Attachment 1_ Price Schedule.xls

XLS spreadsheet 28 KB Posted

Attached to
USCG STRATTON FY25 FQ4 DS
Solicitation number
70Z08525QLREP0008
Issued by

About this file

The document is a Price Schedule for the USCGC STRATTON (WMSL-418) Dockside Availability in Fiscal Year 2025. The pricing schedule includes 13 specific maintenance and inspection tasks (D-001 through D-013), such as cleaning and inspecting various tanks, certifying system relief valves, performing maintenance on air conditioning and refrigeration plants, inspecting cargo handling equipment, and providing fire prevention services. The schedule also includes a composite labor rate for 1,802 hours and 5 laydays, with all line items currently priced at $0.00.

The associated federal contract opportunity is a United States Coast Guard solicitation (70Z08525QLREP0008) for dockside repairs on the USCGC STRATTON, a 418-foot National Security Cutter. The repair work will be performed at Coast Guard Island in Alameda, California, during Fiscal Year 2025, Quarter 4, with a specific performance period from September 3, 2025, to November 25, 2025. The contract requires a vendor to supply materials, equipment, and personnel to execute the dockside repairs in accordance with the attached Statement of Work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC STRATTON (WMSL-418) DOCKSIDE AVAILABILITY FY2025
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Tank (High Purity Water), Clean and InspectJOB1$0.00
D-002Tanks (Aviation Fuel Stowage and Overflow),Clean and InspectJOB1$0.00
D-003Tanks (MP Fuel Storage and Overflow), Clean and InspectJOB1$0.00
D-004Miscellaneous System Relief Valves, 5 Year CertificationJOB1$0.00
D-005Air Conditioning Plants, GroomJOB1$0.00
D-006Refrigeration Plant, System GroomJOB1$0.00
D-007Anchor Windlass Level 2, Inspect and RepairJOB1$0.00
D-008Cargo Handling Elevator, Annual Inspection and Test, PerformJOB1$0.00
D-009Folding Boom Cranes, Biennial Maintenance,JOB1$0.00
D-010Incinerator, Inspect and TestJOB1$0.00
D-011Oily Water Separator (OWS) System, Inspect and GroomJOB1$0.00
D-012Bilges, Preserve (Partial)JOB1$0.00
D-013Fire prevention, ProvideJOB1$0.00
O-00AComposite Labor RateHour1802$0.00
O-00ZLaydaysDay5$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

&C(1/22/2025) Draft-0 - Page &P of &N

File details come from the government source that posted it. Updated .