This is a Statement of Work (SOW) for cultural and historic resources assessment services related to proposed upgrades at the NRCS Plant Materials Center (PMC) in Lockeford, California. The contractor will prepare a Work Plan and Cultural/Historic Resources Technical Report to support the NRCS's environmental review under the National Environmental Policy Act (NEPA) and findings of effect under Section 106 of the National Historic Preservation Act (NHPA). The proposed action involves renovating a 1,000 square foot training and conference space within an existing seed building on a 106-acre federally owned facility. The contractor must identify and evaluate potential impacts to historic properties within the Area of Potential Effects (APE).
Deliverables include a Work Plan describing Alternative 1 (the proposed renovation including construction of four parking lots, concrete walkway, sewer line modifications, and septic system installation), a recommended APE boundary, and a research design for field studies. The contractor must conduct records research at the California Historical Resources Information Center (CHRIS) and complete an intensive pedestrian cultural resources inventory of the APE. The final technical report must provide National Register of Historic Places (NRHP) eligibility recommendations for identified resources and analysis of potential adverse effects per 36 CFR § 800.5. The contract is firm-fixed-price with an estimated 90-day performance period: fieldwork must begin within 30 days of contract award, with draft reports due 45 days after fieldwork completion and final reports due 15 days after NRCS comments. Partial payment is structured at 50% following fieldwork, 25% upon draft report submission, and 25% upon final deliverable acceptance. The contractor must meet Secretary of Interior professional qualification standards and ensure all identified documentation and GIS shapefiles are submitted in searchable digital formats. Contact information for technical questions is provided: Christopher Null at christopher.null@usda.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 12FPC326Q0017 Wage Determination Yolo Cty.pdf | ||
| C04 12FPC326Q0017 SF-1449 Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Assistance with Effect Determinations for the California Plant Materials Center’s Proposed Upgrades
Part I: General Information
It is the mission of the Natural Resources Conservation Service (NRCS) to provide leadership in a partnership effort to help people conserve, maintain, and improve our nation’s natural resources and environment. The NRCS Plant Materials Center (PMC), a 106-acre working facility in Lockeford, assists with this mission by conducting studies, demonstrating Agency conservation practices, and providing a centrally located training location. The PMC is federally owned and has been in operation for over 50 years
A. Introduction/Background
The NRCS is soliciting quotes from Contractors for the completion of an impact assessment for proposed upgrades to the PMC. These upgrades would in part repurpose a currently underutilized storage area into a 1000 square foot training and conference space. This work constitutes a Proposed Action under the National Environmental Policy Act (NEPA) and an Undertaking under National Historic Preservation Act (NHPA). Therefore, a review for potential impacts to historic properties per Section 106 of the NHPA (Section 106) within the area of potential effects (APE) is necessary before approval of the project.
B. Scope
Contractor will prepare a Work Plan and Cultural/Historic Resources Technical Report. The deliverables for this Task must support the NRCS’s environmental review per NEPA and finding of effect per NHPA Section 106. The Contractor will submit (a.) a brief Work Plan to the NRCS for approval outlining planned studies of the Affected Environment/APE for Alternative 1 to identify cultural resources/historic properties that could be impacted by the Proposed Action. Once approval of the Work Plan is obtained, the Contractor will (b.) carry out the studies and (c.) submit a draft cultural/historic resources technical report to the NRCS for review. The draft technical report will be reviewed by the NRCS, and the final technical report will incorporate any comments or requests for revision provided by the NRCS. The draft and final technical reports must be suitable for supporting the NRCS’s consultation with the State Historic Preservation Officer (SHPO), Tribal Historic Preservation Officers (THPO), and Native American tribes pursuant to Section 106 and will be appended to the Environmental Evaluation. The NRCS will provide appropriate information to the Contractor regarding consultation with the SHPO/ THPO and Native American tribes.
a. Work Plan:
i. Includes a thorough description of the Alternative 1 to include the anticipated the extent of ground disturbances (including borrow sites) or modifications/demolitions of buildings/structures.
ii. Describes and illustrates a recommended area of potential effects (APE) for the Affected Environment of Alternative 1, and a research design for studies to identify cultural resources/historic properties including field surveys and background research.
iii. Must be approved by the NRCS prior to scheduling or conducting any field work so that requests from tribal consulting partners can be considered and/or accommodated.
b. Field Study Effort:
i. Prior to commencing the pedestrian inventory, Contractors will complete a review of records for information for the task order regarding previous cultural resources inventories and previously recorded cultural resource sites.
ii. Contractors will complete an intensive pedestrian cultural resources inventory of the indicated APE to identify historic properties that may be adversely affected as a result of the proposed undertaking.
c. Draft and Final Technical Reports:
i. Include information contained in the Work Plan regarding the Affected Environment/
APE and the research design for field studies/background research
ii. Include results of a records search conducted at the appropriate California Historical
Resources Information Center (CHRIS) addressing the Affected Environment/APE for Alternative 1. The CHRIS results must tabulate resource descriptions, state resource numbers, and the known or recommended National Register of Historic Places (NRHP) eligibility status of each.
iii. Include appropriate background research including results of historical map research and literature review relevant to the Affected Environment/APE for Alternative 1.
iv. Include the results of surveys of the Affected Environment/APE for Alternative 1. The results must provide a recommended NRHP eligibility determination for any cultural/historic resources that could be impacted by the Proposed Action pursuant to 36 CFR § 60.4, and provide a clear and succinct analysis of how such resources could be affected pursuant to the criteria of effect at 36 CFR § 800.5. Note that appropriate expertise is required by NHPA Sections 106 and 112 to provide NRHP evaluation recommendations based on the type of resources. This would include, but is not limited to, recommendations regarding the built environment.
v. Contain appropriate documentation of identified archaeological and historical resources.
C. Applicable Documents
Procedures for complying with the aforementioned mandates are outlined in the following references:
• Section 106 of the National Historic Preservation Act (NHPA), as amended
• 36 CFR 800; Protection of Historic Properties
• Archaeology and Historic Preservation: Secretary of Interior’s Standards and Guidelines
• National Environmental Policy Act of 1969
• Native American Graves Protection and Repatriation Act of 1990
• Archaeological Resources Protection Act of 1979
• NRCS National Cultural Resources Procedures Handbook Title 190, Part 601 (amended Oct.
2018)
• NRCS National Environmental Compliance Handbook Title 190, Part 610 (amended May 2016)
Guidelines is available from the following National Park Service website:
http://www.cr.nps.gov/linklaws.htm. The NRCS documents may be obtained from the NRCS eDirectives website: https://directives.sc.egov.usda.gov/directive/22.
Part II: Work Requirements
Contractors shall provide sufficient information for the project to enable the NRCS to remain in compliance with Federal cultural resources laws for the completion of these undertakings. Contractors shall warrant that the provided cultural resources services will comply with all applicable Federal, State, and local laws and requirements, and shall be consistent with NRCS cultural resources program goals and objectives. All work must be performed in accordance with the “Secretary of Interior’s Standards and Guidelines for Archaeology and Historic Preservation”. The NRCS retains the responsibility for all decision-making and consultation required of Federal agencies related to compliance with cultural resources protection laws and regulations. Contractors must meet the Secretary of Interior’s professional standards as specified in Section 112(a)(1)(A) of the NHPA and in the implementing regulations for Section 106 of the NHPA at 36 CFR 800.2(a)(1) and 36 CFR 800.2(a)(3). Contractors shall be used in accordance with 36 CFR 800.2(a)(3) (“Use of Contractors”). The Contractor shall furnish all labor, equipment, supervision, materials and incidentals necessary to perform archaeological and historical surveying, recording, mapping, evaluations, and reporting. The Contractor shall also furnish a qualified Principal Investigator and field directors/crew chiefs in accordance with 36 CFR 61.5. The Contractor shall ensure that all approvals, authorities, rights, permits, and easements necessary for conducting the cultural resources survey on Federal lands have been obtained prior to initiating fieldwork.
Part III. Technical Requirements
A. Pre-Field Work Requirements
Prior to fieldwork, the Contractor will receive Geographic Information System (GIS) shapefiles from the NRCS for the task order that will delineate the area needing survey. Upon receipt of the data, the Contractor shall complete a records review to identify previously recorded cultural resources and determine the nature of previous archaeological research in the vicinity of the APE. The literature review will primarily focus on records in the California Historical Resources Information System (CHRIS) maintained by the California Office of Historic Preservation (OHP), but should also include the NRHP online database, General Land Office (GLO) plat maps, and other sources and data repositories, as necessary and where appropriate. For the purposes of this Statement of Work, the literature review will be limited to cultural resources identified within a half of a mile of the APE boundary. Before beginning fieldwork, the Contractor will coordinate with the Manager of the Lockeford Plant Materials Center (Margaret Smither-Kopperl, Ph. D.) for the field study.
B. Pedestrian Inventory Requirements
The purpose of this contract is to collect appropriate information about cultural resources within the Project Assignment’s APE including CHRIS records searches, conduct a survey of the APE, and report the findings to the State Archaeologist. The Contractor will coordinate field work with the Manager of the Lockeford Plant Materials Center (Margaret Smither-Kopperl, Ph. D.) to access the property and the APE. Contractor is expected observe industry-standard safety precautions in accessing and surveying the property. Contractor agrees that information collected during field work, including photographs and data about cultural resources is confidential and may not be shared with outside sources unless authorized by the NRCS CA. All documentation resulting from field work is the property of the NRCS CA.
Field survey methods/sampling strategies will be at the awardee’s discretion but justified based on site probability/prevalence and supported in submitted reports. It is expected that survey methods will vary from Reconnaissance level for low probably areas to Intensive for high probably/known site locations;
transect interval would adjust accordingly. When cultural resources are encountered, efforts to establish site extent and integrity will be attempted if it appears the location is indicative of a Historic Property.
The contractor will meet the Secretary of the Interior Guidelines for professional Qualifications Standards as listed in the Federal Register, Volume 48, Number 190, Thursday, September 29, 1983 for archaeologist and architectural historian. All survey crews will have direct supervision in the field by a person meeting those standards.
C. Cultural Resources Documentation Requirements
The Contractor will complete the following fieldwork tasks:
• Collect information regarding prior survey and known cultural resources within and near the APE including, but not limited to, a CHRIS records search;
• Conduct a field survey of the APE utilizing a sampling method appropriate for APE site prevalence and/or probability;
• Take photographs of the APE and the areas surveyed;
• Collect GPS data (UTMS per NAD 83) and photographs of areas that were surveyed, as well as areas was survey was obstructed or otherwise limited;
• Complete the appropriate OHP DPR 523 forms pursuant to NRCS CA Survey Guidelines for all cultural resources encountered in the APE.
• Cite appropriate bibliographic information for sources that were consulted regarding the nature and significance of cultural resources recorded within the APE.
• Submit a draft Survey Report, including map(s) and photographs, in Word format via email to the State Archaeologist or designee. Contractor agrees to provide timely clarifications or corrections, if needed. A revised draft submittal will not be necessary unless extensive clarifications or corrections are needed as determined by the State Archaeologist or designee.
D. Evaluation Criteria
AR provision 52.212-2, Evaluation-Commercial Items applies to this solicitation as follows.
• The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The Government will conduct a tradeoff process to determine the offeror whose proposal represents the best value to the Government. Please see the attached “Proposal Evaluation Criteria” for more details. The following evaluation factors will be used to evaluate offers and are listed in descending order of importance: minimum requirements, technical evaluation, capacity to accomplish the work and past performance, and price.
E. Period of Performance and Payment
The Contractor shall deliver a draft and a final professional survey report, and all site documentation as outlined above. The estimated period of performance for this contract is 90 days. The following performance schedule shall be used as a guideline:
• Fieldwork shall begin on the first task order within 30 days from award of contract. The Contractor shall notify the NRCS POC when the fieldwork is each task order is scheduled and when the fieldwork has been completed.
• A draft report and site forms (if applicable) shall be submitted to the POC for comment no later than 45 days after completion of fieldwork per task order.
• The final report and site forms will be submitted to the POC no later than 15 days after receiving comments from the NRCS.
• Upon approval of the final report, NRCS will submit the final report and site forms to the SHPO for review and concurrence.
• Exceptions for delays due to weather will be allowed, though work must be accomplished as soon as the weather allows. The Contractor shall immediately notify the CO and POC if exceptions to the schedule or specified tasks are required.
The Contractor shall submit payment request via the Invoice Processing Platform (IPP).
Partial payment may be submitted following completion of fieldwork (50%), submission of draft report (25%) and upon NRCS receipt, approval, and acceptance of final deliverables (25%).
Part IV: Supporting Information
A. Confidentiality
Information generated from cultural resource surveys completed on behalf of the NRCS is classified as CONFIDENTIAL. Its distribution and use are restricted. Publication or disclosure of any part of this information is prohibited without the written permission of the NRCS.
B. Place of Performance
As stated previously, the Task Order consists of the work detailed above in the location(s) outlined in Appendix A.
C. Software and Communication
The contractor is expected to submit digital copies of all deliverables (draft and final) in the latest versions of Microsoft Word and Adobe Acrobat. The documents shall be provided in a format that is searchable. Original electronic copies shall be provided when feasible and not scanned versions of documents. Any maps created will have the pertinent information (latitude, longitude, date created, North arrow and scale provided in a clear and legible font size). GIS shapefiles will be provided along with the relevant deliverables of any boundaries or figures depicted in the APE maps that were created as part of the deliverable process.
The contractor shall communicate by email, phone and Microsoft Teams with NRCS employees regarding this contract.
D. Special Considerations
The Contractor must advise the NRCS if there are any access restrictions which could delay the work.
NRCS will work with the Contractor to resolve any access issues.
Technical cultural resource questions should be directed to the POC, Chistopher Null, at christopher.null@usda.gov. Contracting questions should be directed to the assigned Contracting Officer.
Changes to task order content, analysis approach, level of effort, schedules and deliverables shall be made in writing by a revision to the task order by the Contracting Officer. These changes must receive written approval from the Contracting Officer before the additional work is commenced. Camping on the project properties will not be allowed.
This is a firm-fixed-price contract.
Appendix A – Additional Information
Alternative 1 The PMC Renovation alternative includes a complete interior renovation of the existing seed building, construction of 4 new parking lots, concrete walkway, abandonment of existing sewer line, installation of 240 feet on new sewer line, installation of a new 2500-gallon septic system and 450 linear feet of leach pipe. There are other accompanying infrastructure and signage that will be installed to support this work along with minor temporary construction impacts.
Direct Impact Area The Area of Potential Effects for this proposed action is to be drafted with the assistance of the selected contractor (see SOW). The Direct Impact Area can be seen on the Construction Plans and is generally an area of approximately 3.38 acres. Alternative 1 includes a complete interior renovation of the existing seed building, construction of 4 new parking lots, concrete walkway, abandonment of existing sewer line, installation of 240 feet on new sewer line, installation of a new 2500-gallon septic system and 450 linear feet of leach pipe. There are other accompanying infrastructure and signage that will be installed to support this work along with minor temporary construction impacts.
Maps The exact construction details are in the 100% Construction Plans for this project. A generalized overview of the project area of impacts are included in Figure 1. The approximates limits of disturbance associated with this alternative are included in Figure 2.
A layer package with the relevant geospatial information that is displayed below is included in this package of information and is titled “Alternative 1.lpkx”. If there are any discrepancies between the figures and referenced geospatial information included in this appendix and the 100% Construction Plans, then the 100% Construction Plans are the correct source information to utilize.
Figure 1 Approximate location of impacts
Figure 2 Approximate limits of disturbance
Construction Plans 100% Drawings are available for Alternative 1. These drawings are located in the file titled
2024.07.22 NRCS Lockeford Seed Building – 100% Drawings.
PMC Manager Contact Info Margaret Smither-Kopperl. Ph. D.
Manager – Lockeford Plant Materials Center margaret.smither-kopperl@usda.gov mailto:margaret.smither-kopperl@usda.gov
SHEET INDEX
SHEET NUMBER SHEET NAME
GENERAL
G-001 COVER SHEET
CIVIL
C-001 CIVIL COVER
C-100 CIVIL SITE PLAN
C-101 SEPTIC DESIGN
C-200 GRADING PLAN
C-300 EROSION CONTROL PLAN
C-301 EROSION CONTROL DETAILS
C-400 SPECIFICATIONS
C-500 CIVIL DETAILS
LIFE SAFETY
LS101 CODE SUMMARY
LS102 FIRST FLOOR LIFE SAFETY PLAN
ARCHITECTURAL
A-001 SYMBOLS & ABBREVIATIONS
A-101 FIRST FLOOR AND DEMOLITION PLANS
A-102 FIRST FLOOR CEILING AND ROOF PLAN
A-201 BUILDING ELEVATIONS
A-401 ENLARGED PLANS AND ELEVATIONS
A-501 PARTITION TYPES
A-601 DOOR SCHEDULE AND DETAILS
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES AND SPECIFICATIONS
S-201 DEMO AND EXISTING FLOOR PLAN, PROPOSED NEW FLOOR PLAN
S-202 ROOF FRAMING PLAN
S-301 TYPICAL DETAILS
S-401 TYPICAL LIGHT GAGE METAL DETAILS
MECHANICAL
M-001 GENERAL MECHANICAL NOTES
M-002 GENERAL MECHANICAL LEGENDS
M-101 MECHANICAL PLANS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-701 MECHANICAL SCHEDULES
P-101 UNDERSLAB PLUMBING PLANS
P-102 PLUMBING PLANS
P-501 PLUMBING DETAILS
P-701 PLUMBING SCHEDULES
ELECTRICAL
E-001 ABBREVIATIONS, GENERAL SYMBOLS, AND SHEET INDEX
E-002 GENERAL NOTES
ED101 FIRST FLOOR DEMOLITION PLAN - LIGHTING
ED201 FIRST FLOOR DEMOLITION PLAN - POWER
ED301 FIRST FLOOR DEMOLITION PLAN - SYSTEMS
ED401 ENLARGED PLANS DEMOLITION
E-100 SITE PLAN - ELECTRICAL
E-101 FIRST FLOOR PLAN - LIGHTING
E-111 FIRST FLOOR PLAN - LIGHTING CONTROL
E-201 FIRST FLOOR PLAN - POWER
E-301 FIRST FLOOR PLAN - SYSTEMS
E-302 CONFERENCE ROOM AV DIAGRAM
E-401 ENLARGED PLANS
E-601 ONE-LINE
E-701 ELECTRICAL SCHEDULES
E-721 PANEL SCHEDULES
www.coffman.com
221 N. Wall Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
CEI PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
USDA NRCS LOCKEFORD
SEED BUILDING
21011 ELLIOT RD.
LOCKEFORD, CA 95237
/1
/2
:5
:0
P
M
7/22/2024
231226
G-001
COVER SHEET
100% CD
USDA NRCS LOCKEFORD SEED BUILDING
21011 ELLIOT RD.
LOCKEFORD,CA 95237
PROJECT LOCATION
AREA OF WORK
AREA MAP
VICINITY MAP
E
LLIO
TT R
D
REV DATE DESCRIPTION
ARCHITECTURAL:
KZF DESIGN
700 BROADWAY ST.
CINCINNATI, OH 45202
CONTACTS:
LYNN ZUCH
LYNN.ZUCH@KZF.COM
BOB SCHMITZ
BOB.SCHMITZ@KZF.COM
ENGINEERING:
COFFMAN ENGINEERS
221 N. WALL STREET
SPOKANE, WA 99201
CONTACTS:
CIVIL:
RAY BARRO
RAY.BARRO@COFFMAN.COM
LEXI BEEBE
LEXI.BEEBE@COFFMAN.COM
MECHANICAL:
TRACI HANEGAN
TRACI.HANEGAN@COFFMAN.COM
JENSEN RYE
JENSEN.RYE@COFFMAN.COM
ELECTRICAL:
MATTHEW VERHEUL
MATTHEW.VERHEUL@COFFMAN.COM
STRUCTURAL:
NIC RODRIGUEZ
NICOLAS.RODRIGUES@COFFMAN.COM
JEFFREY QUOCK
JEFFREY.QUOCK@COFFMAN.COM
FIRE PROTECTION:
TOM DEMASI
TOM.DEMASI@COFFMAN.COM
ESTIMATOR:
ISKANDER ASSOCIATES INC.
600 NORTH TUSTIN AVE. #130
SANTA ANA, CA 92660
ISKANDER ABDULLA
ISKANDER@ISKANDERINC.COM
SURVEYOR:
GUIDA SURVEYING, INC.
550 W. ALLUVIAL AVE., SUITE 109
FRESNO, CA 93711
CONSULTANT TEAM
SS SS
SS
SS
SS
SS
SS
NO
PA
RK
ING
SS
ELLIOTT ROAD
(E) SEED BUILDING
FFE = 72.25'
(E) SHOP
BUILDING
(E) GARAGE
(E)
GREEN
HOUSE
(E)
SHED
(E) SHED
(E) SHADE
STRUCTURE
(E) BUILDING
(E) PMC
BUILDING
REV DATE DESCRIPTION
CEI PROJ. NO.
DRAWN
CHECKED
DATE
SHEET OF
COFFMAN ENGINEERS INC.C
231226
7/22/2024
SHEET TITLE:
SHEET NO:
www.coffman.com ph 509.328.2994
10 N. Post Street, Suite 500 Spokane, WA 99201
USDA NRCS LOCKEFORD
SEED BUILDING
21011 ELLIOTT RD.
LOCKEFORD, CA 95237
100% CD
No. 68283
EXP. 9/30/25
C I V I L
STAT E OF CA L I FORN IA
RE
G
I S
TE
RED PROFESS I ONAL ENG
I NEER
RA
YMOND L . BARRO
LEGAL DESCRIPTION
PLAN NOTES:
1. REFER TO THE ARCHITECT'S PLANS FOR DETAILS REGARDING
THE BUILDING, WALLS, WALKWAYS, PAVING SURFACES,
DOWNSPOUTS & ROOF DRAIN LOCATIONS, AND PLANTINGS.
2. THE EXISTING BOUNDARY, TOPOGRAPHIC AND UTILITY
INFORMATION SHOWN IS BASED ON THE TOPOGRAPHIC SURVEY
TITLED "SURVEY DRAWING NAME" PREPARED BY SURVEYOR
COMPANY NAME, DATED XX/XX/XX. UTILITY INFORMATION MUST
BE FIELD VERIFIED BY CONTRACTOR PRIOR TO BEGINNING
CONSTRUCTION.
3. ALL EXISTING UTILITIES ARE NOT SHOWN ON THIS PLAN, REFER
TO ADDITIONAL CIVIL SHEETS FOR LOCATIONS OF WATER,
POWER, CABLE, PHONE AND GAS SERVICES AND MAIN LINES.
4. IF THERE ARE ANY DISCREPANCIES BETWEEN DIMENSIONS IN
DRAWING AND EXISTING CONDITIONS WHICH WILL AFFECT THE
WORK, THE CONTRACTOR SHALL BRING SUCH DISCREPANCIES
TO THE ATTENTION OF THE ENGINEER FOR ADJUSTMENT
BEFORE PROCEEDING WITH THE WORK. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR VERIFYING ALL DIMENSIONS,
ELEVATIONS, AND LOCATIONS FOR SITE WORK PER THE PLANS
AND FOR THE COORDINATION OF ALL TRADES,
SUBCONTRACTORS, AND PERSONS ENGAGED.
5. TOTAL DISTURBED AREA FOR THE PROJECT IS XX,XXX SF.
DATUM
THE BEARINGS SHOWN HEREON ARE
BASED ON THE BEARING BETWEEN POINT
10000 AND POINT 10001, BEING
N49°18'16"W, AS DERIVED BY REAL TIME
NETWORK MEASUREMENT BASED UPON
THE CALIFORNIA COORDINATE SYSTEM
1983 (CCS83), ZONE III, NORTH AMERICAN
DATUM OF 1983 (NA2011, EPOCH 2011.00)
TOPOGRAPHIC SURVEY BY GUIDA
SURVEYING, INC. DATED 10/14/2021
ADDITIONAL TOPOGRAPHIC DATA BY
GUIDA SURVEYING, INC. DATED
NOVEMBER 2023.
BOUNDARY EXHIBIT BY GUIDA
SURVEYING, INC. DATED MAY 2024.
REFERENCES
BENCHMARKS
ELEVATIONS SHOWN HEREON ARE BASED
ON THE BENCH MARK L1106: BRASS DISK
LOCATED IN A MASSIVE STRUCTURE 1.55
MILES EAST ALONG THE STATE HIGHWAY
12 FROM THE LOCKEFORD POST OFFICE,
AT THE CROSSING OF A STEEL TOWER
POWER TRANSMISSION LINE, IN THE TOP
OF THE SOUTH CONCRETE FOUNDATION
FOR THE SOUTH LEG OF THE FIRST STEEL
TOWER NORTHWEST OF THE HIGHWAY, 47
FEET NORTHWEST OF THE CENTERLINE
OF THE HIGHWAY, 0.2 FEET SOUTH OF THE
SOUTH STEEL LEG, AND ABOVE LEVEL
WITH THE HIGHWAY.
ELEVATION (1986): 112.00
PUT LEGAL DESCRIPTION HERE (USUALLY
FOUND ON THE SURVEY DRAWING)
AB - AGGREGATE BASE
AC - ASPHALT CONCRETE
AD - AREA DRAIN
ASPH - ASPHALT
BC - BEGINNING OF CURVE
BLDG - BUILDING
BM - BENCH MARK
BOE - BOTTOM OF EXCAVATION
BW - BOTTOM OF WALL
CB - CATCH BASIN
C&G - CURB AND GUTTER
CL - CENTERLINE
CO - CLEANOUT
CONC - CONCRETE
COS - CITY OF SEATTLE
CW - CONCRETE WALK
CY - CUBIC YARD
DC - DROP CONNECTION
DEMO - DEMOLISH
DI - DROP INLET
DIP - DUCTILE IRON PIPE
DOM - DOMESTIC
DS - DOWNSPOUT
DWY - DRIVEWAY
E - EAST
EA - EACH
EC - END OF CURVE
ECD - ELECTRICAL CONDUIT
EL, ELEV - ELEVATION
ELEC - ELECTRICAL
EOP - EDGE OF PAVEMENT
EP - EDGE OF PAVEMENT
ESC - EROSION & SEDIMENT
CONTROL
ESMT - EASEMENT
EX, (E) - EXISTING
FC - FACE OF CURB
FF - FINISHED FLOOR
FFE - FINISHED FLOOR ELEVATION
FG - FINISHED GRADE
FH - FIRE HYDRANT
FL - FLOWLINE
FS - FINISHED SURFACE
FT - FEET
G - GAS
GB - GRADE BREAK
GM - GAS METER
GUY - GUY ANCHOR
GV - GAS VALVE
H - HORIZONTAL
HB - HOSE BIBB
HDPE- - HIGH DENSITY POLYETHYLENE
HH - HANDHOLE
HP - HIGH POINT
HYD - HYDRANT
ID - INSIDE DIAMETER
IE - INVERT ELEVATION
INL - INLET
INV - INVERT
JB - JUNCTION BOX
JT - JOINT TRENCH
LF - LINEAL FEET
LOC - LOCATION
LP - LOW POINT
LS - LANDSCAPING
MAX - MAXIMUM
MH - MANHOLE
MIN - MINIMUM
MON - MONUMENT
(N) - NEW
O.C. - ON CENTER
P - POWER
PERF - PERFORATED
PIV - POST INDICATOR VALVE
PL - PROPERTY LINE
PM - POWER METER
PP - POWER POLE
PSD - PUBLIC STORM DRAIN
PSS - PUBLIC SANITARY SEWER
POC - POINT OF CONNECTION
PVC - POLYVINYLCHLORIDE
PVMT - PAVEMENT
R - RADIUS
RIM - RIM ELEVATION
R/W - RIGHT-OF-WAY
S - SOUTH, SEWER, SLOPE
SAN - SANITARY
SD - STORM DRAIN
SHT - SHEET
SNS - STREET NAME SIGN
SQ - SQUARE
SS - SANITARY SEWER
SSCO - SANITARY SEWER CLEANOUT
SSMH - SANITARY SEWER MANHOLE
ST - STREET
STA - STATION
STD - STANDARDS
T - TELEPHONE
TBM - TEMPORARY BENCH MARK
TC -
TEL - TELEPHONE
TESC - TEMPORARY EROSION AND
SEDIMENTATION CONTROL
TD - TELEPHONE DUCT
TP - TOP OF PAVEMENT
TYP - TYPICAL
UP - UNDERGROUND POWER
V - VERTICAL
VB - VERTICAL BEND
W - WATER
WM - WATER METER
WS - WATER SERVICE
WV - WATER VALVE
YD - YARD DRAIN
ABBREVIATIONS
JT
P
G
FW
SS
SUB
DESCRIPTIONPROPOSED
LEGEND
SD
EXISTING
JT
P
G
FW
SS
SD
CENTERLINE
EASEMENT LINE
PROPERTY LINE
RETAINING WALL
SUBDRAIN LINE
STORM DRAIN LINE
SANITARY SEWER LINE
OVERHEAD ELECTRIC
WATER LINE
FIRE WATER
GAS LINE
PRESSURE LINE
JOINT TRENCH
SET BACK LINE
CONCRETE VALLEY GUTTER
EARTHEN SWALE
CATCH BASIN
JUNCTION BOX
AREA DRAIN
STORM DRAIN MANHOLE
FIRE HYDRANT
SANITARY SEWER MANHOLE
STREET SIGN
SPOT ELEVATION
FLOW DIRECTION
BENCHMARK
CONTOURS
TREE TO BE REMOVED
XX.XX XX.XX
OHEOHE
WW
R
Know what's below.
before you dig.Call
UTILITY STATEMENT
LOCATION OF EXISTING UNDERGROUND
UTILITIES HAVE BEEN TAKEN FROM
DRAWINGS AND FIELD LOCATES SUPPLIED BY
THE APPROPRIATE UTILITY COMPANIES.
UTILITY LOCATIONS SHOWN ON THIS
DRAWING ARE APPROXIMATE ONLY. PRIOR
TO BEGINNING ANY CONSTRUCTION, THE
CONTRACTOR SHALL VERIFY THE EXACT
LOCATION OF EACH UTILITY.
THE EXISTING INFORMATION SHOWN ON THESE
PLANS IS PER THE SURVEY COMPLETED BY:
DATED: ___________.
THE CONTRACTOR SHALL VERIFY EXISTING
SITE CONDITIONS AND CONTACT THE
ENGINEER IF DISCREPANCIES ARE NOTED.
GUIDA SURVEYING INC.
444 W. OCEAN BOULEVARD, SUITE 800
LONG BEACH, CA 90802
562.637.2306
SEPT. 2021
SITE PLAN
SCALE" 1"=50'
RB
LB
CIVIL COVER
C-001 http://www.coffman.com http://www.coffman.com http://www.coffman.com http://www.coffman.com http://www.coffman.com AutoCAD SHX Text
XX" TREE
AutoCAD SHX Text
CB
AutoCAD SHX Text
JB
AutoCAD SHX Text
AD
AutoCAD SHX Text
SDMH
AutoCAD SHX Text
SSMH
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
CB
AutoCAD SHX Text
JB
AutoCAD SHX Text
AD
AutoCAD SHX Text
SDMH
AutoCAD SHX Text
SSMH
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
SSCO
SS
SS
SS
SS
SS
SS SS SS
SS
SS
SS
SS
SS
NO
PA
RK
ING
SSCO
SSCO
SSCO
SSCO
SSCO
SS
(E) DOMESTIC WELL
DN
SS
SS
SS
SS
SS
(E) SEED BUILDING
FFE = 72.25'
(6) 9'X20' PARKING
STALLS
(6) 9'X20' PARKING
STALLS
(4) 9'X20' PARKING
STALLS
(E) SHOP
BUILDING
(E) GARAGE
(E) PMC BUILDING
(E)
GREEN
HOUSE
(E) SHED
(E) SHED
(E) SHADE
STRUCTURE
(E) BUILDING
(E) MOON TREE
APPROXIMATE
LOCATION (E)
ELECTRICAL POLE
APPROXIMATE
LOCATION (E)
LEACH LINES
(E) MOON TREE
APPROXIMATE
LOCATION (E)
ELECTRICAL POLE
APPROXIMATE
LOCATION (E)
LEACH LINES
APPROXIMATE
LOCATION (E)
LEACH LINES
SEE SHEET C-101 FOR
SEPTIC SYSTEM DESIGN
2500 GALLON
TWO COMPARTMENT
SEPTIC TANK
DISTRIBUTION
BOX
(E) FENCE
(E) GRAVEL ROAD
(E) STORAGE BIN
APPROXIMATE
LOCATION (E) SS PIPE
FROM (E) SEED
BUILDING TO BE
ABANDONED
(CONTRACTOR TO VIF)
43.1'
16.8'
(E) 342' FIRE
DEPARTMENT
ACCESS LANE
(TO REMAIN)
.1
.4
12.0'
18.3'
(E) CLEARANCE
(TO REMAIN)
19.1'
(E) ACCESS
GATE
(1) VAN
ACCESSIBLE
ADA STALL &
ACCESS AISLE
17.4'
EQUIPMENT PAD REFER TO
STRUCTURAL AND MECHANICAL
FOR DETAIL
APPROXIMATE LOCATION (E) SS
PIPE FROM (E) GARAGE) TO REMAIN
(E) PMC
BUILDING
18.8'
6.8'
REV DATE DESCRIPTION
CEI PROJ. NO.
DRAWN
CHECKED
DATE
SHEET OF
COFFMAN ENGINEERS INC.C
231226
7/22/2024
SHEET TITLE:
SHEET NO:
www.coffman.com ph 509.328.2994
10 N. Post Street, Suite 500 Spokane, WA 99201
USDA NRCS LOCKEFORD
SEED BUILDING
21011 ELLIOTT RD.
LOCKEFORD, CA 95237
100% CD
No. 68283
EXP. 9/30/25
C I V I L
STAT E OF CA L I FORN I A
RE
G
I S
TE
RED PROFESS IONAL ENG
I NEER
Know what's below.
before you dig.Call
R
UTILITY STATEMENT
LOCATION OF EXISTING UNDERGROUND
UTILITIES HAVE BEEN TAKEN FROM
DRAWINGS AND FIELD LOCATES SUPPLIED BY
THE APPROPRIATE UTILITY COMPANIES.
UTILITY LOCATIONS SHOWN ON THIS
DRAWING ARE APPROXIMATE ONLY. PRIOR
TO BEGINNING ANY CONSTRUCTION, THE
CONTRACTOR SHALL VERIFY THE EXACT
LOCATION OF EACH UTILITY.
603030 15
FEETSCALE:
1 INCH = 30
APPROXIMATE DISTURBED AREA = 10,255 SF
QUANTITIES:
CONCRETE = 540 SF @ 4" THICK = 7 CY
GRAVEL = 3,300 SF @ 12" THICK = 122 CY
4" PVC SEWER LATERAL = 240 LF
LEACH PIPE TOTAL LENGTH = 450 LF
LEGEND
CONCRETE
GRAVEL
(E) TREE
PROPERTY LINE
(E) FENCE
(E) LEACH LINE
SEWER LINE
CIVIL SITE NOTES (1-10)
ONE (1) VAN ADA PARKING STALL WITH ACCESS AISLE PER SAN JOAQUIN
COUNTY REQUIREMENTS. SEE DETAIL 1 ON SHEET C-500.
REQUIRED PARKING PER ZONING = 16 STALLS PER DETAIL 2 ON SHEET C-500.
PROPOSED CONCRETE WALKWAY PER DETAIL 2 ON SHEET C-500.
INSTALL SIGNAGE INDICATING TO WATCH FOR PEDESTRIANS AND MAXIMUM
SPEED LIMIT OF 5 MPH.
RB
LB
CIVIL SITE PLAN
C-100
THE EXISTING INFORMATION SHOWN ON THESE
PLANS IS PER THE SURVEY COMPLETED BY:
DATED: ___________.
THE CONTRACTOR SHALL VERIFY EXISTING
SITE CONDITIONS AND CONTACT THE
ENGINEER IF DISCREPANCIES ARE NOTED.
GUIDA SURVEYING INC.
444 W. OCEAN BOULEVARD, SUITE 800
LONG BEACH, CA 90802
562.637.2306
SEPT. 2021
SS
SS
1. ALL WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE LATEST
STANDARD SPECIFICATIONS FOR PUBLIC WORKS.
2. ANY EXISTING INFRASTRUCTURE, SITE FEATURES, OR PROPERTY DAMAGED AS
A RESULT OF CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR TO
THE SATISFACTION OF THE APPROPRIATE AGENCY.
3. ALL CONSTRUCTION SHALL CONFORM TO APPLICABLE STATE AND/OR LOCAL
CODES. THE CONTRACTOR SHALL HAVE A COPY OF CURRENT CODES
MAINTAINED ON SITE AT ALL TIMES.
4. ALL SIGNAGE AND PAINT MARKINGS SHALL COMPLY WITH THE MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), OR AS OTHERWISE SPECIFIED.
INSTALLATION OF SIGNS SHALL BE GOVERNED BY LOCAL CODES.
5. THE CONTRACTOR IS RESPONSIBLE TO LOCATE AND PROTECT ALL EXISTING
UTILITIES DURING CONSTRUCTION. THE CONTRACTOR IS TO NOTIFY THE
UTILITY PROTECTION CENTER AT LEAST 72 HOURS PRIOR TO ANY SITE WORK
FOR PROPER IDENTIFICATION OF EXISTING UTILITIES.
6. THE CONTRACTOR SHALL VERIFY ALL EXISTING ITEMS AND DIMENSIONS TO
REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO BEGINNING
CONSTRUCTION.
7. UNLESS OTHERWISE NOTED, PAVEMENT ELEVATION IS 6" BELOW THE TOP OF
CURB ELEVATION.
8. ALL GRADE BREAKS SHALL BE CONSTRUCTED AS A VERTICAL CURVE TO AVOID
ANY DEFINED CRESTS OR SUMPS.
9. ALL DIMENSIONS ARE SHOWN TO FACE OF CURB UNLESS OTHERWISE NOTED.
GENERAL NOTES
1. EXISTING 19' WIDE GATE TO REMAIN.
2. EXISTING FIRE DEPARTMENT ACCESS ROAD TO REMAIN.
FIRE NOTES
http://www.coffman.com http://www.coffman.com http://www.coffman.com http://www.coffman.com
SS
SS
SS
SS
SS
SS SS SS
SS
SS
SS
SS
SS
NO
PA
RK
ING
SSCO
SSCO
SSCO
SSCO
SSCO
SS
(E) DOMESTIC WELL
DN
SS
SS
SS
SS
SS
(E) SEED BUILDING
FFE = 72.25'
(E) SHOP
BUILDING
(E) GARAGE
(E)
GREEN
HOUSE
(E) SHED
(E) SHED
(E) SHADE
STRUCTURE
(E) BUILDING
APPROXIMATE
LOCATION (E)
LEACH LINES
CONNECT TO BUILDING
WASTE LINE AND INSTALL
SSCO. SEE PLUMBING
PLANS FOR CONTINUATION
I.E.=68.79
4" SCH 40 PVC SS
L=240'
S=1% MIN.
2500 GALLON
TWO COMPARTMENT
SEPTIC TANK
15'-0" X 7'-0"
4" I.E. IN = 65.50
4" I.E. OUT = 65.35
100' WATER
WELL SETBACK
APPROXIMATE
LOCATION (E)
LEACH LINES
DISTRIBUTION BOX
2'-0" X 2'-0"
90.0'(5) 90' LONG LEACH LINES
SPACED @ 10' APART
4" ABS SCHEDULE 40
SEALED PER OWTS
(E) FENCE
(E) GRAVEL ROAD
(E) STORAGE BIN
67.70 FG
65.20 INV
67.70 FG
65.20 INV
68.37 RIM
66.09 INV
68.83 RIM
66.32 INV
71.30 RIM
68.60 INV
69.49 RIM
67.16 INV
(E) ACCESS
GATE(E) PMC
BUILDING
REV DATE DESCRIPTION
CEI PROJ. NO.
DRAWN
CHECKED
DATE
SHEET OF
COFFMAN ENGINEERS INC.C
231226
7/22/2024
SHEET TITLE:
SHEET NO:
www.coffman.com ph 509.328.2994
10 N. Post Street, Suite 500 Spokane, WA 99201
USDA NRCS LOCKEFORD
SEED BUILDING
21011 ELLIOTT RD.
LOCKEFORD, CA 95237
100% CD
No. 68283
EXP. 9/30/25
C I V I L
STAT E OF CA L I FORN I A
RE
G
I S
TE
RED PROFESS I ONAL ENG
I NEER
R
UTILITY STATEMENT
LOCATION OF EXISTING UNDERGROUND
UTILITIES HAVE BEEN TAKEN FROM
DRAWINGS AND FIELD LOCATES SUPPLIED BY
THE APPROPRIATE UTILITY COMPANIES.
UTILITY LOCATIONS SHOWN ON THIS
DRAWING ARE APPROXIMATE ONLY. PRIOR
TO BEGINNING ANY CONSTRUCTION, THE
CONTRACTOR SHALL VERIFY THE EXACT
LOCATION OF EACH UTILITY.
603030 15
FEETSCALE:
1 INCH = 30
RB
LB
SEPTIC DESIGN
C-101
THE EXISTING INFORMATION SHOWN ON THESE
PLANS IS PER THE SURVEY COMPLETED BY:
DATED: ___________.
THE CONTRACTOR SHALL VERIFY EXISTING
SITE CONDITIONS AND CONTACT THE
ENGINEER IF DISCREPANCIES ARE NOTED.
GUIDA SURVEYING INC.
444 W. OCEAN BOULEVARD, SUITE 800
LONG BEACH, CA 90802
562.637.2306
SEPT. 2021
OWNER'S INFORMATION: USDA NRCS LOCKEFORD, 21011 ELLIOTT ROAD, LOCKEFORD, CA 95237
STREETS/ROADS FRONTING THE PROPERTY: ELLIOTT ROAD
GENERAL SPECIFICATIONS
1. THE SEPTIC TANK SHALL BE A 2500 GALLON TWO-COMPARTMENT SEPTIC TANK. THE TANK SHALL BE
APPROVED COMMERCIALLY CONSTRUCTED TANK MANUFACTURED MEETING THE REQUIREMENTS OF THE
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT.
2. THE DISPERSAL FIELD TRENCHES SHALL BE EXCAVATED IN THE AREA AND AT THE DEPTH SHOWN ON THE PLANS OR AS NOTED IN FIELD STAKING. THE BOTTOM OF THE TRENCHES SHALL BE LEVEL, TAKING CARE NOT TO COMPACT THE SOIL DURING EXCAVATION. THE DISPERSAL FIELD TRENCH SHALL BE FILLED WITH DRAINROCK TO THE DEPTH SHOWN IN THE PLANS. DRAINROCK SHALL BE CLEAN WASHED GRAVEL RANGING
IN SIZE FROM 1" TO 2.5" IN DIAMETER.
3. PRIOR TO BACKFILLING THE DRAINFIELD TRENCH, THE SYSTEM MUST BE TESTED TO ASSURE UNIFORM DISTRIBUTION THROUGHOUT THE TRENCH AND TO DETERMINE THE PRESENCE OF ANY OCCLUSIONS IN THE
LATERALS.
4. ALL WASTEWATER PIPES ENTERING OR LEAVING THE TANK SHALL FORM A WATERTIGHT SEAL WITH THE
CONCRETE WALLS.
5. INSPECTION OF THE SYSTEM BY SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT IS REQUIRED DURING CONSTRUCTION. THE SYSTEM SHALL NOT BE BACKFILLED UNTIL THE SEPTIC TANK AND
ALL PIPING HAVE BEEN INSPECTED BY BOTH SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH
DEPARTMENT.
6. TESTING NOTES PER SAN JOAQUIN COUNTY OWTS STANDARDS.
7. THE OWTS SHALL BE OPERATED AND MAINTAINED PER SAN JOAQUIN COUNTY OWTS STANDARDS.
NOTES
1. ALL ONSITE WASTEWATER TREATMENT SYSTEMS (OWTS) SHALL CONFORM TO THE REQUIREMENTS OF THE
WATER QUALITY CONTROL POLICY FOR SITING, DESIGN, OPERATION, AND MAINTENANCE OF ONSITE
WASTEWATER TREATMENT SYSTEMS POLICY, THE SAN JOAQUIN COUNTY ONSITE WASTEWATER
TREATMENT SYSTEMS LOCAL AGENCY MANAGEMENT PROGRAM (LAMP), TITLE 9 OF THE ORDINANCE CODE
OF SAN JOAQUIN COUNTY, AND THESE STANDARDS.
2. INSTALLER SHALL SET SEPTIC TANK SO AS TO ASSURE GRAVITY FLOW FROM THE BUILDING (MINIMUM 1%
SLOPE).
3. EXISTING AND PROPOSED UTILITIES MAY NOT BE SHOWN. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES. CALL THE UNDERGROUND UTILITY LOCATION SERVICE AT 811 BEFORE YOU DIG. ANY CONFLICTING UTILITIES SHALL BE RELOCATED PRIOR TO
CONSTRUCTION.
4. IF THE INSTALLER DISCOVERS ANY DISCREPANCIES BETWEEN THE PLANS AND EXISTING CONDITIONS
ENCOUNTERED, THE INSTALLER SHALL IMMEDIATELY NOTIFY THE DESIGN ENGINEER.
5. THESE PLANS ARE SCHEMATIC AND ARE NOT INTENDED TO DEPICT ALL DETAILS OF THE WORK REQUIRED.
THE INSTALLER SHALL BE RESPONSIBLE TO BE FAMILIAR WITH ACTUAL SITE CONDITIONS AND FACTORS
AFFECTING THE WORK.
6. GRADING SHALL BE DONE IN SUCH A MANNER THAT ALL DRAINAGE IS DIVERTED AWAY FROM THE
DRAINFIELD. NO DRAINAGE SHALL POND NEAR THE DRAINFIELD.
COMMERCIAL ONSITE WASTEWATER TREATMENT SYSTEM (OWTS) SIZING
TYPE OF ESTABLISHMENT - PUBLIC GATHERING SPACE FOR 100 OCCUPANTS (AT 10 GAL PER PERSON)
SOIL TYPE - SILTY SAND (PER GEOTECH REPORT BY WALLACE KUHL AND ASSOCIATES DATED
OCTOBER 29, 2021)
1. SEPTIC TANK SIZING
BASE TANK CAPACITY (BTC) = 1,200 GALLONS + ADF
BTC = 1,200 GAL + 10 GAL/PER * 100 PER = 2,200 GALLONS
2,500 GALLON OLDCASTLE SEPTIC TANK
2. LATERALS
PIPE TYPE - 4" SCH 40 PVC OR OTHER APPROVED EQUAL
LATERAL LENGTH - 240'
3. LEACH LINE SIZING
PIPE TYPE - 4" PVC PERFORATED PIPE OR OTHER APPROVED MATERIAL
[BTC + AVERAGE DAILY FLOW (ADF) ]* SOIL FACTOR
[1,200 GALLONS + 1,000 ADF ] *0.20 = 440 LF LEACH LINE REQUIRED (450 LF PROVIDED)
FILTER BED SIZING = 440 LF X 3 = 1320 SF MIN. REQUIRED
PERCOLATION TESTING SHOULD BE PERFORMED ACCORDING TO THE SAN JOAQUIN COUNTY OWTS
MANUAL PRIOR TO INSTALLATION IN ORDER TO CONFIRM ASSUMPTIONS AND SYSTEM DESIGN ARE
CONSISTENT WITH ACTUAL SITE CONDITIONS.
LEGEND
CONCRETE
GRAVEL
(E) TREE
PROPERTY LINE
(E) FENCE
(E) LEACH LINE
SEWER LINE
SS
SS
SEPTIC NOTES (11-20)
INSTALL (N) 4" DIAMETER SANITARY SEWER LATERAL SLOPED AT 1%
MINIMUM. PROVIDE CLEANOUT TO GRADE AT BUILDING AND BEHIND
PROPERTY LINE AND AT MAJOR CHANGES IN DIRECTION AND EVERY 90
FEET AND 45° BEND. REFER TO DETAIL 4 ON SHEET C-500 FOR TRENCH
DETAIL. REFER TO DETAIL 6 ON SHEET C-500 FOR CLEANOUT.
INSTALL 2,500 GALLON MINIMUM SEPTIC TANK. REFER TO OLDCASTLE
CST-2500-2 ON SHEET C-500.
INSTALL DISTRIBUTION BOX PER OLDCASTLE DB-9 ON SHEET C-500.
http://www.coffman.com http://www.coffman.com http://www.coffman.com
NO
PA
RK
ING
SS
SS
SS
(72.25 FG)
5.
0'
5.0'
DOCK
(N) CONFERENCE
ROOM DOOR
ACCESS
18.0'
8.
0'
9.
0'
4.9'
17.5'
72.18 FG (72.10) FS
CONFORM
(72.08) FS
CONFORM
71.98 FS
1.0%
(72.19) FS
CONFORM
(72.5±) FS
CONFORM1.1%
(72.06) FS
CONFORM
1.
0%
1.
5%
(72.34) FS
CONFORM
72.22 FS
1.
5%
(72.24) FS
CONFORM
(N) EQUIPMENT PADS
SEE STRUCTURAL AND
MECHANICAL PLANS
Know what's below.
before you dig.Call
R
UTILITY STATEMENT
LOCATION OF EXISTING UNDERGROUND
UTILITIES HAVE BEEN TAKEN FROM
DRAWINGS AND FIELD LOCATES SUPPLIED BY
THE APPROPRIATE UTILITY COMPANIES.
UTILITY LOCATIONS SHOWN ON THIS
DRAWING ARE APPROXIMATE ONLY. PRIOR
TO BEGINNING ANY CONSTRUCTION, THE
CONTRACTOR SHALL VERIFY THE EXACT
LOCATION OF EACH UTILITY.
THE EXISTING INFORMATION SHOWN ON THESE
PLANS IS PER THE SURVEY COMPLETED BY:
DATED: ___________.
THE CONTRACTOR SHALL VERIFY EXISTING
SITE CONDITIONS AND CONTACT THE
ENGINEER IF DISCREPANCIES ARE NOTED.
GUIDA SURVEYING INC.
444 W. OCEAN BOULEVARD, SUITE 800
LONG BEACH, CA 90802
562.637.2306
SEPT. 2021 201010 5
FEETSCALE:
1 INCH = 10
REV DATE DESCRIPTION
CEI PROJ. NO.
DRAWN
CHECKED
DATE
SHEET OF
COFFMAN ENGINEERS INC.C
231226
7/22/2024
SHEET TITLE:
SHEET NO:
www.coffman.com ph 509.328.2994
10 N. Post Street, Suite 500 Spokane, WA 99201
USDA NRCS LOCKEFORD
SEED BUILDING
21011 ELLIOTT RD.
LOCKEFORD, CA 95237
100% CD
No. 68283
EXP. 9/30/25
C I V I L
STAT E OF CA L I FORN I A
RE
G
I S
TE
RED PROFESS I ONAL ENG
I NEER
RB
LB
GRADING PLAN
C-200
BUILDING FFE = 72.25
LEGEND
CONCRETE
GRAVEL
(E) TREE
PROPERTY LINE
(E) FENCE
(E) LEACH LINE
SEWER LINE
SS
SS
http://www.coffman.com http://www.coffman.com http://www.coffman.com
SS
SS
SS
SS
SS
SS SS SS
SS
SS
SS
SS
SS
NO
PA
RK
ING
SSCO
SSCO
SSCO
SSCO
SSCO
SS
SS
SS
SS
SS
SS
(E) MOON TREE
(E) SEED BUILDING
(E) SHOP
BUILDING
(E) GARAGE
(E) PMC BUILDING
(E)
GREEN
HOUSE
(E) SHED
(E) SHED
(E) SHADE
STRUCTURE
(E) BUILDING
TC1
WM8
X
X
X
X
X
X
X X
SE5
XXXXXX
X
X
X
X X
SE5
SE5
SE5
X
REV DATE DESCRIPTION
CEI PROJ. NO.
DRAWN
CHECKED
DATE
SHEET OF
COFFMAN ENGINEERS INC.C
231226
7/22/2024
SHEET TITLE:
SHEET NO:
www.coffman.com ph 509.328.2994
10 N. Post Street, Suite 500 Spokane, WA 99201
USDA NRCS LOCKEFORD
SEED BUILDING
21011 ELLIOTT RD.
LOCKEFORD, CA 95237
100% CD
No. 68283
EXP. 9/30/25
C I V I L
STAT E OF CA L I FORN I A
RE
G
I S
TE
RED PROFESS I ONAL ENG
I NEER
R
UTILITY STATEMENT
LOCATION OF EXISTING UNDERGROUND
UTILITIES HAVE BEEN TAKEN FROM
DRAWINGS AND FIELD LOCATES SUPPLIED BY
THE APPROPRIATE UTILITY COMPANIES.
UTILITY LOCATIONS SHOWN ON THIS
DRAWING ARE APPROXIMATE ONLY. PRIOR
TO BEGINNING ANY CONSTRUCTION, THE
CONTRACTOR SHALL VERIFY THE EXACT
LOCATION OF EACH UTILITY.
603030 15
FEETSCALE:
1 INCH = 30
THE EXISTING INFORMATION SHOWN ON THESE
PLANS IS PER THE SURVEY COMPLETED BY:
DATED: ___________.
THE CONTRACTOR SHALL VERIFY EXISTING
SITE CONDITIONS AND CONTACT THE
ENGINEER IF DISCREPANCIES ARE NOTED.
GUIDA SURVEYING INC.
444 W. OCEAN BOULEVARD, SUITE 800
LONG BEACH, CA 90802
562.637.2306
SEPT. 2021
EROSION AND SEDIMENT CONTROL BMP NOTES
1. THIS PLAN MAY NOT COVER ALL THE SITUATIONS OR PHASES THAT ARISE DURING CONSTRUCTION DUE TO
UNANTICIPATED FIELD CONDITIONS. IN GENERAL, THE CONTRACTOR IS RESPONSIBLE FOR KEEPING SEDIMENT STORM RUNOFF FROM LEAVING THE SITE. SEDIMENT ROLLS AND SILT FENCES SHALL BE USED BY THE CONTRACTOR ON AN AS NEEDED BASIS TO INHIBIT SILT FROM LEAVING THE SITE AND ENTERING THE STORM DRAIN SYSTEM. TEMPORARY EROSION CONTROL DEVICES SHOWN ON GRADING PLAN WHICH INTERFERE WITH THE WORK SHALL BE RELOCATED OR MODIFIED WHEN THE INSPECTOR SO DIRECTS AS THE
WORK PROGRESSES.
2. EROSION CONTROL FACILITIES SHALL BE MAINTAINED DAILY. THESE FACILITIES SHALL CONTROL AND CONTAIN EROSION-CAUSED SILT DEPOSITS AND PROVIDE FOR THE SAFE DISCHARGE OF SILT FREE STORM WATER INTO EXISTING AND PROPOSED STORM DRAIN FACILITIES. DESIGN OF THESE FACILITIES MUST BE
APPROVED AND UPDATED EACH YEAR BY THE ENGINEER (OCTOBER 1 TO APRIL 15).
3. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN
ACCORDANCE WITH CITY STANDARD.
4. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL SUB-CONTRACTOR AND SUPPLIERS ARE AWARE OF ALL STORM WATER QUALITY MEASURES AND IMPLEMENT SUCH MEASURES. FAILURE TO COMPLY WITH THE APPROVED CONSTRUCTION WILL RESULT IN THE ISSUANCE OF CORRECTION NOTICES, CITATIONS, AND / OR A PROJECT STOP ORDER.
5. THE SITE SHALL BE MAINTAINED SO AS TO MINIMIZE SEDIMENT LADEN RUNOFF TO ANY STORM DRAIN
SYSTEM.
6. DURING THE RAINY SEASON, ALL PAVED AREAS WITH SPOILS STORAGE SHALL BE PROTECTED AND COVERED. THE SITE IS TO BE MAINTAINED SO AS TO MINIMIZE SEDIMENT RUNOFF TO ANY STORM DRAIN
SYSTEM.
7. DURING PERIODS WHEN STORMS ARE FORECAST:
A. EXCAVATED SOILS SHOULD NOT BE PLACED IN STREETS OR ON PAVED AREAS.
B. ANY EXCAVATED SOILS SHOULD BE REMOVED FROM THE SITE BY THE END OF DAY.
C. WHERE STOCKPILING IS NECESSARY, USE A TARPAULIN OR SURROUND THE STOCKPILE WITH FIBER
ROLLS, GRAVEL SEDIMENT BARRIER, SILT FENCE, OR OTHER RUNOFF CONTROLS.
D. USE INLET CONTROLS AS NEEDED (E.G. BLOCK AND GRAVEL SEDIMENT BARRIER) FOR STORM DRAIN
ADJACENT TO THE PROJECT SITE OR STOCKPILED SOIL.
8. THOROUGHLY SWEEP ALL PAVED AREAS EXPOSED TO SOIL EXCAVATION AND PLACEMENT.
9. STAND-BY CREWS SHALL BE ALERTED BY THE OWNER OR CONTRACTOR FOR EMERGENCY WORK DURING
RAINSTORMS.
10. AFTER OCTOBER 1ST TO APRIL15TH, ALL EROSION CONTROL MEASURES WILL BE INSPECTED DAILY AND
AFTER EACH STORM.
11. BORROW AREAS AND TEMPORARY STOCKPILES SHALL BE PROTECTED WITH APPROPRIATE EROSION
CONTROL MEASURES TO THE SATISFACTION OF THE ENGINEER.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING SAFETY OF VEHICLES OPERATING IN ROADWAY
ADJACENT TO EROSION CONTROL FACILITY.
13. DUST CONTROL SHOULD BE PRACTICED ON ALL CONSTRUCTION SITES WITH EXPOSED SOILS AS NEEDED. IT IS IMPORTANT IN WINDY OR WIND-PRONE AREAS. DUST CONTROL IS CONSIDERED A TEMPORARY MEASURE AND AS INTERMEDIATE TREATMENT BETWEEN SITE DISTURBANCE AND CONSTRUCTION, PAVING, OR
REVEGETATION. REFER TO CASQA BMP HANDBOOK.
EROSION AND SEDIMENT CONTROL BMP MAINTENANCE NOTES
1. USE FIBER ROLL ALONG CONTOURS OF SHORT SLOPES OR SLOPES 3:1 OR FLATTER, KEYED INTO GROUND
AT LEAST 3” DEEP (TYPICALLY 25' APART).
2. INSTALL SILT FENCE ALONG CONTOURS AS SECONDARY MEASURE TO KEEP SEDIMENT ONSITE AND TO MINIMIZE VEHICLE AND FOOT TRAFFIC BEYOND LIMITS OF SITE DISTURBANCE. SILT FENCING MUST BE KEYED
IN.
3. CONSTRUCT A CONCRETE WASHOUT SITE ADJACENT TO STABILIZED ENTRANCE. CLEAN AS NEEDED AND
REMOVE AT END OF PROJECT.
4. COVER ALL STOCKPILES AND LANDSCAPE MATERIAL AND BERM PROPERLY WITH STRAW WATTLES OR SAND BAGS. KEEP BEHIND SILT FENCE, AWAY FROM WATER BODIES. HAZARDOUS MATERIALS AND REFUSE MUST BE KEPT IN CLOSED CONTAINERS THAT ARE COVERED AND UTILIZE SECONDARY CONTAINMENT, NOT
DIRECTLY ON SOIL.
5. USE PEA-GRAVEL BAGS, (OR SIMILAR PRODUCT) AROUND DRAIN INLETS LOCATED BOTH ONSITE AND IN
GUTTER AS A LAST LINE OF DEFENSE.
6. PLACE PORT-A-POTTY WITH SECONDARY CONTAINMENT, BEHIND THE CURB AND AWAY FROM GUTTERS, STORM DRAIN INLETS, AND WATER BODIES.
7. COVER ALL EXPOSED SOIL WITH STRAW MULCH AND TACKIFIER (OR EQUIVALENT).
8. EXISTING VEGETATION SHOULD BE PRESERVED AS MUCH AS POSSIBLE. AREAS OF DISTURBED
SOIL/VEGETATION SHOULD BE REVEGETATED AS SOON AS PRACTICAL.
9. PREVENT EQUIPMENT FLUID LEAKS ONTO GROUND BY PLACING DRIP PANS OR PLASTIC TARPS UNDER
EQUIPMENT. REPAIR EQUIPMENT AS NECESSARY.
ADDITIONAL BMPS DURING CONSTRUCTION
1. LIMIT THE EXTENT OF LAND DISTURBANCE TO THE MINIMUM AMOUNT NECESSARY TO CONSTRUCT THE
PROJECT.
2. HYDROSEED DISTURBED AREAS WITH NATIVE PLANTS IMMEDIATELY UPON CONCLUSION OF CONSTRUCTION
ACTIVITIES.
3. STAGING AREAS OF CONSTRUCTION EQUIPMENT AND MATERIALS, INCLUDING RECEPTACLES AND
TEMPORARY STOCKPILES OF GRADED MATERIALS MUST BE COVERED ON A DAILY BASIS.
4. GOOD CONSTRUCTION MEASURES SUCH AS THE USE OF DRY CLEANUP MEASURES WHENEVER POSSIBLE, COLLECTING AND FILTERING CLEANUP WATER WHEN DRY CLEANUP METHODS ARE NOT FEASIBLE, CLEANING AND REFUELING CONSTRUCTION EQUIPMENT AT DESIGNATED OFF SITE MAINTENANCE AREAS, AND
IMMEDIATE CLEANUP OF ANY LEAKS OR SPILLS.
SE-5
TC-1
INSTALL FIBER ROLLS PER SE-5.
CONSTRUCTION ENTRANCE/EXIT PER TC-1.
INSTALL CONCRETE WASHOUT ROLL OFF BIN WITH LID REFER TO
WM-8 FOR ADDITIONAL INFORMATION.
EROSION CONTROL KEY NOTES:
WM-8
RB
LB
EROSION
CONTROL PLAN
C-300
FIBER ROLLS
CONSTRUCTION ENTRANCE/EXIT
CONCRETE WASHOUT
PROPOSED FLOW DIRECTION
LEGNED:
http://www.coffman.com http://www.coffman.com http://www.coffman.com
REV DATE DESCRIPTION
CEI PROJ. NO.
DRAWN
CHECKED
DATE
SHEET OF
COFFMAN ENGINEERS INC.C
231226
7/22/2024
SHEET TITLE:
SHEET NO:
www.coffman.com ph 509.328.2994
10 N. Post Street, Suite 500 Spokane, WA 99201
USDA NRCS LOCKEFORD
SEED BUILDING
21011 ELLIOTT RD.
LOCKEFORD, CA 95237
100% CD
No. 68283
EXP. 9/30/25
C I V I L
STAT E OF CA L I FORN I A
RE
G
I S
TE
RED PROFESS I ONAL ENG
I NEER
EROSION CONTROL
DETAILS
C-301
SE-5 FIBER ROLLSTC-1 STABILIZED CONSTRUCTION ENTRANCE/EXIT WM-8 CONCRETE WASTE MANAGEMENT http://www.coffman.com http://www.coffman.com http://www.coffman.com http://www.coffman.com http://www.coffman.com AutoCAD SHX Text
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
SCALE: NTS
CEI PROJ. NO.
DRAWN
CHECKED
DATE
SHEET OF
COFFMAN ENGINEERS INC.C
231226
7/22/2024
SHEET TITLE:
SHEET NO:
www.coffman.com ph 509.328.2994
10 N. Post Street, Suite 500 Spokane, WA 99201
USDA NRCS LOCKEFORD
SEED BUILDING
21011 ELLIOTT RD.
LOCKEFORD, CA 95237
100% CD
No. 68283
EXP. 9/30/25
C I V I L
STAT E OF CA L I FORN I A
RE
G
I S
TE
RED PROFESS I ONAL ENG
I NEER
SPECIFICATIONS
C-400
GENERAL NOTES
1. WORK AND MATERIALS SHALL COMPLY WITH THE CONSTRUCTION DOCUMENTS AND THE REQUIREMENTS AND STANDARDS OF THE AUTHORITIES HAVING JURISDICTION. IF STANDARDS ARE NOT PROVIDED BY THE AUTHORITIES HAVING JURISDICTION, WORK AND MATERIALS SHALL COMPLY WITH THE MOST
CURRENT EDITION OF THE CALTRANS STANDARD SPECIFICATIONS.
2. THE CONTRACTOR SHALL CALL THE UNDERGROUND SERVICE ALERT ONE-CALL NUMBER 811 TWO BUSINESS DAYS PRIOR TO EXCAVATION.
3. INFORMATION ON EXISTING CONDITIONS AND BOUNDARIES / RIGHT OF WAY SHOWN ON THESE PLANS WAS OBTAINED FROM A SURVEY NOT PERFORMED BY COFFMAN ENGINEERS. NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND REQUIRED ELEVATIONS AT THE SUBJECT SITE. VERIFY THE LOCATION AND SIZE OF EXISTING UTILITIES BEFORE PROCEEDING WITH CONSTRUCTION ACTIVITIES, INCLUDING UNDERGROUND AND OVERHEAD UTILITIES, UTILITY STRUCTURES, POINTS OF CONNECTION, AND UTILITY CROSSINGS. NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR EXCEPTIONS ENCOUNTERED PRIOR TO PROCEEDING. ANY COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING CONSTRUCTION SHALL BE BORNE BY THE CONTRACTOR.
4. THE CONTRACTOR SHALL HAVE A COMPLETE SET OF APPROVED CONSTRUCTION DOCUMENTS (INCLUDING ADDENDA) ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
5. THE CONTRACTOR SHALL PERFORM ALL WORK NECESSARY TO COMPLETE THIS PROJECT IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS, INCLUDING SUCH INCIDENTALS AS MAY BE NECESSARY TO MEET THE REQUIREMENTS AND STANDARDS OF THE AUTHORITIES HAVING JURISDICTION.
6. ALL MATERIALS, REQUIRED FOR THE COMPLETE EXECUTION OF THE PROJECT, SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR UNLESS
OTHERWISE NOTED.
7. THE DRAWINGS INDICATE LOCATIONS, DIMENSIONS, REFERENCES, AND TYPICAL DETAILS OF CONSTRUCTION. THE DRAWINGS DO NOT INDICATE EVERY CONDITION. WORK NOT FULLY DETAILED SHALL BE OF CONSTRUCTION SIMILAR TO PARTS THAT ARE FULLY DETAILED.
8. THE CONTRACTOR SHALL OBTAIN THE APPROPRIATE APPROVALS AND PERMITS FROM THE AUTHORITIES HAVING JURISDICTION PRIOR TO PROCEEDING WITH CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL COORDINATE WITH THE AUTHORITIES HAVING JURISDICTION TO CONFIRM INSPECTION, TESTING, AND
CERTIFICATION REQUIREMENTS.
9. CONSTRUCTION SHALL COMPLY WITH THE AMERICANS WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES (ADAAG).
10. EXISTING PROPERTY CORNERS AND SURVEY MONUMENTS SHALL BE PROTECTED DURING CONSTRUCTION. ANY DAMAGED OR OBLITERATED CORNERS OR MONUMENTS SHALL BE RE-ESTABLISHED BY A PROFESSIONAL SURVEYOR AT THE CONTRACTOR'S EXPENSE.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)
STANDARDS. COORDINATE REQUIREMENTS WITH THE AUTHORITIES HAVING JURISDICTION.
12. THE CONTRACTOR SHALL HAVE A SUPERINTENDENT OR REPRESENTATIVE ON SITE AT ALL TIMES DURING CONSTRUCTION.
13. SAFETY STANDARDS AND REQUIREMENTS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND COMPLIED WITH AS SET FORTH BY OSHA.
14. CONTRACTOR SHALL LEAVE AN EMERGENCY PHONE NUMBER WITH THE POLICE AND FIRE DEPARTMENTS.
15. CONTRACTOR SHALL POST ON THE SITE, EMERGENCY TELEPHONE NUMBERS FOR PUBLIC WORK, AMBULANCE, POLICE AND FIRE DEPARTMENTS.
16. THE CONTRACTOR SHALL HAVE THE APPROPRIATE LICENSES TO PERFORM THE SPECIFIED WORK IN CONFORMANCE WITH THE AUTHORITIES HAVING
JURISDICTION.
17. CONSTRUCTION EQUIPMENT SHALL BE PROPERLY MUFFLED. UNNECESSARY IDLING OF GRADING CONSTRUCTION EQUIPMENT IS PROHIBITED.
18.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .