About this file

This Performance Work Statement (PWS) outlines the requirements for ABET's maintenance and reaccreditation of seven engineering and applied science programs at the Air Force Institute of Technology (AFIT). The period of performance is from October 1, 2024 through September 30, 2025.

The PWS specifies that ABET will provide their standard accreditation process to review and assess AFIT's programs, which have been ABET-accredited since 1963. The work will be performed at Wright-Patterson AFB, OH, with payment terms of 100% upon completion of requirements on a net 30 basis through Wide Area Work Flow. ABET must deliver all standard reports according to their established schedule of reviews and board decision process. This represents a continuation of AFIT's annual accreditation maintenance process that has been ongoing for decades.

View the file

Other files for this federal contract opportunity

Other files attached to Intent to Award Sole Source: ABET Annual Maintenance, newest first.
File Type Posted
Attachment 2 - SSJ ABET Annual Maintenance FY25_Redacted.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

For

ABET Maintenance of AFIT’s Academic Programs

Title: ABET Reaccreditation of AFIT’s Academic Programs

Document Date: 01 Nov 2024

1. Scope: ABET will evaluate seven of AFIT’s engineering and applied science programs for maintenance of accreditation based on the criteria established by the associated professional societies.

1.1 Background: AFIT’s engineering and applied science degree programs have been accredited by ABET since 1963, and the Institute has continually undertaken annual year reviews for maintenance of accreditation. This action is a continuation of that annual process for maintenance for accreditation.

2. Applicable Documents: N/A

3. Requirements/Salient Characteristics: ABET shall provide their standard accreditation process to review and assess AFIT’s engineering and applied science degree programs.

4. Delivery/Period of Performance: ABET will perform maintenance, as needed, for PoP 10/01/2024 through 09/30/2025 as part of the reaccreditation process. ABET shall deliver all of the standard reports based on ABET’s standard schedule of reviews and board decision process.

4.1 Place of Performance: This is an F.O.B. destination requirement.

Air Force Institute of Technology (AFIT/EN) ATTN: Dr. Muhammad M. Rahman 2950 Hobson Way Wright-Patterson AFB, OH 45433-7765

4.2 Payment: 100% payment upon completion of all requirements specified in this Performance Work Statement. Payment shall be made on a net 30 basis. Invoices shall be submitted and paid through Wide Area Work Flow (https://wawf.eb.mil/).