Attachment 1 Price Schedule.pdf

PDF 185 KB Posted

Attached to
HVAC Maintenance for Six USDA LMR System Shelter Sites in South Texas
Solicitation number
12639526Q0061
Issued by

About this file

This is a Price Schedule for RFQ 12639526Q0061, soliciting HVAC maintenance services for six USDA LMR System Shelter Sites in South Texas. The contract will be a combined firm-fixed-price and time-and-materials vehicle with a base year plus two option years.

The solicitation covers six shelter locations: San Pedro, Posito Hondo, Blue Town, Havana Vat, La Joya Farms, and Quemado VAT LMRS Shelters. For each site and contract period, contractors must provide annual inspections, mid-season inspections, written reports following each inspection or emergency repair, and hourly labor rates for emergency repairs (estimated at 8 hours per site per year for evaluation purposes only). Annual, semi-annual, and report line items are priced on a firm-fixed-price basis per FAR 52.212-4. Emergency repair hourly labor rates are for evaluation purposes only and will be paid on a time-and-materials basis per FAR 52.212-4 Alt 1, consisting of direct labor at a single blended fully-burdened hourly rate including wages, overhead, general and administrative expenses, and profit, plus actual material costs. The hours listed are explicitly noted as evaluation purposes only and do not represent minimum or maximum quantities the Government will order. The price schedule provides blank line items for contractors to enter unit prices and amounts across the base year and two option years.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ 12639526Q0061-HVAC Maintenance for Six USDA LMR System Shelter Sites in South Texas Attachment 1

PRICE SCHEDULE

This solicitation will result in a combined firm-fixed price and time-and-materials contract.

a. The line items established for annual, semi-annual, and reports will be paid on a firm-fixed-price basis in accordance with FAR 52.212-4.

b. The line items labeled Hourly labor rate for emergency repairs are for evaluation purposes only and will be paid on a time-and-materials basis in accordance with FAR 52.212-4 Alt 1:

(1) Direct labor hours at a single blended hourly rate (fully burdened) that include wages, overhead, general and administrative expenses, and profit; and

(2) Actual cost for materials (except as provided for in FAR 31.205-26(e) and (f)).

c. The hours listed are for evaluation purposes only and are not intended to convey the minimum or maximum quantity that will be ordered by the Government. See clause 452.216-74, Ceiling Price.

Base Year

Unit Item Description Qty Unit Price Amount

0001 San Pedro LMRS Shelter

0001AA Annual inspection 1 EA ____________ ____________ in accordance with paragraph 4.3.1 of the SOW

0001AB Mid-season inspection 1 EA ____________ ____________ in accordance with paragraph 4.3.2

0001AC Written report following 1 EA ____________ ____________ each inspection or emergency repair

0001AD Hourly labor rate 8 HR ____________ ____________ for emergency repairs

0002 Posito Hondo LMRS Shelter

0002AA Annual inspection 1 EA ____________ ____________ in accordance with

RFQ 12639526Q0061-HVAC Maintenance for Six USDA LMR System Shelter Sites in South Texas Attachment 1

0002AB Mid-season inspection 1 EA ____________ ____________

0002AC Written report following 1 EA ____________ ____________

0002AD Hourly labor rate 8 HR ____________ ____________

0003 Blue Town LMRS Shelter

0003AA Annual inspection 1 EA ____________ ____________ in accordance with

0003AB Mid-season inspection 1 EA ____________ ____________

0003AC Written report following 1 EA ____________ ____________

0003AD Hourly labor rate 8 HR ____________ ____________

0004 Havana Vat LMRS Shelter

0004AA Annual inspection 1 EA ____________ ____________ in accordance with paragraph 4.3.1 of the SOW

0004AB Mid-season inspection 1 EA ____________ ____________ in accordance with

0004AC Written report following 1 EA ____________ ____________

0004AD Hourly labor rate 8 HR ____________ ____________

RFQ 12639526Q0061-HVAC Maintenance for Six USDA LMR System Shelter Sites in South Texas Attachment 1

0005 La Joya Farms LMRS Shelter

0005AA Annual inspection 1 EA ____________ ____________ in accordance with paragraph 4.3.1 of the SOW

0005AB Mid-season inspection 1 EA ____________ ____________ in accordance with

0005AC Written report following 1 EA ____________ ____________

0005AD Hourly labor rate 8 HR ____________ ____________

0006 Quemado VAT LMRS Shelter

0006AA Annual inspection 1 EA ____________ ____________ in accordance with

0006AB Mid-season inspection 1 EA ____________ ____________

0006AC Written report following 1 EA ____________ ____________

0006AD Hourly labor rate 8 HR ____________ ____________

Option Year 1

Unit Item Description Qty Unit Price Amount

1001 San Pedro LMRS Shelter

1001AA Annual inspection 1 EA ____________ ____________

RFQ 12639526Q0061-HVAC Maintenance for Six USDA LMR System Shelter Sites in South Texas Attachment 1

1001AB Mid-season inspection 1 EA ____________ ____________ in accordance with

1001AC Written report following 1 EA ____________ ____________

1001AD Hourly labor rate 8 HR ____________ ____________

1002 Posito Hondo LMRS Shelter

1002AA Annual inspection 1 EA ____________ ____________ in accordance with

1002AB Mid-season inspection 1 EA ____________ ____________

1002AC Written report following 1 EA ____________ ____________

1002AD Hourly labor rate 8 HR ____________ ____________

1003 Blue Town LMRS Shelter

1003AA Annual inspection 1 EA ____________ ____________ in accordance with

1003AB Mid-season inspection 1 EA ____________ ____________

1003AC Written report following 1 EA ____________ ____________

RFQ 12639526Q0061-HVAC Maintenance for Six USDA LMR System Shelter Sites in South Texas Attachment 1

1003AD Hourly labor rate 8 HR ____________ ____________

1004 Havana Vat LMRS Shelter

1004AA Annual inspection 1 EA ____________ ____________ in accordance with

1004AB Mid-season inspection 1 EA ____________ ____________

1004AC Written report following 1 EA ____________ ____________

1004AD Hourly labor rate 8 HR ____________ ____________

1005 La Joya Farms LMRS Shelter

1005AA Annual inspection 1 EA ____________ ____________ in accordance with

1005AB Mid-season inspection 1 EA ____________ ____________

1005AC Written report following 1 EA ____________ ____________

1005AD Hourly labor rate 8 HR ____________ ____________

1006 Quemado VAT LMRS Shelter

1006AA Annual inspection 1 EA ____________ ____________ in accordance with

RFQ 12639526Q0061-HVAC Maintenance for Six USDA LMR System Shelter Sites in South Texas Attachment 1

1006AB Mid-season inspection 1 EA ____________ ____________

1006AC Written report following 1 EA ____________ ____________

1006AD Hourly labor rate 8 HR ____________ ____________

Option Year 2

Unit Item Description Qty Unit Price Amount

2001 San Pedro LMRS Shelter

2001AA Annual inspection 1 EA ____________ ____________ in accordance with paragraph 4.3.1 of the SOW

2001AB Mid-season inspection 1 EA ____________ ____________ in accordance with

2001AC Written report following 1 EA ____________ ____________

2001AD Hourly labor rate 8 HR ____________ ____________

2002 Posito Hondo LMRS Shelter

2002AA Annual inspection 1 EA ____________ ____________ in accordance with

2002AB Mid-season inspection 1 EA ____________ ____________

2002AC Written report following 1 EA ____________ ____________

RFQ 12639526Q0061-HVAC Maintenance for Six USDA LMR System Shelter Sites in South Texas Attachment 1

2002AD Hourly labor rate 8 HR ____________ ____________ for emergency repairs

2003 Blue Town LMRS Shelter

2003AA Annual inspection 1 EA ____________ ____________ in accordance with

2003AB Mid-season inspection 1 EA ____________ ____________

2003AC Written report following 1 EA ____________ ____________

2003AD Hourly labor rate 8 HR ____________ ____________

2004 Havana Vat LMRS Shelter

2004AA Annual inspection 1 EA ____________ ____________ in accordance with

2004AB Mid-season inspection 1 EA ____________ ____________ paragraph 4.3.2 of the SOW

2004AC Written report following 1 EA ____________ ____________

2004AD Hourly labor rate 8 HR ____________ ____________

2005 La Joya Farms LMRS Shelter

2005AA Annual inspection 1 EA ____________ ____________ in accordance with

RFQ 12639526Q0061-HVAC Maintenance for Six USDA LMR System Shelter Sites in South Texas Attachment 1

2005AB Mid-season inspection 1 EA ____________ ____________

2005AC Written report following 1 EA ____________ ____________

2005AD Hourly labor rate 8 HR ____________ ____________

2006 Quemado VAT LMRS Shelter

2006AA Annual inspection 1 EA ____________ ____________ in accordance with

2006AB Mid-season inspection 1 EA ____________ ____________

2006AC Written report following 1 EA ____________ ____________

2006AD Hourly labor rate 8 HR ____________ ____________

File details come from the government source that posted it. Updated .