Attachment 1 Price Attachment.pdf

PDF 314 KB Posted

Attached to
Fort Peck Recreation Area Mowing and Trimming
Solicitation number
W9128F26PA041
Issued by

About this file

This is a Price Schedule for mowing and trimming services at Ft. Peck Recreation Area, issued by the US Army Corps of Engineers. The contract spans a five-year period from May 1, 2026, through April 30, 2031, consisting of one base year and four option years. Each contract year includes an active performance period from May 1 through November 30, and an inactive period from December 1 through April 30 during which the contractor is not required to perform services.

The scope of work encompasses mowing and trimming services across 19 separately identified tracts within the recreation area, including facilities such as the Interpretive Center, Downstream Campground, Kiwanis Park, various dredge swim beaches, and multiple points and overlooks. Pricing is fixed per mowing/trimming event for each tract, with the number of services ranging from three to six per year depending on the tract. The cost per service varies by tract from $100 to $3,750. The total annual cost for all services remains constant at $65,150 for the base year and each option year. Detailed pricing tables are provided for each contract year (2026–2030), specifying the number of mowings/trimmings, bid cost per event, and total year cost for each of the 19 tracts.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

FT. PECK RECREATION AREA MOWING/TRIMMING

US ARMY CORPS OF ENGINEERS

Base Year: 01 May 2026 through 30 April 2027

• Active period of performance: 01 May 2026 through November 2026

• Inactive period of performance: 01 December 2026 through 30 April 2027

*Note: The Contractor is not required to perform any services during the inactive period of performance.

Please fill out each tract cost the total cost for the season (Number of Trimmings X Cost) and the sum total of the seasons mowing and trimming.

Tract Name Number of

Mowings/Trimmings

Bid Cost Per

Mowing/Trimming

Total Year Cost

Tract 1: I n t e r p r e t i v e C e n t e r 6 $650 $3,900

Tract 2: Downstream Campground 6 $3,750 $22,500

Tract 3: Kiwanis Park 6 $2,200 $13,200

Tract 4: Beaver Creek Nature Trail 5 $450 $2,250

Tract 5: Floodplain 5 $350 $1,750

Tract 6: 1st Dredge Swim Beach 5 $550 $2,750

Tract 7: Roundhouse Point 5 $450 $2,250

Tract 8: Boy Scout Park 3 $100 $300

Tract 9: Second Dredge North 3 $125 $375

Tract 10: Nelson Dredge 3 $150 $450

Tract 11: Flat Lake 4 $250 $1,000

Tract 12: Lewis & Clark Overlook 4 $200 $800

Tract 13: Rifle Range 3 $325 $975

Tract 14: Boomtown 5 $700 $3,500

Tract 15: Information Booth 3 $150 $450

Tract 16: Perch Point Recreation Area 4 $600 $2,400

Tract 17: West End Tent and Trailer 5 $800 $4,000

Tract 18: Duck Creek 4 $500 $2,000

Tract 19: Wildlife Pasture 3 $100 $300

2026 Total: $65,150

Option Year 1: 01 May 2027 through 30 April 2028

• Active period of performance: 01 May 2027 through November 2027

• Inactive period of performance: 01 December 2027 through 30 April 2028

Bid Cost Per

Mowing/Trimming

Total Year Cost

Tract 1: I n t e r p r e t i v e C e n t e r 6 $650 $3,900

Tract 2: Downstream Campground 6 $3,750 $22,500

Tract 3: Kiwanis Park 6 $2,200 $13,200

Tract 4: Beaver Creek Nature Trail 5 $450 $2,250

Tract 5: Floodplain 5 $350 $1,750

Tract 6: 1st Dredge Swim Beach 5 $550 $2,750

Tract 7: Roundhouse Point 5 $450 $2,250

Tract 8: Boy Scout Park 3 $100 $300

Tract 9: Second Dredge North 3 $125 $375

Tract 10: Nelson Dredge 3 $150 $450

Tract 11: Flat Lake 4 $250 $1,000

Tract 12: Lewis & Clark Overlook 4 $200 $800

Tract 13: Rifle Range 3 $325 $975

Tract 14: Boomtown 5 $700 $3,500

Tract 15: Information Booth 3 $150 $450

Tract 16: Perch Point Recreation Area 4 $600 $2,400

Tract 17: West End Tent and Trailer 5 $800 $4,000

Tract 18: Duck Creek 4 $500 $2,000

2027 Total: $65,150

Option Year 2: 01 May 2028 through 30 April 2029

• Active period of performance: 01 May 2028 through November 2028

• Inactive period of performance: 01 December 2028 through 30 April 2029

Bid Cost Per

Mowing/Trimming

Total Year Cost

Tract 1: I n t e r p r e t i v e C e n t e r 6 $650 $3,900

Tract 2: Downstream Campground 6 $3,750 $22,500

Tract 3: Kiwanis Park 6 $2,200 $13,200

Tract 4: Beaver Creek Nature Trail 5 $450 $2,250

Tract 5: Floodplain 5 $350 $1,750

Tract 6: 1st Dredge Swim Beach 5 $550 $2,750

Tract 7: Roundhouse Point 5 $450 $2,250

Tract 8: Boy Scout Park 3 $100 $300

Tract 9: Second Dredge North 3 $125 $375

Tract 10: Nelson Dredge 3 $150 $450

Tract 11: Flat Lake 4 $250 $1,000

Tract 12: Lewis & Clark Overlook 4 $200 $800

Tract 13: Rifle Range 3 $325 $975

Tract 14: Boomtown 5 $700 $3,500

Tract 15: Information Booth 3 $150 $450

Tract 16: Perch Point Recreation Area 4 $600 $2,400

Tract 17: West End Tent and Trailer 5 $800 $4,000

Tract 18: Duck Creek 4 $500 $2,000

2028 Total: $65,150

Option Year 3: 01 May 2029 through 30 April 2030

• Active period of performance: 01 May 2029 through November 2029

• Inactive period of performance: 01 December 2029 through 30 April 2030

Bid Cost Per

Mowing/Trimming

Total Year Cost

Tract 1: I n t e r p r e t i v e C e n t e r 6 $650 $3,900

Tract 2: Downstream Campground 6 $3,750 $22,500

Tract 3: Kiwanis Park 6 $2,200 $13,200

Tract 4: Beaver Creek Nature Trail 5 $450 $2,250

Tract 5: Floodplain 5 $350 $1,750

Tract 6: 1st Dredge Swim Beach 5 $550 $2,750

Tract 7: Roundhouse Point 5 $450 $2,250

Tract 8: Boy Scout Park 3 $100 $300

Tract 9: Second Dredge North 3 $125 $375

Tract 10: Nelson Dredge 3 $150 $450

Tract 11: Flat Lake 4 $250 $1,000

Tract 12: Lewis & Clark Overlook 4 $200 $800

Tract 13: Rifle Range 3 $325 $975

Tract 14: Boomtown 5 $700 $3,500

Tract 15: Information Booth 3 $150 $450

Tract 16: Perch Point Recreation Area 4 $600 $2,400

Tract 17: West End Tent and Trailer 5 $800 $4,000

Tract 18: Duck Creek 4 $500 $2,000

2029 Total: $65,150

Option 4: 01 May 2030 through 30 April 2031

• Active period of performance: 01 May 2030 through November 2030

• Inactive period of performance: 01 December 2030 through 30 April 2031

Bid Cost Per

Mowing/Trimming

Total Year Cost

Tract 1: I n t e r p r e t i v e C e n t e r 6 $650 $3,900

Tract 2: Downstream Campground 6 $3,750 $22,500

Tract 3: Kiwanis Park 6 $2,200 $13,200

Tract 4: Beaver Creek Nature Trail 5 $450 $2,250

Tract 5: Floodplain 5 $350 $1,750

Tract 6: 1st Dredge Swim Beach 5 $550 $2,750

Tract 7: Roundhouse Point 5 $450 $2,250

Tract 8: Boy Scout Park 3 $100 $300

Tract 9: Second Dredge North 3 $125 $375

Tract 10: Nelson Dredge 3 $150 $450

Tract 11: Flat Lake 4 $250 $1,000

Tract 12: Lewis & Clark Overlook 4 $200 $800

Tract 13: Rifle Range 3 $325 $975

Tract 14: Boomtown 5 $700 $3,500

Tract 15: Information Booth 3 $150 $450

Tract 16: Perch Point Recreation Area 4 $600 $2,400

Tract 17: West End Tent and Trailer 5 $800 $4,000

Tract 18: Duck Creek 4 $500 $2,000

2030 Total: $65,150

File details come from the government source that posted it. Updated .