Attachment 1 PMC SOW Renovation.pdf

PDF 22 MB Posted

Attached to
Architectural Historian-Work Plan and Cultural/Historic Resources Technical Report
Solicitation number
12FPC326Q0017
Issued by

About this file

This is a Statement of Work (SOW) for cultural and historic resources assessment services related to proposed upgrades at the NRCS Plant Materials Center (PMC) in Lockeford, California. The contractor will prepare a Work Plan and Cultural/Historic Resources Technical Report to support the NRCS's environmental review under the National Environmental Policy Act (NEPA) and findings of effect under Section 106 of the National Historic Preservation Act (NHPA). The proposed action involves renovating a 1,000 square foot training and conference space within an existing seed building on a 106-acre federally owned facility. The contractor must identify and evaluate potential impacts to historic properties within the Area of Potential Effects (APE).

Deliverables include a Work Plan describing Alternative 1 (the proposed renovation including construction of four parking lots, concrete walkway, sewer line modifications, and septic system installation), a recommended APE boundary, and a research design for field studies. The contractor must conduct records research at the California Historical Resources Information Center (CHRIS) and complete an intensive pedestrian cultural resources inventory of the APE. The final technical report must provide National Register of Historic Places (NRHP) eligibility recommendations for identified resources and analysis of potential adverse effects per 36 CFR § 800.5. The contract is firm-fixed-price with an estimated 90-day performance period: fieldwork must begin within 30 days of contract award, with draft reports due 45 days after fieldwork completion and final reports due 15 days after NRCS comments. Partial payment is structured at 50% following fieldwork, 25% upon draft report submission, and 25% upon final deliverable acceptance. The contractor must meet Secretary of Interior professional qualification standards and ensure all identified documentation and GIS shapefiles are submitted in searchable digital formats. Contact information for technical questions is provided: Christopher Null at christopher.null@usda.gov.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Assistance with Effect Determinations for the California Plant Materials Center’s Proposed Upgrades

Part I: General Information

It is the mission of the Natural Resources Conservation Service (NRCS) to provide leadership in a partnership effort to help people conserve, maintain, and improve our nation’s natural resources and environment. The NRCS Plant Materials Center (PMC), a 106-acre working facility in Lockeford, assists with this mission by conducting studies, demonstrating Agency conservation practices, and providing a centrally located training location. The PMC is federally owned and has been in operation for over 50 years

A. Introduction/Background

The NRCS is soliciting quotes from Contractors for the completion of an impact assessment for proposed upgrades to the PMC. These upgrades would in part repurpose a currently underutilized storage area into a 1000 square foot training and conference space. This work constitutes a Proposed Action under the National Environmental Policy Act (NEPA) and an Undertaking under National Historic Preservation Act (NHPA). Therefore, a review for potential impacts to historic properties per Section 106 of the NHPA (Section 106) within the area of potential effects (APE) is necessary before approval of the project.

B. Scope

Contractor will prepare a Work Plan and Cultural/Historic Resources Technical Report. The deliverables for this Task must support the NRCS’s environmental review per NEPA and finding of effect per NHPA Section 106. The Contractor will submit (a.) a brief Work Plan to the NRCS for approval outlining planned studies of the Affected Environment/APE for Alternative 1 to identify cultural resources/historic properties that could be impacted by the Proposed Action. Once approval of the Work Plan is obtained, the Contractor will (b.) carry out the studies and (c.) submit a draft cultural/historic resources technical report to the NRCS for review. The draft technical report will be reviewed by the NRCS, and the final technical report will incorporate any comments or requests for revision provided by the NRCS. The draft and final technical reports must be suitable for supporting the NRCS’s consultation with the State Historic Preservation Officer (SHPO), Tribal Historic Preservation Officers (THPO), and Native American tribes pursuant to Section 106 and will be appended to the Environmental Evaluation. The NRCS will provide appropriate information to the Contractor regarding consultation with the SHPO/ THPO and Native American tribes.

a. Work Plan:

i. Includes a thorough description of the Alternative 1 to include the anticipated the extent of ground disturbances (including borrow sites) or modifications/demolitions of buildings/structures.

ii. Describes and illustrates a recommended area of potential effects (APE) for the Affected Environment of Alternative 1, and a research design for studies to identify cultural resources/historic properties including field surveys and background research.

iii. Must be approved by the NRCS prior to scheduling or conducting any field work so that requests from tribal consulting partners can be considered and/or accommodated.

b. Field Study Effort:

i. Prior to commencing the pedestrian inventory, Contractors will complete a review of records for information for the task order regarding previous cultural resources inventories and previously recorded cultural resource sites.

ii. Contractors will complete an intensive pedestrian cultural resources inventory of the indicated APE to identify historic properties that may be adversely affected as a result of the proposed undertaking.

c. Draft and Final Technical Reports:

i. Include information contained in the Work Plan regarding the Affected Environment/

APE and the research design for field studies/background research

ii. Include results of a records search conducted at the appropriate California Historical

Resources Information Center (CHRIS) addressing the Affected Environment/APE for Alternative 1. The CHRIS results must tabulate resource descriptions, state resource numbers, and the known or recommended National Register of Historic Places (NRHP) eligibility status of each.

iii. Include appropriate background research including results of historical map research and literature review relevant to the Affected Environment/APE for Alternative 1.

iv. Include the results of surveys of the Affected Environment/APE for Alternative 1. The results must provide a recommended NRHP eligibility determination for any cultural/historic resources that could be impacted by the Proposed Action pursuant to 36 CFR § 60.4, and provide a clear and succinct analysis of how such resources could be affected pursuant to the criteria of effect at 36 CFR § 800.5. Note that appropriate expertise is required by NHPA Sections 106 and 112 to provide NRHP evaluation recommendations based on the type of resources. This would include, but is not limited to, recommendations regarding the built environment.

v. Contain appropriate documentation of identified archaeological and historical resources.

C. Applicable Documents

Procedures for complying with the aforementioned mandates are outlined in the following references:

• Section 106 of the National Historic Preservation Act (NHPA), as amended

• 36 CFR 800; Protection of Historic Properties

• Archaeology and Historic Preservation: Secretary of Interior’s Standards and Guidelines

• National Environmental Policy Act of 1969

• Native American Graves Protection and Repatriation Act of 1990

• Archaeological Resources Protection Act of 1979

• NRCS National Cultural Resources Procedures Handbook Title 190, Part 601 (amended Oct.

2018)

• NRCS National Environmental Compliance Handbook Title 190, Part 610 (amended May 2016)

Guidelines is available from the following National Park Service website:

http://www.cr.nps.gov/linklaws.htm. The NRCS documents may be obtained from the NRCS eDirectives website: https://directives.sc.egov.usda.gov/directive/22.

Part II: Work Requirements

Contractors shall provide sufficient information for the project to enable the NRCS to remain in compliance with Federal cultural resources laws for the completion of these undertakings. Contractors shall warrant that the provided cultural resources services will comply with all applicable Federal, State, and local laws and requirements, and shall be consistent with NRCS cultural resources program goals and objectives. All work must be performed in accordance with the “Secretary of Interior’s Standards and Guidelines for Archaeology and Historic Preservation”. The NRCS retains the responsibility for all decision-making and consultation required of Federal agencies related to compliance with cultural resources protection laws and regulations. Contractors must meet the Secretary of Interior’s professional standards as specified in Section 112(a)(1)(A) of the NHPA and in the implementing regulations for Section 106 of the NHPA at 36 CFR 800.2(a)(1) and 36 CFR 800.2(a)(3). Contractors shall be used in accordance with 36 CFR 800.2(a)(3) (“Use of Contractors”). The Contractor shall furnish all labor, equipment, supervision, materials and incidentals necessary to perform archaeological and historical surveying, recording, mapping, evaluations, and reporting. The Contractor shall also furnish a qualified Principal Investigator and field directors/crew chiefs in accordance with 36 CFR 61.5. The Contractor shall ensure that all approvals, authorities, rights, permits, and easements necessary for conducting the cultural resources survey on Federal lands have been obtained prior to initiating fieldwork.

Part III. Technical Requirements

A. Pre-Field Work Requirements

Prior to fieldwork, the Contractor will receive Geographic Information System (GIS) shapefiles from the NRCS for the task order that will delineate the area needing survey. Upon receipt of the data, the Contractor shall complete a records review to identify previously recorded cultural resources and determine the nature of previous archaeological research in the vicinity of the APE. The literature review will primarily focus on records in the California Historical Resources Information System (CHRIS) maintained by the California Office of Historic Preservation (OHP), but should also include the NRHP online database, General Land Office (GLO) plat maps, and other sources and data repositories, as necessary and where appropriate. For the purposes of this Statement of Work, the literature review will be limited to cultural resources identified within a half of a mile of the APE boundary. Before beginning fieldwork, the Contractor will coordinate with the Manager of the Lockeford Plant Materials Center (Margaret Smither-Kopperl, Ph. D.) for the field study.

B. Pedestrian Inventory Requirements

The purpose of this contract is to collect appropriate information about cultural resources within the Project Assignment’s APE including CHRIS records searches, conduct a survey of the APE, and report the findings to the State Archaeologist. The Contractor will coordinate field work with the Manager of the Lockeford Plant Materials Center (Margaret Smither-Kopperl, Ph. D.) to access the property and the APE. Contractor is expected observe industry-standard safety precautions in accessing and surveying the property. Contractor agrees that information collected during field work, including photographs and data about cultural resources is confidential and may not be shared with outside sources unless authorized by the NRCS CA. All documentation resulting from field work is the property of the NRCS CA.

Field survey methods/sampling strategies will be at the awardee’s discretion but justified based on site probability/prevalence and supported in submitted reports. It is expected that survey methods will vary from Reconnaissance level for low probably areas to Intensive for high probably/known site locations;

transect interval would adjust accordingly. When cultural resources are encountered, efforts to establish site extent and integrity will be attempted if it appears the location is indicative of a Historic Property.

The contractor will meet the Secretary of the Interior Guidelines for professional Qualifications Standards as listed in the Federal Register, Volume 48, Number 190, Thursday, September 29, 1983 for archaeologist and architectural historian. All survey crews will have direct supervision in the field by a person meeting those standards.

C. Cultural Resources Documentation Requirements

The Contractor will complete the following fieldwork tasks:

• Collect information regarding prior survey and known cultural resources within and near the APE including, but not limited to, a CHRIS records search;

• Conduct a field survey of the APE utilizing a sampling method appropriate for APE site prevalence and/or probability;

• Take photographs of the APE and the areas surveyed;

• Collect GPS data (UTMS per NAD 83) and photographs of areas that were surveyed, as well as areas was survey was obstructed or otherwise limited;

• Complete the appropriate OHP DPR 523 forms pursuant to NRCS CA Survey Guidelines for all cultural resources encountered in the APE.

• Cite appropriate bibliographic information for sources that were consulted regarding the nature and significance of cultural resources recorded within the APE.

• Submit a draft Survey Report, including map(s) and photographs, in Word format via email to the State Archaeologist or designee. Contractor agrees to provide timely clarifications or corrections, if needed. A revised draft submittal will not be necessary unless extensive clarifications or corrections are needed as determined by the State Archaeologist or designee.

D. Evaluation Criteria

AR provision 52.212-2, Evaluation-Commercial Items applies to this solicitation as follows.

• The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The Government will conduct a tradeoff process to determine the offeror whose proposal represents the best value to the Government. Please see the attached “Proposal Evaluation Criteria” for more details. The following evaluation factors will be used to evaluate offers and are listed in descending order of importance: minimum requirements, technical evaluation, capacity to accomplish the work and past performance, and price.

E. Period of Performance and Payment

The Contractor shall deliver a draft and a final professional survey report, and all site documentation as outlined above. The estimated period of performance for this contract is 90 days. The following performance schedule shall be used as a guideline:

• Fieldwork shall begin on the first task order within 30 days from award of contract. The Contractor shall notify the NRCS POC when the fieldwork is each task order is scheduled and when the fieldwork has been completed.

• A draft report and site forms (if applicable) shall be submitted to the POC for comment no later than 45 days after completion of fieldwork per task order.

• The final report and site forms will be submitted to the POC no later than 15 days after receiving comments from the NRCS.

• Upon approval of the final report, NRCS will submit the final report and site forms to the SHPO for review and concurrence.

• Exceptions for delays due to weather will be allowed, though work must be accomplished as soon as the weather allows. The Contractor shall immediately notify the CO and POC if exceptions to the schedule or specified tasks are required.

The Contractor shall submit payment request via the Invoice Processing Platform (IPP).

Partial payment may be submitted following completion of fieldwork (50%), submission of draft report (25%) and upon NRCS receipt, approval, and acceptance of final deliverables (25%).

Part IV: Supporting Information

A. Confidentiality

Information generated from cultural resource surveys completed on behalf of the NRCS is classified as CONFIDENTIAL. Its distribution and use are restricted. Publication or disclosure of any part of this information is prohibited without the written permission of the NRCS.

B. Place of Performance

As stated previously, the Task Order consists of the work detailed above in the location(s) outlined in Appendix A.

C. Software and Communication

The contractor is expected to submit digital copies of all deliverables (draft and final) in the latest versions of Microsoft Word and Adobe Acrobat. The documents shall be provided in a format that is searchable. Original electronic copies shall be provided when feasible and not scanned versions of documents. Any maps created will have the pertinent information (latitude, longitude, date created, North arrow and scale provided in a clear and legible font size). GIS shapefiles will be provided along with the relevant deliverables of any boundaries or figures depicted in the APE maps that were created as part of the deliverable process.

The contractor shall communicate by email, phone and Microsoft Teams with NRCS employees regarding this contract.

D. Special Considerations

The Contractor must advise the NRCS if there are any access restrictions which could delay the work.

NRCS will work with the Contractor to resolve any access issues.

Technical cultural resource questions should be directed to the POC, Chistopher Null, at christopher.null@usda.gov. Contracting questions should be directed to the assigned Contracting Officer.

Changes to task order content, analysis approach, level of effort, schedules and deliverables shall be made in writing by a revision to the task order by the Contracting Officer. These changes must receive written approval from the Contracting Officer before the additional work is commenced. Camping on the project properties will not be allowed.

This is a firm-fixed-price contract.

Appendix A – Additional Information

Alternative 1 The PMC Renovation alternative includes a complete interior renovation of the existing seed building, construction of 4 new parking lots, concrete walkway, abandonment of existing sewer line, installation of 240 feet on new sewer line, installation of a new 2500-gallon septic system and 450 linear feet of leach pipe. There are other accompanying infrastructure and signage that will be installed to support this work along with minor temporary construction impacts.

Direct Impact Area The Area of Potential Effects for this proposed action is to be drafted with the assistance of the selected contractor (see SOW). The Direct Impact Area can be seen on the Construction Plans and is generally an area of approximately 3.38 acres. Alternative 1 includes a complete interior renovation of the existing seed building, construction of 4 new parking lots, concrete walkway, abandonment of existing sewer line, installation of 240 feet on new sewer line, installation of a new 2500-gallon septic system and 450 linear feet of leach pipe. There are other accompanying infrastructure and signage that will be installed to support this work along with minor temporary construction impacts.

Maps The exact construction details are in the 100% Construction Plans for this project. A generalized overview of the project area of impacts are included in Figure 1. The approximates limits of disturbance associated with this alternative are included in Figure 2.

A layer package with the relevant geospatial information that is displayed below is included in this package of information and is titled “Alternative 1.lpkx”. If there are any discrepancies between the figures and referenced geospatial information included in this appendix and the 100% Construction Plans, then the 100% Construction Plans are the correct source information to utilize.

Figure 1 Approximate location of impacts

Figure 2 Approximate limits of disturbance

Construction Plans 100% Drawings are available for Alternative 1. These drawings are located in the file titled

2024.07.22 NRCS Lockeford Seed Building – 100% Drawings.

PMC Manager Contact Info Margaret Smither-Kopperl. Ph. D.

Manager – Lockeford Plant Materials Center margaret.smither-kopperl@usda.gov mailto:margaret.smither-kopperl@usda.gov

SHEET INDEX

SHEET NUMBER SHEET NAME

GENERAL

G-001 COVER SHEET

CIVIL

C-001 CIVIL COVER

C-100 CIVIL SITE PLAN

C-101 SEPTIC DESIGN

C-200 GRADING PLAN

C-300 EROSION CONTROL PLAN

C-301 EROSION CONTROL DETAILS

C-400 SPECIFICATIONS

C-500 CIVIL DETAILS

LIFE SAFETY

LS101 CODE SUMMARY

LS102 FIRST FLOOR LIFE SAFETY PLAN

ARCHITECTURAL

A-001 SYMBOLS & ABBREVIATIONS

A-101 FIRST FLOOR AND DEMOLITION PLANS

A-102 FIRST FLOOR CEILING AND ROOF PLAN

A-201 BUILDING ELEVATIONS

A-401 ENLARGED PLANS AND ELEVATIONS

A-501 PARTITION TYPES

A-601 DOOR SCHEDULE AND DETAILS

STRUCTURAL

S-001 GENERAL STRUCTURAL NOTES AND SPECIFICATIONS

S-201 DEMO AND EXISTING FLOOR PLAN, PROPOSED NEW FLOOR PLAN

S-202 ROOF FRAMING PLAN

S-301 TYPICAL DETAILS

S-401 TYPICAL LIGHT GAGE METAL DETAILS

MECHANICAL

M-001 GENERAL MECHANICAL NOTES

M-002 GENERAL MECHANICAL LEGENDS

M-101 MECHANICAL PLANS

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-701 MECHANICAL SCHEDULES

P-101 UNDERSLAB PLUMBING PLANS

P-102 PLUMBING PLANS

P-501 PLUMBING DETAILS

P-701 PLUMBING SCHEDULES

ELECTRICAL

E-001 ABBREVIATIONS, GENERAL SYMBOLS, AND SHEET INDEX

E-002 GENERAL NOTES

ED101 FIRST FLOOR DEMOLITION PLAN - LIGHTING

ED201 FIRST FLOOR DEMOLITION PLAN - POWER

ED301 FIRST FLOOR DEMOLITION PLAN - SYSTEMS

ED401 ENLARGED PLANS DEMOLITION

E-100 SITE PLAN - ELECTRICAL

E-101 FIRST FLOOR PLAN - LIGHTING

E-111 FIRST FLOOR PLAN - LIGHTING CONTROL

E-201 FIRST FLOOR PLAN - POWER

E-301 FIRST FLOOR PLAN - SYSTEMS

E-302 CONFERENCE ROOM AV DIAGRAM

E-401 ENLARGED PLANS

E-601 ONE-LINE

E-701 ELECTRICAL SCHEDULES

E-721 PANEL SCHEDULES

www.coffman.com

221 N. Wall Street, Suite 500

Spokane, WA 99201 ph 509.328.2994

SHEET OF

DATE

CHECKED

DRAWN

CEI PROJ. NO.

COFFMAN ENGINEERSC

A

B

C

D

54321

D

C

B

A

1 2 3 4 5

SHEET NO:

SHEET TITLE:

USDA NRCS LOCKEFORD

SEED BUILDING

21011 ELLIOT RD.

LOCKEFORD, CA 95237

/1

/2

:5

:0

P

M

7/22/2024

231226

G-001

COVER SHEET

100% CD

USDA NRCS LOCKEFORD SEED BUILDING

21011 ELLIOT RD.

LOCKEFORD,CA 95237

PROJECT LOCATION

AREA OF WORK

AREA MAP

VICINITY MAP

E

LLIO

TT R

D

REV DATE DESCRIPTION

ARCHITECTURAL:

KZF DESIGN

700 BROADWAY ST.

CINCINNATI, OH 45202

CONTACTS:

LYNN ZUCH

LYNN.ZUCH@KZF.COM

BOB SCHMITZ

BOB.SCHMITZ@KZF.COM

ENGINEERING:

COFFMAN ENGINEERS

221 N. WALL STREET

SPOKANE, WA 99201

CONTACTS:

CIVIL:

RAY BARRO

RAY.BARRO@COFFMAN.COM

LEXI BEEBE

LEXI.BEEBE@COFFMAN.COM

MECHANICAL:

TRACI HANEGAN

TRACI.HANEGAN@COFFMAN.COM

JENSEN RYE

JENSEN.RYE@COFFMAN.COM

ELECTRICAL:

MATTHEW VERHEUL

MATTHEW.VERHEUL@COFFMAN.COM

STRUCTURAL:

NIC RODRIGUEZ

NICOLAS.RODRIGUES@COFFMAN.COM

JEFFREY QUOCK

JEFFREY.QUOCK@COFFMAN.COM

FIRE PROTECTION:

TOM DEMASI

TOM.DEMASI@COFFMAN.COM

ESTIMATOR:

ISKANDER ASSOCIATES INC.

600 NORTH TUSTIN AVE. #130

SANTA ANA, CA 92660

ISKANDER ABDULLA

ISKANDER@ISKANDERINC.COM

SURVEYOR:

GUIDA SURVEYING, INC.

550 W. ALLUVIAL AVE., SUITE 109

FRESNO, CA 93711

CONSULTANT TEAM

SS SS

SS

SS

SS

SS

SS

NO

PA

RK

ING

SS

ELLIOTT ROAD

(E) SEED BUILDING

FFE = 72.25'

(E) SHOP

BUILDING

(E) GARAGE

(E)

GREEN

HOUSE

(E)

SHED

(E) SHED

(E) SHADE

STRUCTURE

(E) BUILDING

(E) PMC

BUILDING

REV DATE DESCRIPTION

CEI PROJ. NO.

DRAWN

CHECKED

DATE

SHEET OF

COFFMAN ENGINEERS INC.C

231226

7/22/2024

SHEET TITLE:

SHEET NO:

www.coffman.com ph 509.328.2994

10 N. Post Street, Suite 500 Spokane, WA 99201

USDA NRCS LOCKEFORD

SEED BUILDING

21011 ELLIOTT RD.

LOCKEFORD, CA 95237

100% CD

No. 68283

EXP. 9/30/25

C I V I L

STAT E OF CA L I FORN IA

RE

G

I S

TE

RED PROFESS I ONAL ENG

I NEER

RA

YMOND L . BARRO

LEGAL DESCRIPTION

PLAN NOTES:

1. REFER TO THE ARCHITECT'S PLANS FOR DETAILS REGARDING

THE BUILDING, WALLS, WALKWAYS, PAVING SURFACES,

DOWNSPOUTS & ROOF DRAIN LOCATIONS, AND PLANTINGS.

2. THE EXISTING BOUNDARY, TOPOGRAPHIC AND UTILITY

INFORMATION SHOWN IS BASED ON THE TOPOGRAPHIC SURVEY

TITLED "SURVEY DRAWING NAME" PREPARED BY SURVEYOR

COMPANY NAME, DATED XX/XX/XX. UTILITY INFORMATION MUST

BE FIELD VERIFIED BY CONTRACTOR PRIOR TO BEGINNING

CONSTRUCTION.

3. ALL EXISTING UTILITIES ARE NOT SHOWN ON THIS PLAN, REFER

TO ADDITIONAL CIVIL SHEETS FOR LOCATIONS OF WATER,

POWER, CABLE, PHONE AND GAS SERVICES AND MAIN LINES.

4. IF THERE ARE ANY DISCREPANCIES BETWEEN DIMENSIONS IN

DRAWING AND EXISTING CONDITIONS WHICH WILL AFFECT THE

WORK, THE CONTRACTOR SHALL BRING SUCH DISCREPANCIES

TO THE ATTENTION OF THE ENGINEER FOR ADJUSTMENT

BEFORE PROCEEDING WITH THE WORK. THE CONTRACTOR

SHALL BE RESPONSIBLE FOR VERIFYING ALL DIMENSIONS,

ELEVATIONS, AND LOCATIONS FOR SITE WORK PER THE PLANS

AND FOR THE COORDINATION OF ALL TRADES,

SUBCONTRACTORS, AND PERSONS ENGAGED.

5. TOTAL DISTURBED AREA FOR THE PROJECT IS XX,XXX SF.

DATUM

THE BEARINGS SHOWN HEREON ARE

BASED ON THE BEARING BETWEEN POINT

10000 AND POINT 10001, BEING

N49°18'16"W, AS DERIVED BY REAL TIME

NETWORK MEASUREMENT BASED UPON

THE CALIFORNIA COORDINATE SYSTEM

1983 (CCS83), ZONE III, NORTH AMERICAN

DATUM OF 1983 (NA2011, EPOCH 2011.00)

TOPOGRAPHIC SURVEY BY GUIDA

SURVEYING, INC. DATED 10/14/2021

ADDITIONAL TOPOGRAPHIC DATA BY

GUIDA SURVEYING, INC. DATED

NOVEMBER 2023.

BOUNDARY EXHIBIT BY GUIDA

SURVEYING, INC. DATED MAY 2024.

REFERENCES

BENCHMARKS

ELEVATIONS SHOWN HEREON ARE BASED

ON THE BENCH MARK L1106: BRASS DISK

LOCATED IN A MASSIVE STRUCTURE 1.55

MILES EAST ALONG THE STATE HIGHWAY

12 FROM THE LOCKEFORD POST OFFICE,

AT THE CROSSING OF A STEEL TOWER

POWER TRANSMISSION LINE, IN THE TOP

OF THE SOUTH CONCRETE FOUNDATION

FOR THE SOUTH LEG OF THE FIRST STEEL

TOWER NORTHWEST OF THE HIGHWAY, 47

FEET NORTHWEST OF THE CENTERLINE

OF THE HIGHWAY, 0.2 FEET SOUTH OF THE

SOUTH STEEL LEG, AND ABOVE LEVEL

WITH THE HIGHWAY.

ELEVATION (1986): 112.00

PUT LEGAL DESCRIPTION HERE (USUALLY

FOUND ON THE SURVEY DRAWING)

AB - AGGREGATE BASE

AC - ASPHALT CONCRETE

AD - AREA DRAIN

ASPH - ASPHALT

BC - BEGINNING OF CURVE

BLDG - BUILDING

BM - BENCH MARK

BOE - BOTTOM OF EXCAVATION

BW - BOTTOM OF WALL

CB - CATCH BASIN

C&G - CURB AND GUTTER

CL - CENTERLINE

CO - CLEANOUT

CONC - CONCRETE

COS - CITY OF SEATTLE

CW - CONCRETE WALK

CY - CUBIC YARD

DC - DROP CONNECTION

DEMO - DEMOLISH

DI - DROP INLET

DIP - DUCTILE IRON PIPE

DOM - DOMESTIC

DS - DOWNSPOUT

DWY - DRIVEWAY

E - EAST

EA - EACH

EC - END OF CURVE

ECD - ELECTRICAL CONDUIT

EL, ELEV - ELEVATION

ELEC - ELECTRICAL

EOP - EDGE OF PAVEMENT

EP - EDGE OF PAVEMENT

ESC - EROSION & SEDIMENT

CONTROL

ESMT - EASEMENT

EX, (E) - EXISTING

FC - FACE OF CURB

FF - FINISHED FLOOR

FFE - FINISHED FLOOR ELEVATION

FG - FINISHED GRADE

FH - FIRE HYDRANT

FL - FLOWLINE

FS - FINISHED SURFACE

FT - FEET

G - GAS

GB - GRADE BREAK

GM - GAS METER

GUY - GUY ANCHOR

GV - GAS VALVE

H - HORIZONTAL

HB - HOSE BIBB

HDPE- - HIGH DENSITY POLYETHYLENE

HH - HANDHOLE

HP - HIGH POINT

HYD - HYDRANT

ID - INSIDE DIAMETER

IE - INVERT ELEVATION

INL - INLET

INV - INVERT

JB - JUNCTION BOX

JT - JOINT TRENCH

LF - LINEAL FEET

LOC - LOCATION

LP - LOW POINT

LS - LANDSCAPING

MAX - MAXIMUM

MH - MANHOLE

MIN - MINIMUM

MON - MONUMENT

(N) - NEW

O.C. - ON CENTER

P - POWER

PERF - PERFORATED

PIV - POST INDICATOR VALVE

PL - PROPERTY LINE

PM - POWER METER

PP - POWER POLE

PSD - PUBLIC STORM DRAIN

PSS - PUBLIC SANITARY SEWER

POC - POINT OF CONNECTION

PVC - POLYVINYLCHLORIDE

PVMT - PAVEMENT

R - RADIUS

RIM - RIM ELEVATION

R/W - RIGHT-OF-WAY

S - SOUTH, SEWER, SLOPE

SAN - SANITARY

SD - STORM DRAIN

SHT - SHEET

SNS - STREET NAME SIGN

SQ - SQUARE

SS - SANITARY SEWER

SSCO - SANITARY SEWER CLEANOUT

SSMH - SANITARY SEWER MANHOLE

ST - STREET

STA - STATION

STD - STANDARDS

T - TELEPHONE

TBM - TEMPORARY BENCH MARK

TC -

TEL - TELEPHONE

TESC - TEMPORARY EROSION AND

SEDIMENTATION CONTROL

TD - TELEPHONE DUCT

TP - TOP OF PAVEMENT

TYP - TYPICAL

UP - UNDERGROUND POWER

V - VERTICAL

VB - VERTICAL BEND

W - WATER

WM - WATER METER

WS - WATER SERVICE

WV - WATER VALVE

YD - YARD DRAIN

ABBREVIATIONS

JT

P

G

FW

SS

SUB

DESCRIPTIONPROPOSED

LEGEND

SD

EXISTING

JT

P

G

FW

SS

SD

CENTERLINE

EASEMENT LINE

PROPERTY LINE

RETAINING WALL

SUBDRAIN LINE

STORM DRAIN LINE

SANITARY SEWER LINE

OVERHEAD ELECTRIC

WATER LINE

FIRE WATER

GAS LINE

PRESSURE LINE

JOINT TRENCH

SET BACK LINE

CONCRETE VALLEY GUTTER

EARTHEN SWALE

CATCH BASIN

JUNCTION BOX

AREA DRAIN

STORM DRAIN MANHOLE

FIRE HYDRANT

SANITARY SEWER MANHOLE

STREET SIGN

SPOT ELEVATION

FLOW DIRECTION

BENCHMARK

CONTOURS

TREE TO BE REMOVED

XX.XX XX.XX

OHEOHE

WW

R

Know what's below.

before you dig.Call

UTILITY STATEMENT

LOCATION OF EXISTING UNDERGROUND

UTILITIES HAVE BEEN TAKEN FROM

DRAWINGS AND FIELD LOCATES SUPPLIED BY

THE APPROPRIATE UTILITY COMPANIES.

UTILITY LOCATIONS SHOWN ON THIS

DRAWING ARE APPROXIMATE ONLY. PRIOR

TO BEGINNING ANY CONSTRUCTION, THE

CONTRACTOR SHALL VERIFY THE EXACT

LOCATION OF EACH UTILITY.

THE EXISTING INFORMATION SHOWN ON THESE

PLANS IS PER THE SURVEY COMPLETED BY:

DATED: ___________.

THE CONTRACTOR SHALL VERIFY EXISTING

SITE CONDITIONS AND CONTACT THE

ENGINEER IF DISCREPANCIES ARE NOTED.

GUIDA SURVEYING INC.

444 W. OCEAN BOULEVARD, SUITE 800

LONG BEACH, CA 90802

562.637.2306

SEPT. 2021

SITE PLAN

SCALE" 1"=50'

RB

LB

CIVIL COVER

C-001 http://www.coffman.com http://www.coffman.com http://www.coffman.com http://www.coffman.com http://www.coffman.com AutoCAD SHX Text

XX" TREE

AutoCAD SHX Text

CB

AutoCAD SHX Text

JB

AutoCAD SHX Text

AD

AutoCAD SHX Text

SDMH

AutoCAD SHX Text

SSMH

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

CB

AutoCAD SHX Text

JB

AutoCAD SHX Text

AD

AutoCAD SHX Text

SDMH

AutoCAD SHX Text

SSMH

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

SSCO

SS

SS

SS

SS

SS

SS SS SS

SS

SS

SS

SS

SS

NO

PA

RK

ING

SSCO

SSCO

SSCO

SSCO

SSCO

SS

(E) DOMESTIC WELL

DN

SS

SS

SS

SS

SS

(E) SEED BUILDING

FFE = 72.25'

(6) 9'X20' PARKING

STALLS

(6) 9'X20' PARKING

STALLS

(4) 9'X20' PARKING

STALLS

(E) SHOP

BUILDING

(E) GARAGE

(E) PMC BUILDING

(E)

GREEN

HOUSE

(E) SHED

(E) SHED

(E) SHADE

STRUCTURE

(E) BUILDING

(E) MOON TREE

APPROXIMATE

LOCATION (E)

ELECTRICAL POLE

APPROXIMATE

LOCATION (E)

LEACH LINES

(E) MOON TREE

APPROXIMATE

LOCATION (E)

ELECTRICAL POLE

APPROXIMATE

LOCATION (E)

LEACH LINES

APPROXIMATE

LOCATION (E)

LEACH LINES

SEE SHEET C-101 FOR

SEPTIC SYSTEM DESIGN

2500 GALLON

TWO COMPARTMENT

SEPTIC TANK

DISTRIBUTION

BOX

(E) FENCE

(E) GRAVEL ROAD

(E) STORAGE BIN

APPROXIMATE

LOCATION (E) SS PIPE

FROM (E) SEED

BUILDING TO BE

ABANDONED

(CONTRACTOR TO VIF)

43.1'

16.8'

(E) 342' FIRE

DEPARTMENT

ACCESS LANE

(TO REMAIN)

.1

.4

12.0'

18.3'

(E) CLEARANCE

(TO REMAIN)

19.1'

(E) ACCESS

GATE

(1) VAN

ACCESSIBLE

ADA STALL &

ACCESS AISLE

17.4'

EQUIPMENT PAD REFER TO

STRUCTURAL AND MECHANICAL

FOR DETAIL

APPROXIMATE LOCATION (E) SS

PIPE FROM (E) GARAGE) TO REMAIN

(E) PMC

BUILDING

18.8'

6.8'

REV DATE DESCRIPTION

CEI PROJ. NO.

DRAWN

CHECKED

DATE

SHEET OF

COFFMAN ENGINEERS INC.C

231226

7/22/2024

SHEET TITLE:

SHEET NO:

www.coffman.com ph 509.328.2994

10 N. Post Street, Suite 500 Spokane, WA 99201

USDA NRCS LOCKEFORD

SEED BUILDING

21011 ELLIOTT RD.

LOCKEFORD, CA 95237

100% CD

No. 68283

EXP. 9/30/25

C I V I L

STAT E OF CA L I FORN I A

RE

G

I S

TE

RED PROFESS IONAL ENG

I NEER

Know what's below.

before you dig.Call

R

UTILITY STATEMENT

LOCATION OF EXISTING UNDERGROUND

UTILITIES HAVE BEEN TAKEN FROM

DRAWINGS AND FIELD LOCATES SUPPLIED BY

THE APPROPRIATE UTILITY COMPANIES.

UTILITY LOCATIONS SHOWN ON THIS

DRAWING ARE APPROXIMATE ONLY. PRIOR

TO BEGINNING ANY CONSTRUCTION, THE

CONTRACTOR SHALL VERIFY THE EXACT

LOCATION OF EACH UTILITY.

603030 15

FEETSCALE:

1 INCH = 30

APPROXIMATE DISTURBED AREA = 10,255 SF

QUANTITIES:

CONCRETE = 540 SF @ 4" THICK = 7 CY

GRAVEL = 3,300 SF @ 12" THICK = 122 CY

4" PVC SEWER LATERAL = 240 LF

LEACH PIPE TOTAL LENGTH = 450 LF

LEGEND

CONCRETE

GRAVEL

(E) TREE

PROPERTY LINE

(E) FENCE

(E) LEACH LINE

SEWER LINE

CIVIL SITE NOTES (1-10)

ONE (1) VAN ADA PARKING STALL WITH ACCESS AISLE PER SAN JOAQUIN

COUNTY REQUIREMENTS. SEE DETAIL 1 ON SHEET C-500.

REQUIRED PARKING PER ZONING = 16 STALLS PER DETAIL 2 ON SHEET C-500.

PROPOSED CONCRETE WALKWAY PER DETAIL 2 ON SHEET C-500.

INSTALL SIGNAGE INDICATING TO WATCH FOR PEDESTRIANS AND MAXIMUM

SPEED LIMIT OF 5 MPH.

RB

LB

CIVIL SITE PLAN

C-100

THE EXISTING INFORMATION SHOWN ON THESE

PLANS IS PER THE SURVEY COMPLETED BY:

DATED: ___________.

THE CONTRACTOR SHALL VERIFY EXISTING

SITE CONDITIONS AND CONTACT THE

ENGINEER IF DISCREPANCIES ARE NOTED.

GUIDA SURVEYING INC.

444 W. OCEAN BOULEVARD, SUITE 800

LONG BEACH, CA 90802

562.637.2306

SEPT. 2021

SS

SS

1. ALL WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE LATEST

STANDARD SPECIFICATIONS FOR PUBLIC WORKS.

2. ANY EXISTING INFRASTRUCTURE, SITE FEATURES, OR PROPERTY DAMAGED AS

A RESULT OF CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR TO

THE SATISFACTION OF THE APPROPRIATE AGENCY.

3. ALL CONSTRUCTION SHALL CONFORM TO APPLICABLE STATE AND/OR LOCAL

CODES. THE CONTRACTOR SHALL HAVE A COPY OF CURRENT CODES

MAINTAINED ON SITE AT ALL TIMES.

4. ALL SIGNAGE AND PAINT MARKINGS SHALL COMPLY WITH THE MANUAL ON

UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), OR AS OTHERWISE SPECIFIED.

INSTALLATION OF SIGNS SHALL BE GOVERNED BY LOCAL CODES.

5. THE CONTRACTOR IS RESPONSIBLE TO LOCATE AND PROTECT ALL EXISTING

UTILITIES DURING CONSTRUCTION. THE CONTRACTOR IS TO NOTIFY THE

UTILITY PROTECTION CENTER AT LEAST 72 HOURS PRIOR TO ANY SITE WORK

FOR PROPER IDENTIFICATION OF EXISTING UTILITIES.

6. THE CONTRACTOR SHALL VERIFY ALL EXISTING ITEMS AND DIMENSIONS TO

REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO BEGINNING

CONSTRUCTION.

7. UNLESS OTHERWISE NOTED, PAVEMENT ELEVATION IS 6" BELOW THE TOP OF

CURB ELEVATION.

8. ALL GRADE BREAKS SHALL BE CONSTRUCTED AS A VERTICAL CURVE TO AVOID

ANY DEFINED CRESTS OR SUMPS.

9. ALL DIMENSIONS ARE SHOWN TO FACE OF CURB UNLESS OTHERWISE NOTED.

GENERAL NOTES

1. EXISTING 19' WIDE GATE TO REMAIN.

2. EXISTING FIRE DEPARTMENT ACCESS ROAD TO REMAIN.

FIRE NOTES

http://www.coffman.com http://www.coffman.com http://www.coffman.com http://www.coffman.com

SS

SS

SS

SS

SS

SS SS SS

SS

SS

SS

SS

SS

NO

PA

RK

ING

SSCO

SSCO

SSCO

SSCO

SSCO

SS

(E) DOMESTIC WELL

DN

SS

SS

SS

SS

SS

(E) SEED BUILDING

FFE = 72.25'

(E) SHOP

BUILDING

(E) GARAGE

(E)

GREEN

HOUSE

(E) SHED

(E) SHED

(E) SHADE

STRUCTURE

(E) BUILDING

APPROXIMATE

LOCATION (E)

LEACH LINES

CONNECT TO BUILDING

WASTE LINE AND INSTALL

SSCO. SEE PLUMBING

PLANS FOR CONTINUATION

I.E.=68.79

4" SCH 40 PVC SS

L=240'

S=1% MIN.

2500 GALLON

TWO COMPARTMENT

SEPTIC TANK

15'-0" X 7'-0"

4" I.E. IN = 65.50

4" I.E. OUT = 65.35

100' WATER

WELL SETBACK

APPROXIMATE

LOCATION (E)

LEACH LINES

DISTRIBUTION BOX

2'-0" X 2'-0"

90.0'(5) 90' LONG LEACH LINES

SPACED @ 10' APART

4" ABS SCHEDULE 40

SEALED PER OWTS

(E) FENCE

(E) GRAVEL ROAD

(E) STORAGE BIN

67.70 FG

65.20 INV

67.70 FG

65.20 INV

68.37 RIM

66.09 INV

68.83 RIM

66.32 INV

71.30 RIM

68.60 INV

69.49 RIM

67.16 INV

(E) ACCESS

GATE(E) PMC

BUILDING

REV DATE DESCRIPTION

CEI PROJ. NO.

DRAWN

CHECKED

DATE

SHEET OF

COFFMAN ENGINEERS INC.C

231226

7/22/2024

SHEET TITLE:

SHEET NO:

www.coffman.com ph 509.328.2994

10 N. Post Street, Suite 500 Spokane, WA 99201

USDA NRCS LOCKEFORD

SEED BUILDING

21011 ELLIOTT RD.

LOCKEFORD, CA 95237

100% CD

No. 68283

EXP. 9/30/25

C I V I L

STAT E OF CA L I FORN I A

RE

G

I S

TE

RED PROFESS I ONAL ENG

I NEER

R

UTILITY STATEMENT

LOCATION OF EXISTING UNDERGROUND

UTILITIES HAVE BEEN TAKEN FROM

DRAWINGS AND FIELD LOCATES SUPPLIED BY

THE APPROPRIATE UTILITY COMPANIES.

UTILITY LOCATIONS SHOWN ON THIS

DRAWING ARE APPROXIMATE ONLY. PRIOR

TO BEGINNING ANY CONSTRUCTION, THE

CONTRACTOR SHALL VERIFY THE EXACT

LOCATION OF EACH UTILITY.

603030 15

FEETSCALE:

1 INCH = 30

RB

LB

SEPTIC DESIGN

C-101

THE EXISTING INFORMATION SHOWN ON THESE

PLANS IS PER THE SURVEY COMPLETED BY:

DATED: ___________.

THE CONTRACTOR SHALL VERIFY EXISTING

SITE CONDITIONS AND CONTACT THE

ENGINEER IF DISCREPANCIES ARE NOTED.

GUIDA SURVEYING INC.

444 W. OCEAN BOULEVARD, SUITE 800

LONG BEACH, CA 90802

562.637.2306

SEPT. 2021

OWNER'S INFORMATION: USDA NRCS LOCKEFORD, 21011 ELLIOTT ROAD, LOCKEFORD, CA 95237

STREETS/ROADS FRONTING THE PROPERTY: ELLIOTT ROAD

GENERAL SPECIFICATIONS

1. THE SEPTIC TANK SHALL BE A 2500 GALLON TWO-COMPARTMENT SEPTIC TANK. THE TANK SHALL BE

APPROVED COMMERCIALLY CONSTRUCTED TANK MANUFACTURED MEETING THE REQUIREMENTS OF THE

SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT.

2. THE DISPERSAL FIELD TRENCHES SHALL BE EXCAVATED IN THE AREA AND AT THE DEPTH SHOWN ON THE PLANS OR AS NOTED IN FIELD STAKING. THE BOTTOM OF THE TRENCHES SHALL BE LEVEL, TAKING CARE NOT TO COMPACT THE SOIL DURING EXCAVATION. THE DISPERSAL FIELD TRENCH SHALL BE FILLED WITH DRAINROCK TO THE DEPTH SHOWN IN THE PLANS. DRAINROCK SHALL BE CLEAN WASHED GRAVEL RANGING

IN SIZE FROM 1" TO 2.5" IN DIAMETER.

3. PRIOR TO BACKFILLING THE DRAINFIELD TRENCH, THE SYSTEM MUST BE TESTED TO ASSURE UNIFORM DISTRIBUTION THROUGHOUT THE TRENCH AND TO DETERMINE THE PRESENCE OF ANY OCCLUSIONS IN THE

LATERALS.

4. ALL WASTEWATER PIPES ENTERING OR LEAVING THE TANK SHALL FORM A WATERTIGHT SEAL WITH THE

CONCRETE WALLS.

5. INSPECTION OF THE SYSTEM BY SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT IS REQUIRED DURING CONSTRUCTION. THE SYSTEM SHALL NOT BE BACKFILLED UNTIL THE SEPTIC TANK AND

ALL PIPING HAVE BEEN INSPECTED BY BOTH SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH

DEPARTMENT.

6. TESTING NOTES PER SAN JOAQUIN COUNTY OWTS STANDARDS.

7. THE OWTS SHALL BE OPERATED AND MAINTAINED PER SAN JOAQUIN COUNTY OWTS STANDARDS.

NOTES

1. ALL ONSITE WASTEWATER TREATMENT SYSTEMS (OWTS) SHALL CONFORM TO THE REQUIREMENTS OF THE

WATER QUALITY CONTROL POLICY FOR SITING, DESIGN, OPERATION, AND MAINTENANCE OF ONSITE

WASTEWATER TREATMENT SYSTEMS POLICY, THE SAN JOAQUIN COUNTY ONSITE WASTEWATER

TREATMENT SYSTEMS LOCAL AGENCY MANAGEMENT PROGRAM (LAMP), TITLE 9 OF THE ORDINANCE CODE

OF SAN JOAQUIN COUNTY, AND THESE STANDARDS.

2. INSTALLER SHALL SET SEPTIC TANK SO AS TO ASSURE GRAVITY FLOW FROM THE BUILDING (MINIMUM 1%

SLOPE).

3. EXISTING AND PROPOSED UTILITIES MAY NOT BE SHOWN. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES. CALL THE UNDERGROUND UTILITY LOCATION SERVICE AT 811 BEFORE YOU DIG. ANY CONFLICTING UTILITIES SHALL BE RELOCATED PRIOR TO

CONSTRUCTION.

4. IF THE INSTALLER DISCOVERS ANY DISCREPANCIES BETWEEN THE PLANS AND EXISTING CONDITIONS

ENCOUNTERED, THE INSTALLER SHALL IMMEDIATELY NOTIFY THE DESIGN ENGINEER.

5. THESE PLANS ARE SCHEMATIC AND ARE NOT INTENDED TO DEPICT ALL DETAILS OF THE WORK REQUIRED.

THE INSTALLER SHALL BE RESPONSIBLE TO BE FAMILIAR WITH ACTUAL SITE CONDITIONS AND FACTORS

AFFECTING THE WORK.

6. GRADING SHALL BE DONE IN SUCH A MANNER THAT ALL DRAINAGE IS DIVERTED AWAY FROM THE

DRAINFIELD. NO DRAINAGE SHALL POND NEAR THE DRAINFIELD.

COMMERCIAL ONSITE WASTEWATER TREATMENT SYSTEM (OWTS) SIZING

TYPE OF ESTABLISHMENT - PUBLIC GATHERING SPACE FOR 100 OCCUPANTS (AT 10 GAL PER PERSON)

SOIL TYPE - SILTY SAND (PER GEOTECH REPORT BY WALLACE KUHL AND ASSOCIATES DATED

OCTOBER 29, 2021)

1. SEPTIC TANK SIZING

BASE TANK CAPACITY (BTC) = 1,200 GALLONS + ADF

BTC = 1,200 GAL + 10 GAL/PER * 100 PER = 2,200 GALLONS

2,500 GALLON OLDCASTLE SEPTIC TANK

2. LATERALS

PIPE TYPE - 4" SCH 40 PVC OR OTHER APPROVED EQUAL

LATERAL LENGTH - 240'

3. LEACH LINE SIZING

PIPE TYPE - 4" PVC PERFORATED PIPE OR OTHER APPROVED MATERIAL

[BTC + AVERAGE DAILY FLOW (ADF) ]* SOIL FACTOR

[1,200 GALLONS + 1,000 ADF ] *0.20 = 440 LF LEACH LINE REQUIRED (450 LF PROVIDED)

FILTER BED SIZING = 440 LF X 3 = 1320 SF MIN. REQUIRED

PERCOLATION TESTING SHOULD BE PERFORMED ACCORDING TO THE SAN JOAQUIN COUNTY OWTS

MANUAL PRIOR TO INSTALLATION IN ORDER TO CONFIRM ASSUMPTIONS AND SYSTEM DESIGN ARE

CONSISTENT WITH ACTUAL SITE CONDITIONS.

LEGEND

CONCRETE

GRAVEL

(E) TREE

PROPERTY LINE

(E) FENCE

(E) LEACH LINE

SEWER LINE

SS

SS

SEPTIC NOTES (11-20)

INSTALL (N) 4" DIAMETER SANITARY SEWER LATERAL SLOPED AT 1%

MINIMUM. PROVIDE CLEANOUT TO GRADE AT BUILDING AND BEHIND

PROPERTY LINE AND AT MAJOR CHANGES IN DIRECTION AND EVERY 90

FEET AND 45° BEND. REFER TO DETAIL 4 ON SHEET C-500 FOR TRENCH

DETAIL. REFER TO DETAIL 6 ON SHEET C-500 FOR CLEANOUT.

INSTALL 2,500 GALLON MINIMUM SEPTIC TANK. REFER TO OLDCASTLE

CST-2500-2 ON SHEET C-500.

INSTALL DISTRIBUTION BOX PER OLDCASTLE DB-9 ON SHEET C-500.

http://www.coffman.com http://www.coffman.com http://www.coffman.com

NO

PA

RK

ING

SS

SS

SS

(72.25 FG)

5.

0'

5.0'

DOCK

(N) CONFERENCE

ROOM DOOR

ACCESS

18.0'

8.

0'

9.

0'

4.9'

17.5'

72.18 FG (72.10) FS

CONFORM

(72.08) FS

CONFORM

71.98 FS

1.0%

(72.19) FS

CONFORM

(72.5±) FS

CONFORM1.1%

(72.06) FS

CONFORM

1.

0%

1.

5%

(72.34) FS

CONFORM

72.22 FS

1.

5%

(72.24) FS

CONFORM

(N) EQUIPMENT PADS

SEE STRUCTURAL AND

MECHANICAL PLANS

Know what's below.

before you dig.Call

R

UTILITY STATEMENT

LOCATION OF EXISTING UNDERGROUND

UTILITIES HAVE BEEN TAKEN FROM

DRAWINGS AND FIELD LOCATES SUPPLIED BY

THE APPROPRIATE UTILITY COMPANIES.

UTILITY LOCATIONS SHOWN ON THIS

DRAWING ARE APPROXIMATE ONLY. PRIOR

TO BEGINNING ANY CONSTRUCTION, THE

CONTRACTOR SHALL VERIFY THE EXACT

LOCATION OF EACH UTILITY.

THE EXISTING INFORMATION SHOWN ON THESE

PLANS IS PER THE SURVEY COMPLETED BY:

DATED: ___________.

THE CONTRACTOR SHALL VERIFY EXISTING

SITE CONDITIONS AND CONTACT THE

ENGINEER IF DISCREPANCIES ARE NOTED.

GUIDA SURVEYING INC.

444 W. OCEAN BOULEVARD, SUITE 800

LONG BEACH, CA 90802

562.637.2306

SEPT. 2021 201010 5

FEETSCALE:

1 INCH = 10

REV DATE DESCRIPTION

CEI PROJ. NO.

DRAWN

CHECKED

DATE

SHEET OF

COFFMAN ENGINEERS INC.C

231226

7/22/2024

SHEET TITLE:

SHEET NO:

www.coffman.com ph 509.328.2994

10 N. Post Street, Suite 500 Spokane, WA 99201

USDA NRCS LOCKEFORD

SEED BUILDING

21011 ELLIOTT RD.

LOCKEFORD, CA 95237

100% CD

No. 68283

EXP. 9/30/25

C I V I L

STAT E OF CA L I FORN I A

RE

G

I S

TE

RED PROFESS I ONAL ENG

I NEER

RB

LB

GRADING PLAN

C-200

BUILDING FFE = 72.25

LEGEND

CONCRETE

GRAVEL

(E) TREE

PROPERTY LINE

(E) FENCE

(E) LEACH LINE

SEWER LINE

SS

SS

http://www.coffman.com http://www.coffman.com http://www.coffman.com

SS

SS

SS

SS

SS

SS SS SS

SS

SS

SS

SS

SS

NO

PA

RK

ING

SSCO

SSCO

SSCO

SSCO

SSCO

SS

SS

SS

SS

SS

SS

(E) MOON TREE

(E) SEED BUILDING

(E) SHOP

BUILDING

(E) GARAGE

(E) PMC BUILDING

(E)

GREEN

HOUSE

(E) SHED

(E) SHED

(E) SHADE

STRUCTURE

(E) BUILDING

TC1

WM8

X

X

X

X

X

X

X X

SE5

XXXXXX

X

X

X

X X

SE5

SE5

SE5

X

REV DATE DESCRIPTION

CEI PROJ. NO.

DRAWN

CHECKED

DATE

SHEET OF

COFFMAN ENGINEERS INC.C

231226

7/22/2024

SHEET TITLE:

SHEET NO:

www.coffman.com ph 509.328.2994

10 N. Post Street, Suite 500 Spokane, WA 99201

USDA NRCS LOCKEFORD

SEED BUILDING

21011 ELLIOTT RD.

LOCKEFORD, CA 95237

100% CD

No. 68283

EXP. 9/30/25

C I V I L

STAT E OF CA L I FORN I A

RE

G

I S

TE

RED PROFESS I ONAL ENG

I NEER

R

UTILITY STATEMENT

LOCATION OF EXISTING UNDERGROUND

UTILITIES HAVE BEEN TAKEN FROM

DRAWINGS AND FIELD LOCATES SUPPLIED BY

THE APPROPRIATE UTILITY COMPANIES.

UTILITY LOCATIONS SHOWN ON THIS

DRAWING ARE APPROXIMATE ONLY. PRIOR

TO BEGINNING ANY CONSTRUCTION, THE

CONTRACTOR SHALL VERIFY THE EXACT

LOCATION OF EACH UTILITY.

603030 15

FEETSCALE:

1 INCH = 30

THE EXISTING INFORMATION SHOWN ON THESE

PLANS IS PER THE SURVEY COMPLETED BY:

DATED: ___________.

THE CONTRACTOR SHALL VERIFY EXISTING

SITE CONDITIONS AND CONTACT THE

ENGINEER IF DISCREPANCIES ARE NOTED.

GUIDA SURVEYING INC.

444 W. OCEAN BOULEVARD, SUITE 800

LONG BEACH, CA 90802

562.637.2306

SEPT. 2021

EROSION AND SEDIMENT CONTROL BMP NOTES

1. THIS PLAN MAY NOT COVER ALL THE SITUATIONS OR PHASES THAT ARISE DURING CONSTRUCTION DUE TO

UNANTICIPATED FIELD CONDITIONS. IN GENERAL, THE CONTRACTOR IS RESPONSIBLE FOR KEEPING SEDIMENT STORM RUNOFF FROM LEAVING THE SITE. SEDIMENT ROLLS AND SILT FENCES SHALL BE USED BY THE CONTRACTOR ON AN AS NEEDED BASIS TO INHIBIT SILT FROM LEAVING THE SITE AND ENTERING THE STORM DRAIN SYSTEM. TEMPORARY EROSION CONTROL DEVICES SHOWN ON GRADING PLAN WHICH INTERFERE WITH THE WORK SHALL BE RELOCATED OR MODIFIED WHEN THE INSPECTOR SO DIRECTS AS THE

WORK PROGRESSES.

2. EROSION CONTROL FACILITIES SHALL BE MAINTAINED DAILY. THESE FACILITIES SHALL CONTROL AND CONTAIN EROSION-CAUSED SILT DEPOSITS AND PROVIDE FOR THE SAFE DISCHARGE OF SILT FREE STORM WATER INTO EXISTING AND PROPOSED STORM DRAIN FACILITIES. DESIGN OF THESE FACILITIES MUST BE

APPROVED AND UPDATED EACH YEAR BY THE ENGINEER (OCTOBER 1 TO APRIL 15).

3. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN

ACCORDANCE WITH CITY STANDARD.

4. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL SUB-CONTRACTOR AND SUPPLIERS ARE AWARE OF ALL STORM WATER QUALITY MEASURES AND IMPLEMENT SUCH MEASURES. FAILURE TO COMPLY WITH THE APPROVED CONSTRUCTION WILL RESULT IN THE ISSUANCE OF CORRECTION NOTICES, CITATIONS, AND / OR A PROJECT STOP ORDER.

5. THE SITE SHALL BE MAINTAINED SO AS TO MINIMIZE SEDIMENT LADEN RUNOFF TO ANY STORM DRAIN

SYSTEM.

6. DURING THE RAINY SEASON, ALL PAVED AREAS WITH SPOILS STORAGE SHALL BE PROTECTED AND COVERED. THE SITE IS TO BE MAINTAINED SO AS TO MINIMIZE SEDIMENT RUNOFF TO ANY STORM DRAIN

SYSTEM.

7. DURING PERIODS WHEN STORMS ARE FORECAST:

A. EXCAVATED SOILS SHOULD NOT BE PLACED IN STREETS OR ON PAVED AREAS.

B. ANY EXCAVATED SOILS SHOULD BE REMOVED FROM THE SITE BY THE END OF DAY.

C. WHERE STOCKPILING IS NECESSARY, USE A TARPAULIN OR SURROUND THE STOCKPILE WITH FIBER

ROLLS, GRAVEL SEDIMENT BARRIER, SILT FENCE, OR OTHER RUNOFF CONTROLS.

D. USE INLET CONTROLS AS NEEDED (E.G. BLOCK AND GRAVEL SEDIMENT BARRIER) FOR STORM DRAIN

ADJACENT TO THE PROJECT SITE OR STOCKPILED SOIL.

8. THOROUGHLY SWEEP ALL PAVED AREAS EXPOSED TO SOIL EXCAVATION AND PLACEMENT.

9. STAND-BY CREWS SHALL BE ALERTED BY THE OWNER OR CONTRACTOR FOR EMERGENCY WORK DURING

RAINSTORMS.

10. AFTER OCTOBER 1ST TO APRIL15TH, ALL EROSION CONTROL MEASURES WILL BE INSPECTED DAILY AND

AFTER EACH STORM.

11. BORROW AREAS AND TEMPORARY STOCKPILES SHALL BE PROTECTED WITH APPROPRIATE EROSION

CONTROL MEASURES TO THE SATISFACTION OF THE ENGINEER.

12. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING SAFETY OF VEHICLES OPERATING IN ROADWAY

ADJACENT TO EROSION CONTROL FACILITY.

13. DUST CONTROL SHOULD BE PRACTICED ON ALL CONSTRUCTION SITES WITH EXPOSED SOILS AS NEEDED. IT IS IMPORTANT IN WINDY OR WIND-PRONE AREAS. DUST CONTROL IS CONSIDERED A TEMPORARY MEASURE AND AS INTERMEDIATE TREATMENT BETWEEN SITE DISTURBANCE AND CONSTRUCTION, PAVING, OR

REVEGETATION. REFER TO CASQA BMP HANDBOOK.

EROSION AND SEDIMENT CONTROL BMP MAINTENANCE NOTES

1. USE FIBER ROLL ALONG CONTOURS OF SHORT SLOPES OR SLOPES 3:1 OR FLATTER, KEYED INTO GROUND

AT LEAST 3” DEEP (TYPICALLY 25' APART).

2. INSTALL SILT FENCE ALONG CONTOURS AS SECONDARY MEASURE TO KEEP SEDIMENT ONSITE AND TO MINIMIZE VEHICLE AND FOOT TRAFFIC BEYOND LIMITS OF SITE DISTURBANCE. SILT FENCING MUST BE KEYED

IN.

3. CONSTRUCT A CONCRETE WASHOUT SITE ADJACENT TO STABILIZED ENTRANCE. CLEAN AS NEEDED AND

REMOVE AT END OF PROJECT.

4. COVER ALL STOCKPILES AND LANDSCAPE MATERIAL AND BERM PROPERLY WITH STRAW WATTLES OR SAND BAGS. KEEP BEHIND SILT FENCE, AWAY FROM WATER BODIES. HAZARDOUS MATERIALS AND REFUSE MUST BE KEPT IN CLOSED CONTAINERS THAT ARE COVERED AND UTILIZE SECONDARY CONTAINMENT, NOT

DIRECTLY ON SOIL.

5. USE PEA-GRAVEL BAGS, (OR SIMILAR PRODUCT) AROUND DRAIN INLETS LOCATED BOTH ONSITE AND IN

GUTTER AS A LAST LINE OF DEFENSE.

6. PLACE PORT-A-POTTY WITH SECONDARY CONTAINMENT, BEHIND THE CURB AND AWAY FROM GUTTERS, STORM DRAIN INLETS, AND WATER BODIES.

7. COVER ALL EXPOSED SOIL WITH STRAW MULCH AND TACKIFIER (OR EQUIVALENT).

8. EXISTING VEGETATION SHOULD BE PRESERVED AS MUCH AS POSSIBLE. AREAS OF DISTURBED

SOIL/VEGETATION SHOULD BE REVEGETATED AS SOON AS PRACTICAL.

9. PREVENT EQUIPMENT FLUID LEAKS ONTO GROUND BY PLACING DRIP PANS OR PLASTIC TARPS UNDER

EQUIPMENT. REPAIR EQUIPMENT AS NECESSARY.

ADDITIONAL BMPS DURING CONSTRUCTION

1. LIMIT THE EXTENT OF LAND DISTURBANCE TO THE MINIMUM AMOUNT NECESSARY TO CONSTRUCT THE

PROJECT.

2. HYDROSEED DISTURBED AREAS WITH NATIVE PLANTS IMMEDIATELY UPON CONCLUSION OF CONSTRUCTION

ACTIVITIES.

3. STAGING AREAS OF CONSTRUCTION EQUIPMENT AND MATERIALS, INCLUDING RECEPTACLES AND

TEMPORARY STOCKPILES OF GRADED MATERIALS MUST BE COVERED ON A DAILY BASIS.

4. GOOD CONSTRUCTION MEASURES SUCH AS THE USE OF DRY CLEANUP MEASURES WHENEVER POSSIBLE, COLLECTING AND FILTERING CLEANUP WATER WHEN DRY CLEANUP METHODS ARE NOT FEASIBLE, CLEANING AND REFUELING CONSTRUCTION EQUIPMENT AT DESIGNATED OFF SITE MAINTENANCE AREAS, AND

IMMEDIATE CLEANUP OF ANY LEAKS OR SPILLS.

SE-5

TC-1

INSTALL FIBER ROLLS PER SE-5.

CONSTRUCTION ENTRANCE/EXIT PER TC-1.

INSTALL CONCRETE WASHOUT ROLL OFF BIN WITH LID REFER TO

WM-8 FOR ADDITIONAL INFORMATION.

EROSION CONTROL KEY NOTES:

WM-8

RB

LB

EROSION

CONTROL PLAN

C-300

FIBER ROLLS

CONSTRUCTION ENTRANCE/EXIT

CONCRETE WASHOUT

PROPOSED FLOW DIRECTION

LEGNED:

http://www.coffman.com http://www.coffman.com http://www.coffman.com

REV DATE DESCRIPTION

CEI PROJ. NO.

DRAWN

CHECKED

DATE

SHEET OF

COFFMAN ENGINEERS INC.C

231226

7/22/2024

SHEET TITLE:

SHEET NO:

www.coffman.com ph 509.328.2994

10 N. Post Street, Suite 500 Spokane, WA 99201

USDA NRCS LOCKEFORD

SEED BUILDING

21011 ELLIOTT RD.

LOCKEFORD, CA 95237

100% CD

No. 68283

EXP. 9/30/25

C I V I L

STAT E OF CA L I FORN I A

RE

G

I S

TE

RED PROFESS I ONAL ENG

I NEER

EROSION CONTROL

DETAILS

C-301

SE-5 FIBER ROLLSTC-1 STABILIZED CONSTRUCTION ENTRANCE/EXIT WM-8 CONCRETE WASTE MANAGEMENT http://www.coffman.com http://www.coffman.com http://www.coffman.com http://www.coffman.com http://www.coffman.com AutoCAD SHX Text

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text

SCALE: NTS

CEI PROJ. NO.

DRAWN

CHECKED

DATE

SHEET OF

COFFMAN ENGINEERS INC.C

231226

7/22/2024

SHEET TITLE:

SHEET NO:

www.coffman.com ph 509.328.2994

10 N. Post Street, Suite 500 Spokane, WA 99201

USDA NRCS LOCKEFORD

SEED BUILDING

21011 ELLIOTT RD.

LOCKEFORD, CA 95237

100% CD

No. 68283

EXP. 9/30/25

C I V I L

STAT E OF CA L I FORN I A

RE

G

I S

TE

RED PROFESS I ONAL ENG

I NEER

SPECIFICATIONS

C-400

GENERAL NOTES

1. WORK AND MATERIALS SHALL COMPLY WITH THE CONSTRUCTION DOCUMENTS AND THE REQUIREMENTS AND STANDARDS OF THE AUTHORITIES HAVING JURISDICTION. IF STANDARDS ARE NOT PROVIDED BY THE AUTHORITIES HAVING JURISDICTION, WORK AND MATERIALS SHALL COMPLY WITH THE MOST

CURRENT EDITION OF THE CALTRANS STANDARD SPECIFICATIONS.

2. THE CONTRACTOR SHALL CALL THE UNDERGROUND SERVICE ALERT ONE-CALL NUMBER 811 TWO BUSINESS DAYS PRIOR TO EXCAVATION.

3. INFORMATION ON EXISTING CONDITIONS AND BOUNDARIES / RIGHT OF WAY SHOWN ON THESE PLANS WAS OBTAINED FROM A SURVEY NOT PERFORMED BY COFFMAN ENGINEERS. NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND REQUIRED ELEVATIONS AT THE SUBJECT SITE. VERIFY THE LOCATION AND SIZE OF EXISTING UTILITIES BEFORE PROCEEDING WITH CONSTRUCTION ACTIVITIES, INCLUDING UNDERGROUND AND OVERHEAD UTILITIES, UTILITY STRUCTURES, POINTS OF CONNECTION, AND UTILITY CROSSINGS. NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR EXCEPTIONS ENCOUNTERED PRIOR TO PROCEEDING. ANY COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING CONSTRUCTION SHALL BE BORNE BY THE CONTRACTOR.

4. THE CONTRACTOR SHALL HAVE A COMPLETE SET OF APPROVED CONSTRUCTION DOCUMENTS (INCLUDING ADDENDA) ON THE JOB SITE WHENEVER

CONSTRUCTION IS IN PROGRESS.

5. THE CONTRACTOR SHALL PERFORM ALL WORK NECESSARY TO COMPLETE THIS PROJECT IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS, INCLUDING SUCH INCIDENTALS AS MAY BE NECESSARY TO MEET THE REQUIREMENTS AND STANDARDS OF THE AUTHORITIES HAVING JURISDICTION.

6. ALL MATERIALS, REQUIRED FOR THE COMPLETE EXECUTION OF THE PROJECT, SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR UNLESS

OTHERWISE NOTED.

7. THE DRAWINGS INDICATE LOCATIONS, DIMENSIONS, REFERENCES, AND TYPICAL DETAILS OF CONSTRUCTION. THE DRAWINGS DO NOT INDICATE EVERY CONDITION. WORK NOT FULLY DETAILED SHALL BE OF CONSTRUCTION SIMILAR TO PARTS THAT ARE FULLY DETAILED.

8. THE CONTRACTOR SHALL OBTAIN THE APPROPRIATE APPROVALS AND PERMITS FROM THE AUTHORITIES HAVING JURISDICTION PRIOR TO PROCEEDING WITH CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL COORDINATE WITH THE AUTHORITIES HAVING JURISDICTION TO CONFIRM INSPECTION, TESTING, AND

CERTIFICATION REQUIREMENTS.

9. CONSTRUCTION SHALL COMPLY WITH THE AMERICANS WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES (ADAAG).

10. EXISTING PROPERTY CORNERS AND SURVEY MONUMENTS SHALL BE PROTECTED DURING CONSTRUCTION. ANY DAMAGED OR OBLITERATED CORNERS OR MONUMENTS SHALL BE RE-ESTABLISHED BY A PROFESSIONAL SURVEYOR AT THE CONTRACTOR'S EXPENSE.

11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)

STANDARDS. COORDINATE REQUIREMENTS WITH THE AUTHORITIES HAVING JURISDICTION.

12. THE CONTRACTOR SHALL HAVE A SUPERINTENDENT OR REPRESENTATIVE ON SITE AT ALL TIMES DURING CONSTRUCTION.

13. SAFETY STANDARDS AND REQUIREMENTS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND COMPLIED WITH AS SET FORTH BY OSHA.

14. CONTRACTOR SHALL LEAVE AN EMERGENCY PHONE NUMBER WITH THE POLICE AND FIRE DEPARTMENTS.

15. CONTRACTOR SHALL POST ON THE SITE, EMERGENCY TELEPHONE NUMBERS FOR PUBLIC WORK, AMBULANCE, POLICE AND FIRE DEPARTMENTS.

16. THE CONTRACTOR SHALL HAVE THE APPROPRIATE LICENSES TO PERFORM THE SPECIFIED WORK IN CONFORMANCE WITH THE AUTHORITIES HAVING

JURISDICTION.

17. CONSTRUCTION EQUIPMENT SHALL BE PROPERLY MUFFLED. UNNECESSARY IDLING OF GRADING CONSTRUCTION EQUIPMENT IS PROHIBITED.

18.…