This document is a Pricing Schedule for a federal contract opportunity (Solicitation Number W9128F25RA018) for electrical work at Gavin's Point Powerhouse in Crofton, Nebraska. The pricing schedule includes five Contract Line Item Numbers (CLINs): two base items and three optional items. Base items cover replacing the Control Room Panel with DC, preferred AC, and 480V circuits, and "All Remaining Work". Optional items include AC/DC work, replacement of 10 AC Panels and 13 Lighting Transformers, and removing the Voltage Regulator and Inverter Bypass Transformer. The document specifies that prices must be entered for all items, with total amounts subject to government verification. The government may exercise options within 365 days of contract award, and the contract is restricted to small businesses with a size standard of $19M under NAICS code 238210.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN Description Quantity Unit

Measure Unit Price Amount

Replace the Control Room Panel including all: DC, preferred AC and 480V circuits.

1 Job $______________ $______________

0002 All Remaining Work 1 Job $______________ $______________

0003 Option 1: AC/DC 6 1 Job $______________ $______________

Option 2: Replacement of 10 AC Panels and 13 Lighting Transformers

1 Job $______________ $______________

Option 3: Remove the Voltage Regulator and the Inverter Bypass Transformer

1 Job $______________ $______________

NOTES:

SECTION 00 10 00

Pricing Schedule

See SECTION 00 21 00, INSTRUCTIONS, CONDITIONS, & NOTICES TO BIDDERS for evalua on of op ons.

The Government may exercise an option by written notice to the Contractor commencing from the date of contract award thru the date the contract is closed, unless otherwise specified herein.

Prices must be entered for all items of the schedule. Total amounts submi ed without prices being entered on individual items will be rejected. Addi ons will be subject to verification by the Government. In case of variation between the Job (lump sum) prices and the total amount, the lump sum prices will be considered the price submitted.

A modifica on to a proposal which provides for a single adjustment to the total amount submi ed, should state the applica on of the adjustment to each respective lump sum price affected. If the modification is not so apportioned, the single adjustment will be applied to Item Nos. 0001 thru 0002.

See SECTION 00 21 00, INSTRUCTIONS, CONDITIONS, & NOTICES TO BIDDERS for evalua on of op ons.

The Government may exercise an option by written notice to the Contractor within 365 days from the date of contract award, unless otherwise specified herein.

BASE ITEMS

OPTIONAL ITEMS

TOTAL BASE + OPTIONS (Items 0001 thru 0005)

SUB-TOTAL BASE (Items 0001 thru 0002)

SUB-TOTAL OPTIONS (Items 0003 thru 0005)