintenance inspection repair service.
One copy to the Contracting Officer through the Contracting Officer’s
PDF Copy of report(s) sent via email or hand delivered after service
To the Contracting Officer through the
File details come from the government source that posted it. Updated .