Attachment 1 - PWS.docx

DOCX document 28 KB Posted

Attached to
Repair Stock Tanks Federal contract opportunity
Solicitation number
1232SA25Q0236
Issued by
Department of Agriculture Agricultural Research Service

About this file

This Performance Work Statement (PWS) details a contract for repairing and replacing stock tanks at the Oklahoma & Central Plains Agricultural Research Center (OCPARC), Southern Plains Research Laboratory. The project involves installing four new fiberglass stock tanks across two locations: one 12'x2' tank in Woodward, OK, and three tanks (one 24'x2', one 12'x2', and one 30' steel ring tank) at the Southern Plains Experimental Range near Ft. Supply, OK.

The comprehensive scope of work includes supplying and installing tanks, accessories, plumbing, and fencing, as well as removing existing infrastructure, cleaning concrete pads, installing new overflow piping, and cleaning up debris. Work is to be performed between 7:00am-4:00pm, Monday-Friday, excluding federal holidays. The solicitation (Number 1232SA25Q0236) is issued by the USDA Agricultural Research Service as a request for quotation, with quotes due by 6:30 a.m. Central Time on July 10, 2025. The government intends to award a firm fixed-price purchase order to the most advantageous offeror, considering technical acceptance, past performance, and price.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Stock Tanks, newest first.
File Type Posted
Pictures.zip ZIP file
Sol_1232SA25Q0236.pdf PDF
Attachment 2 - Wage Determination 2015-5321.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

PURPOSE AND CONTENT

The purpose of this Performance Work Statement is to select a vendor to repair/replace 4 stock tanks for the Oklahoma & Central Plains Agricultural Research Center (OCPARC), Southern Plains Research Laboratory 2000 18th Street, Woodward, OK 73801. One tank will be located in Woodward, OK and three tanks will be located at the SPER, North of Ft. Supply, OK.

BACKGROUND

The Facilities and Site SPER consists of approximately 5,400 acres and is currently engaged in developing and improving native grasses and wheat pasture supplementation research for grazing cattle. The 3 concrete/metal stock tanks and continuous fencing being replaced are over 25 years old. One 30” bottomless steel stock tank (government provided steel ring only) replacing concrete/metal tank over 25 years old.

Specific Requirements and Specifications

1. Woodward: Supply one (1) 12’x2’ single seam, heavy duty fiberglass stock tanks equal or comparable to WW Tanks, with additional accessories, and fencing to the “love grass quarter” at 2000 18th St Woodward Ok (see attached photos).

2. Ft. Supply (SPER): Supply one (1) 24’x2’ and (1) 12’x2’ single seam, heavy duty fiberglass stock tanks equal or comparable to WW Tanks, with additional accessories, and fencing to “pasture 17”, and “pasture 4” and additional accessories, and fencing to “Corral 4” for a 30’ steel ring tank (Government provided steel ring only) at the Southern Plains Experimental Range (see attached photos). Supply continuous fencing to “pasture 2” (see attached photos).

3. Provide all materials, labor and expertise to install three (3) single seam fiberglass stock tanks, accessories, plumbing and fencing.

4. Install 30’ bottomless steel stock tank (government provided steel ring only), panels, plumbing and fencing.

5. Remove the existing continuous center pole fencing that extends across the watering facility, stock tanks and accessories.

6. Clean existing concrete pads and replace old overflow piping.

7. Install new overflow piping to the existing length and to a sufficient depth to provide protection from hazards imposed by traffic, animals and freezing.

8. Install new continuous fencing without the center pipe across the new tanks to separate watering areas in the same tank.

9. Install new continuous fencing without the center pipe across the existing 24’ fiberglass tank in Pasture 2.(see photos)

10. Clean up old materials, trash and debris resulting from the tear-out and install.

11. Inspect and test new stock tanks.

12. Work hours: 7:00am-4:00pm, Monday-Friday except for recognized Federal Holidays. Work outside of these hours requires the prior consent of the Contracting Officer.

13. Site visit attendance is mandatory to provide an offer on this solicitation.

Safety Contractors are expected to always foster and operate in a safe and expeditious manner.

Contact for site visit

Joe Goodballet, Facility Maintenance Representative Oklahoma & Central Plains Agricultural Research Center USDA, Agricultural Research Service 2000 18th Street Woodward, OK 73801 Phone: 580-571-6434, Fax: 580-256-1322, Email, joe.goodballet@usda.gov

File details come from the government source that posted it. Updated .