Attachment 1 - Plans~5.pdf
PDF 805 KB Posted
- Attached to
- DNR Weldon Springs- Replace 2 fishing docks
- Solicitation number
- 24-422DNR-REALT-B-41122
- Issued by
- Dekalb County, Illinois
About this file
This document is an attachment to a state or local government contract opportunity related to the replacement of two fishing piers at Weldon Springs State Park. The two existing wooden shoreline platforms are to be removed, while the staircases are to remain. The new piers will consist of a 6' x 30' steel frame with wooden decking, along with a 6' x 10' walkway. No tree removal or disturbance to the surrounding areas will be permitted for landside access, and heavy work and equipment access will only be allowed from the water-side. The contractor is required to inspect the work area daily for the presence of snakes and to contact the site superintendent if any are found.
The document does not provide details on pricing terms, set asides, incumbents, funding requirements and sources, or any other salient information beyond the scope of work and project details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3Standard Terms and ConditionsV 23.2~2.pdf | ||
| Scope of Work - Small 1~33.docx | DOCX document | |
| 3Standard Illinois Certifications-v.23.1~1.docx | DOCX document | |
| 3SMALL CONSTRUCTION BID FORM1~12.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS © 2023 TomTom
PROJECT AREA - DOCKS TO BE REPLACED (2)
WELDON
SPRINGS
LAKE
WELDON SPRINGS
STATE PARK
C.R.500 N
PARK BOUNDARY
C.
R.
E
PARK ENTRANCE
PARK OFFICE
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
30'
EXISTING WOODEN SHORELINE PLATFORM
TO BE REMOVED (STAIRCAST TO REMAIN)
WELDON
SPRINGS
LAKE
VETERANS
POINT
MEMORIAL
6'
10'
NEW STEEL FRAME FISHING
PIER WITH WOODEN DECKING.
6' X 30' WITH 6' X 10' WALKWAY.
APPROXIMATE SHORELINE
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
30' 6'
10'
EXISTING WOODEN SHORELINE
PLATFORM TO BE REMOVED
(STAIRCAST TO REMAIN)
NEW STEEL FRAME FISHING
PIER WITH WOODEN DECKING.
6' X 30' WITH 6' X 10' WALKWAY.
DAY USE
AREA
APPROXIMATE SHORELINE
GENERAL NOTES:
1. PIER LOCATIONS SHOWN ARE APPROXIMATE. COORDINATE WITH SITE SUPERINTENDENT AND ADJUST AS NECESSARY TO ALLOW FOR PROPER TIE-IN TO
EXISTING EMBANKMENT AND STAIRCASE.
2. CONTRACTOR SHALL FULLY REMOVE THE EXISTING WOODEN FISHING PLATFORMS TO BE REPLACED. STAIRCASES ARE TO REMAIN. CONTRACTOR SHALL EXERCISE CAUTION DURING DEMOLITION, ANY UNDERMINING OF SLOPE OR BANK INTEGRITY CAUSED BY THE DEMOLITION SHALL BE REPAIRED
IMMEDIATELY AT THEIR EXPENSE. RESHAPE SLOPES TO MATCH SURROUNDING TERRAIN.
3. REFER TO THE FOLLOWING SHEETS FOR NEW PIER DETAILS AND NOTES.
4. HEAVY WORK AND EQUIPMENT ACCESS WILL BE PERMITTED FROM THE WATER-SIDE ONLY. NO TREE REMOVAL OR DISTURBANCE TO THE SURROUNDING
AREAS WILL BE PERMITTED FOR THE PURPOSES OF LANDSIDE ACCESS.
5. THE CONTRACTOR SHALL INSPECT THE WORK AREA PRIOR TO BEGINNING EACH DAY FOR THE PRESENCE OF ANY SNAKES. IF ANY ARE FOUND CONTACT
THE SITE SUPERINTENDENT FOR FURTHER GUIDANCE.
Feet 0 1000 2000
Feet 0 40 80
Feet 0 40 80
NORTH PIER REPLACEMENT LOCATION
SOUTH PIER REPLACEMENT LOCATION
| Sheets and Views |
| C-1 SITE PLAN |