This document is a Performance Work Statement (PWS) for a contract to move equipment from Building 7011 Dining Facility on Fort Riley, Kansas. The contractor shall provide all personnel, equipment, packing supplies, transportation, tools, materials, supervision, and other non-personal services necessary to complete the following tasks:

  1. Remove and transport yellow-tagged equipment from Building 7011 to Building 7920 for storage.
  2. Remove and dispose of red-tagged equipment from Building 7011 in the dumpster behind the building.
  3. Provide all transportation, including fuel and specialized equipment like dollies, lifts, and packing materials.

The period of performance is from August 12 through August 23, 2024. This is a firm-fixed price contract with no options. The government will evaluate the contractor's performance through a Quality Assurance Surveillance Plan. Key contractor personnel include a contract manager responsible for overseeing the work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Building 7011 Dinning Facility Equipment Move

PART 1

GENERAL INFORMATION

1. General: This is a non-personnel services contract to provide support to move Building 7011 Dinning Facility Equipment. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to support the move of Building 7011 Dinning Facility Equipment as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: 407th AFSB manages the Building 7011 Dinning Facility. During a recent weather related water break damages was caused to the interior of the facility requiring it to be shut down for repairs. Department of Public Works (DPW) owner of the facility related the damage are too expensive and a renovation that was scheduled later would be pushed forward. This has resulted in the 407th AFSB in a requirement to remove their hand receipted equipment from the building. All equipment to be moved in building 7011 will be marked with Yellow and Red tags.

1.3 Objectives: Contractor shall move Building 7011 dinning facility equipment listed on Attachment 03 (Yellow Tagged) to Building 7920 on Ft Riley Kansas and equipment listed on Attachment 04 (Red Tagged) to the dumpster behind Building 7011.

1.4 Scope: Services include the following: The contractor shall provide all personnel, equipment, packing supplies, transportation, tools, materials, supervision, and all other items (non-personal services) necessary to perform the task as described within this Performance Work Statement (PWS). The dinning facility equipment in Attachment 03 (Yellow Tagged) will be removed from Building 7011 on Fort Riley, Kansas 66442 and transported to Building 7920 for storage. The dinning facility equipment in Attachment 04 (Red Tagged) will be removed from Building 7011 on Fort Riley, Kansas 66442 and placed in dumpster behind Building 7011. Contractor shall provide transportation to the work areas including fuel and any other specialized equipment such as dollies, lifts, moving blankets, wrapping paper, safety cones etc. All costs shall be covered by contractor. The contractor shall accomplish this service requiring the equipment to be delivered by the Contractor to the Government are non-personal services, and no employer-employee relationship exists or will exist under the contract between the Government and Contractor and/or between Government personnel. Contractor personnel shall be responsible not to the Government, but solely to the Contractor, who shall be accountable to the Government.

0. Period of Performance: The period of performance shall be from 12 August thru 23 August 2024

0. General Information

1.6.1 Quality Control:

Quality Control is the responsibility of the contractor. The contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.212-4, Contractor Terms and Conditions – Commercial Items). A formal Quality Control Plan (QCP) is not required for this commercial service. However, the contractor shall maintain an inspection system commensurate with commercial practices to ensure the Contractor only tenders for acceptance those items or services that conform to the requirements of this contract.

1.6.2 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is a Government only document primarily focused on what the Government must do to assure that the contractor has performed in accordance with the requirements of the contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. Non-conforming services shall be re-performed at no increase in contract price. If non-conforming services are recurring, cannot be re-performed, or the services fail to achieve the Performance Requirements Summary (PRS), the Government may reject the nonconforming service(s) and document the contractor’s performance record accordingly. The Government may also issue a Contract Discrepancy Report (CDR) in which the contractor will be required to respond with the development of a corrective action plan (CAP) which identifies the root cause, corrective action (CA) for the root cause, CA for the specific nonconformance, and the date the CAs will be complete. The Government may also reduce the payment to the contractor IAW the PRS, or reduce payment to reflect the value of the services performed, or may perform the services and charge the Contractor for any related cost incurred and/or may terminate this contract for cause.

1.6.2.1 Non-conforming Supplies or Services: When a contractor’s performance does not meet contract requirements and/or approved work schedules and/or timeframes it is considered non-conformance. Non-conformance shall be classified in one of three categories: level I (Minor), level II (Major) or level III (Critical). The Government may re-inspect work designated for re-performance or late performance.

1.6.2.1.1 Level I (Minor) non-conformance: is defined as a non-conformance that is not likely to materially reduce the usability of the supplies or services for their intended purpose, or is a departure from established standards having little bearing on the effective use or operation of the supplies or services. Minor non-conformance usually can be corrected on the spot, where no further corrective action (CA) response is necessary, and can be issued by the COR to the contractor either through a verbal or written non-conformance report. Minor non-conforming services shall be re-performed within a specified time frame at no increase in contract price. If minor non-conformances are recurring or re-performance is not completed in full and within the specified time a Level II non-conformance may be issued to the contractor by the Contracting Officer (KO).

1.6.2.1.2 Level II (Major) non-conformance: is defined as a non-conformance, other than critical, that is likely to result in failure of the supplies or services, or to materially reduce the usability of the supplies or services for their intended purpose. Recurring Minor non-conformances, or a non-responsive contractor, indicating a trend or failure of the contractor’s quality control, can also be classified as a Major non-conformance. Major non-conformance’s shall result in the issuance of a written CDR from the KO to the contractor requiring the development of a CAP by the contractor which identifies the root cause, CA for the root cause, CA for the specific non-conformance and the date CAs will be completed.

1.6.2.1.3 Level III (Critical) non-conformance: is defined as a non-conformance that is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the supplies or services; is likely to prevent performance of a vital agency mission; is for a repeated or uncorrected level II CDRs; or is for a non-responsive contractor to a level II CDR. Critical non-conformances shall result in the issuance of a written CDR to the contractor requiring the development of a CAP by the contractor which identifies the root cause, CA for the root cause, CA for the specific non-conformance and the date CAs will be completed.

1.6.2.1.4 Inspection Results: The contractor will be notified of Government inspection results. The contractor shall acknowledge receipt of the inspection results. The contractor may be notified of inspection results verbally. Verbal notifications of defective work will be confirmed in writing. When Government inspectors are unable to contact the contractor to notify the contractor of inspection results, acceptance or rejection of work will be made on the basis of the initial inspection.

1.6.3 Federal Government Holidays:

New Years Day1st day of January
Martin Luther King Jr.'s Birthday3rd Monday of January
Presidents Day3rd Monday of February
Memorial DayLast Monday of May
Juneteenth19th day of June
Independence Day4th day of July
Labor Day1st Monday of September
Columbus Day2nd Monday of October
Veterans Day11th day of November
Thanksgiving Day4th Thursday of November
Christmas Day25th day of December

1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0730-1630 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Extended hours maybe granted by the Contracting Officer upon written request by email. The Contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.5 Place of Performance: The work to be performed under this contract will be performed at Building 7011 and Building 7920 on Ft Riley Kansas.

1.6.6 Type of Contract: The government will award a onetime Firm Fixed Priced with no options.

1.6.7 Antiterrorism (AT) and Operations Security (OPSEC)

1.6.7.1 Access and General Protection/Security Policy and Procedures: Contractor and all associated sub-contractors’ employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshall Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.6.7.1.1 Identification of Contractor Employees: The Contractor (to include subcontractors) shall provide each employee an Identification (ID) Badge, which includes at a minimum, the Company Name, Employee Name and a color photo of the employee. ID Badges for Key Personnel shall also indicate their job title. ID Badges shall be worn at all times during which the employee is performing work under this contract. Each Contractor (to include subcontractors) employees shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The Contractor (to include subcontractors) shall be responsible for collection of ID Badges upon completion of the contract or termination of employee. A listing of issued identification cards shall be furnished to the Contracting Officer within one day after the signed award of the contract and prior to the contract performance start date and updated as needed to reflect Contractor and Subcontractor personnel changes. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.7.1.2 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.6.7.1.3 Installation Access and Control: Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.6.7.1.4 Security Requirements: N/A

1.6.7.1.5 Key Control: N/A

1.6.7.1.5.1. N/A

1.6.7.1.6 Lock Combinations: N/A

1.6.7 Special Qualifications: N/A

1.6.8 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting Officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.6.9 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.10 Key Personnel: The following contractor personnel are considered key personnel by the government: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting Officer prior to the start of the contract. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0730-1630 daily, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.

1.6.11. Supervision of Contractor Employees: The Government will not exercise any supervision or control over Contractor or subcontractor employees while performing work under the contract. Such employees shall be accountable solely to the Contractor, not the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or subcontractor employees.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACT ADMINISTRATOR. The official Government representative delegated authority by the Contracting Officer to administer a contract. This individual is normally a member of the appropriate Contracting/Procurement career field and advises on all technical contractual matters.

2.1.2. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or services to the government. The term used in this contract refers to the prime.

2.1.3. CONTRACTING OFFICER. A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.4. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.5. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.6. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.7. GOVERNMENT-FURNISHED PROPERTY (GFP) OR GOVERNMENT PROPERTY (GP). Property in the possession of, or directly acquired by, the Government and subsequently made available to the Contractor.

2.1.8. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.9. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.10. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are acceptable in accordance with established standards and requirements of this contract.

2.1.11. QUALITY ASSURANCE SPECIALIST. An official Government representative concerned with matters pertaining to the contract administration process and quality assurance/quality control. Acts as technical advisor to the Contracting Officer in these areas.

2.1.12. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.13. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.14. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.15. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.16. WORK WEEK. Monday through Friday, except for Federal holidays unless specified otherwise.

2.2. ACRONYMS:

ACORAlternate Contracting Officer's Representative
AFARSArmy Federal Acquisition Regulation Supplement
ARArmy Regulation
CFRCode of Federal Regulations
CMRContract Manpower Reporting
CONUSContinental United States (excludes Alaska and Hawaii)
CORContracting Officer Representative
COTRContracting Officer's Technical Representative
COTSCommercial-Off-the-Shelf
DADepartment of the Army
DD250Department of Defense Form 250 (Receiving Report)
DD254Department of Defense Contract Security Requirement List
DFARSDefense Federal Acquisition Regulation Supplement
DMDCDefense Manpower Data Center
DODDepartment of Defense
FARFederal Acquisition Regulation
HIPAAHealth Insurance Portability and Accountability Act of 1996
KOContracting Officer
NLTNo later than
OCIOrganizational Conflict of Interest
OCONUSOutside Continental United States (includes Alaska and Hawaii)
ODCOther Direct Costs
PIPOPhase In/Phase Out
POCPoint of Contact
PRSPerformance Requirements Summary
PWSPerformance Work Statement
QAQuality Assurance
QAPQuality Assurance Program
QASPQuality Assurance Surveillance Plan
QCQuality Control
QCPQuality Control Program
TETechnical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: N/A

3.2 Facilities: The Government will provide Building 7920 to store the equipment.

3.3 Utilities: The Government will provide all utilities in the facility will be available for the contractor’s use in performance of tasks outlined in this PWS. The Contractor (to include subcontractors) shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

3.4 Equipment: N/A

3.5 Materials: N/A

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2 Secret Facility Clearance: N/A

4.3. Materials: The Contractor shall provide, i.e., furnish materials, supplies, and equipment necessary to meet the requirements under this PWS.

PART 5

SPECIFIC TASKS

5. SPECIFIC TASKS:

5.1. Basic Services. Contractor shall move Building 7011 dinning facility equipment listed on Attachment 03 (Yellow Tagged) to Building 7920 on Ft Riley Kansas and equipment listed on Attachment 04 (Red Tagged) to the dumpster behind Building 7011.

5.2. Task Heading. Building 7011 Dinning Facility Equipment Move

5.3. CONTRACTOR MANAGEMENT REPORTING (CMR): The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for Kansas via secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/, and then click on "Department of the Army CMRA" or the icon of the DoD organization that is receiving or benefitting from the contracted services. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2014. Contractors may direct questions to the help desk by clicking on "Send an email" which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component's CMR website.

The required data fields include: (1) Contracting Office, Contracting Officer, or also known as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement.

As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. The specific formats for the XML direct transfer may be downloaded from the website.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

6.1. The Contractor (to include subcontractors) must abide by all applicable regulations, publications, manuals, and local policies and procedures. Publications listed below form a part of this section to the extent referenced. Publications are referred to in the text by basic designation only. Assume publications to be the most current edition in effect at the time a contract is awarded.

6.2. Location of Publications and Forms. The Contractor shall utilize the Internet to view and print electronic versions of required publications and Forms.

DA publications can be obtained through http://www.usapa.army.mil.

DOD publications can be obtained through http://www.web7.whs.osd.mil/corres.htm.

FORSCOM publications and Forms can be obtained through http://www.forscom.army.mil.

TMs are available through Army Knowledge Online (AKO) at https://www.us.army.mil/suite/login/welcome.html or the Logistics Support Activity at https://www.logsa.army.mil/etms/online.htm.

PUBLICATION
TITLE
DATE
AR 190-13ADV
The Army Physical Security Program
Sep 19
AR 385-10MAN
Army Safety Program
Feb 00
AR 385-40MAN
Accident Reporting and Records
Nov 94
AR 420-1
Army Facilities Management
Nov 07
AR 420-90MAN
Fire and Emergency Services
Sep 97
AR 735-5MAN
Policies and Procedures for Property Accountability
Feb 05
29 CFR 1910. - ADV
Department of Labor, Occupational Safety and Health Act
Jul 00
29 CFR 1920 - ADV
Hazardous Waste Operations and

Emergency Response; Final Rule, Monday, March 6, 1989 Mar 89

29 CFR 1926 - ADV
Department of Labor, Occupational Safety and Health Act, Part III
DOD 5500.7-R MAN
DOD Joint Ethics Regulation
Aug 93
EM 385-1-1MAN
U.S. Army Corps of Engineers Safety and Health Requirements Manual
Nov 03
EM 385-40
Safety Accident Reporting and Records
1994
FARMAN
Federal Acquisition Regulation
Jun 98

FORSCOM Supp 1, AR 340-21

The Army Privacy Program
Jul 85
FORSCOM Supp 1AR 380-5
Department of the Army Information Security Program
Sep 00
OSHA 2201 - MAN
General Industry Safety
Sep 83
U.S.C. Title 18, Sections 793 and 798
Crimes and Criminal Procedures
Jan 04

Public Law 93-502, and 5 U.S.C., Section 552.

Freedom of Information Act of 1975
Updated 1996

6.1 Forms. The following is a list of forms the Contractor may use in performance of Tasks outlined in Section 5 of this PWS.

FORM
TITLE
DATE
DA Form 285
U.S. Army Accident Investigation Report
Jan 92
DA Form 4755
Employee Report of Alleged Unsafe or Unhealthy Working Conditions
Oct 78
DA Form 5513-R
Key Control Register and Inventory
Aug 93
DD Form 1662
DOD Property In The Custody of Contractors
Jun 03
FORSCOM Form 247-R
Area Security Checklist
Jul 80
SF 364
Report of Discrepancy (ROD)
Feb 80
OSHA #200
Log of Occupational Injuries/Illnesses
OSHA #200
AR 190-40
Serious Accident Report
AR 190-13
The Army Physical Security Program
DA Form 285
U.S Army Accident Investigation Report

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. ATTACHMENTS/TECHNICAL EXHIBITS LISTING

7.1 Attachment 01 - Not Used

7.2 Attachment 02 - Performance Requirements Summary (PRS)

7.3 Attachment 03 - Equipment List (Yellow Tagged)

7.4 Attachment 04 - Equipment List (Red Tagged)

7.5 Attachment 05 - Wage Determination

ATTACHMENT 02

PERFORMANCE REQUIREMENTS SUMMARY

Required Services (Tasks)

Performance Standard
Acceptable Quality Level (This is the maximum error rate. It could be a possible “Zero Standard”
Method of Surveillance

# 1.

The contractor shall remove and load without damages to equipment and facilities PWS 5.1

The contractor will provide at minimum 100% damage free removal of equipment
0%
Customer Complaints and periodic visual inspection/monitoring

#2 The contractor shall transport Yellow Tagged equipment from Bldg 7011 to Bldg 7920 without damage.

PWS 5.1

The contractor will provide at minimum 100% damage free removal of equipment
0%
Customer Complaints and periodic visual inspection/monitoring

#3 The contractor shall move Red Tagged equipment from Bldg 7011 to dumpster behind Bldg 7011.

PWS 5.1

100% complete removal of Red Tagged Equipment
0%
Customer Complaints and periodic visual inspection/monitoring

#4 The contractor shall unload and store the equipment in building 7920 without damage to the equipment or facility. PWS 5.1 The contractor will provide at minimum 100% damage free unload and storage of equipment

0%
Customer Complaints and periodic visual inspection/monitoring

ATTACHMENT 03

EQUIPMENT LIST (Yellow Tagged)

ATTACHMENT 04

EQUIPMENT LIST (Red Tagged)