This document is a pricing schedule for a fiber optic replacement project at the Fort Collins Science Center Building C. The schedule outlines the new fiber runs required, including the locations, fiber types, and estimated distances. The scope of work includes installing new singlemode fiber from the DEMARC core fiber stack to various IDF rooms on the data center, 1st, 2nd, and 3rd floors, as well as a 1000-foot fiber run from Building C to the FabShop IT Closet. The pricing is provided for the labor to install the new fiber, as well as the materials required, such as adapter panels, enclosures, and connectors. The total labor and materials costs are provided. This pricing schedule is related to the federal contract opportunity solicitation number 140G0224Q0109 for Fiber Optic Replacement, issued by the Department of the Interior US Geological Survey Office of Acquisitions and Grants.
Other files for this federal contract opportunity
Other files attached to Fiber Optic Replacement, newest first.
File
Type
Posted
Sol_140G0224Q0109_Amd_0001.pdf
PDF
Jun 28, 2024
Combined_Synopsis_140G0224Q0109_0001_0001.pdf
PDF
Jun 28, 2024
Attachment_4_-_ISI_Fiber_Cable_Testing_Results.png
PNG image
May 20, 2024
Sol_140G0224Q0109.pdf
PDF
May 20, 2024
Attachment_5_-_BldgC_CommManhole_FacingFabShop.jpg
JPG image
May 20, 2024
Attachment_6_-_BldgC_CommManhole_FacingWest.jpg
JPG image
May 20, 2024
Attachment_7_-_FabShop_NetworkRoom_Conduit_and_Pull.jpg
JPG image
May 20, 2024
Attachment_8_-_FabShop_NetworkRoom_Conduit_and_Pull_2.jpg
JPG image
May 20, 2024
Attachment_10_-_Floor_Plans.pdf
PDF
May 20, 2024
Attachment_9_-_BldgC_CommManhole_ServiceAfrea.jpg
JPG image
May 20, 2024
Attachment_11_-Questions_and_Answers_-_Fiber.pdf
PDF
May 20, 2024
Attachment_3_-_BldgC_and_Bldg_F_Fiber_Run_Example.jpg
JPG image
May 20, 2024
Attachment_2-_BuildingF_FabShop_100331_CS12.pdf
PDF
May 20, 2024
Show all 13
On GovTribe
Work with this file on GovTribe
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
Text version
The file's text, extracted by GovTribe without its formatting.
Sheet1
New Fiber Runs - Fort Collins Science Center
Building C Fiber Runs
Building C Fiber Runs New Fiber From Location To Location Fiber Type Est. Distance in Ft.
Core Router Room 1105 1st Floor East Telecom Room 1021 3 channel (6-strand) OS2 Singlemode fiber 250
Core Router Room 1105 1st Floor West Telecom Room 1105 (Same Room as DMARC - on South side of room) 3 channel (6-strand) OS2 Singlemode fiber 75
Core Router Room 1105 2nd Floor East Telecom Room 2007 3 channel (6-strand) OS2 Singlemode fiber 300
Core Router Room 1105 2nd Floor West Telecom Room 2175 3 channel (6-strand) OS2 Singlemode fiber 125
Core Router Room 1105 3rd Floor East Telecom Room 3165 3 channel (6-strand) OS2 Singlemode fiber 350
Core Router Room 1105 3rd Floor West Telecom Room 3033 3 channel (6-strand) OS2 Singlemode fiber 175
Core Router Room 1105 Data Center Room 1111 3 channel (6-strand) OS2 Singlemode fiber 150
WORK Scope of Work: Description Price
Install new Fiber Install new singlemode fiber from DEMARC Core fiber stack to IDF rooms on data center, 1st, 2nd, and 3rd floor IDF $
7 Fiber Pulls Total of (7) new fiber pulls $
3 channel OS2 Each run will get a new 3 channel (6-strand) OS2 Singlemode fiber $
TOTAL $
MATERIALS Materials: Description Quantity Unit Price Total Price
LC Singlemode adapter panels Furnish and install (14) LC Singlemode adaptor panels 14 $ $
2 RU corning encslosure Furnish and install (1) 2RU Corning enclosure for Demarc rack CCH-02U 1 $ $
LC Connectors Splice, label and certify (84) total LC connectors (7 runs with 6 splices per side) 84 $ $
N/A - Try to reuse exisiting Try to reuse existing enclosures for field side 0 $ $
LC/LC 2-meter jump cables Furnish (14) LC/LC 2-meter fiber jumpers 14 $ $
TOTAL $ $
Building F Fiber Runs
Building F Fiber Run New Fiber From Location To Location Fiber Type Est. Distance in Ft.
Core Router Room 1105 FabShop IT Closet 3 channel (6-strand) OS2 Singlemode fiber 1000
WORK Scope of Work: Description Price
Install new Fiber Furnish and install approx. 1000' of IO 6-strand singlemode fiber from Building C MDF to Fab IT Closet - Run goes under parking lot $
LC Singlemode adapter panels Furnish and install (2) LC singlemode adaptor panels $
N/A - Try to reuse existing Try to reuse existing adaptor panel in Fab shop and land in new fiber enclosure in MDF of Bldg. C $
LC Connectors Fusion splice and certify (12) total LC singlemode connectors $
Cable will utilize existing conduit pathway from each building $
TOTAL $
MATERIALS Materials: Description Quantity Unit Price Total Price
LC Singlemode adapter panels Furnish and install (2) LC Singlemode adaptor panels
Reuse existing adaptor panel in Fab shop and land in new fiber enclosure in MDF of Bldg. C above 2 $ $
1000' run for Fab Shop Furnish and install approx. 1000' of IO 6-strand singlemode fiber from Building C MDF to Fab IT Closet 1 $ $
LC Connectors Fusion splice and certify (12) total LC singlemode connectors 12 $ $
N/A - Try to reuse exisiting Try to reuse existing enclosures for field side 0 $ $
TOTAL $ $
GRAND TOTALS:
(WORK)LABOR $
MATERIALS $
Basic Inclusions for Fiber Work
All work will be done in a professional manner and in accordance with the applicable codes and standards.
All wiring including terminations, hangers, and labels where required
All Travel Expenses and Coordination
Warranty of 1 year on terminations provided and workmanship
All cable and terminations are tested to industry standards
Includes all Taxes and shipping
All Installation labor and miscellaneous installation material (i.e. zip ties, Velcro, J-Hooks)