Attachment 1 - Plans~5.pdf

PDF 805 KB Posted

Attached to
DNR Weldon Springs- Replace 2 fishing docks
Solicitation number
24-422DNR-REALT-B-41122
Issued by
Dekalb County, Illinois

About this file

This document is an attachment to a state or local government contract opportunity related to the replacement of two fishing piers at Weldon Springs State Park. The two existing wooden shoreline platforms are to be removed, while the staircases are to remain. The new piers will consist of a 6' x 30' steel frame with wooden decking, along with a 6' x 10' walkway. No tree removal or disturbance to the surrounding areas will be permitted for landside access, and heavy work and equipment access will only be allowed from the water-side. The contractor is required to inspect the work area daily for the presence of snakes and to contact the site superintendent if any are found.

The document does not provide details on pricing terms, set asides, incumbents, funding requirements and sources, or any other salient information beyond the scope of work and project details.

View the file

Other files

File Type Posted
3Standard Terms and ConditionsV 23.2~2.pdf PDF
Scope of Work - Small 1~33.docx DOCX document
3Standard Illinois Certifications-v.23.1~1.docx DOCX document
3SMALL CONSTRUCTION BID FORM1~12.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS © 2023 TomTom

PROJECT AREA - DOCKS TO BE REPLACED (2)

WELDON

SPRINGS

LAKE

WELDON SPRINGS

STATE PARK

C.R.500 N

PARK BOUNDARY

C.

R.

E

PARK ENTRANCE

PARK OFFICE

© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS

30'

EXISTING WOODEN SHORELINE PLATFORM

TO BE REMOVED (STAIRCAST TO REMAIN)

WELDON

SPRINGS

LAKE

VETERANS

POINT

MEMORIAL

6'

10'

NEW STEEL FRAME FISHING

PIER WITH WOODEN DECKING.

6' X 30' WITH 6' X 10' WALKWAY.

APPROXIMATE SHORELINE

© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS

30' 6'

10'

EXISTING WOODEN SHORELINE

PLATFORM TO BE REMOVED

(STAIRCAST TO REMAIN)

NEW STEEL FRAME FISHING

PIER WITH WOODEN DECKING.

6' X 30' WITH 6' X 10' WALKWAY.

DAY USE

AREA

APPROXIMATE SHORELINE

GENERAL NOTES:

1. PIER LOCATIONS SHOWN ARE APPROXIMATE. COORDINATE WITH SITE SUPERINTENDENT AND ADJUST AS NECESSARY TO ALLOW FOR PROPER TIE-IN TO

EXISTING EMBANKMENT AND STAIRCASE.

2. CONTRACTOR SHALL FULLY REMOVE THE EXISTING WOODEN FISHING PLATFORMS TO BE REPLACED. STAIRCASES ARE TO REMAIN. CONTRACTOR SHALL EXERCISE CAUTION DURING DEMOLITION, ANY UNDERMINING OF SLOPE OR BANK INTEGRITY CAUSED BY THE DEMOLITION SHALL BE REPAIRED

IMMEDIATELY AT THEIR EXPENSE. RESHAPE SLOPES TO MATCH SURROUNDING TERRAIN.

3. REFER TO THE FOLLOWING SHEETS FOR NEW PIER DETAILS AND NOTES.

4. HEAVY WORK AND EQUIPMENT ACCESS WILL BE PERMITTED FROM THE WATER-SIDE ONLY. NO TREE REMOVAL OR DISTURBANCE TO THE SURROUNDING

AREAS WILL BE PERMITTED FOR THE PURPOSES OF LANDSIDE ACCESS.

5. THE CONTRACTOR SHALL INSPECT THE WORK AREA PRIOR TO BEGINNING EACH DAY FOR THE PRESENCE OF ANY SNAKES. IF ANY ARE FOUND CONTACT

THE SITE SUPERINTENDENT FOR FURTHER GUIDANCE.

Feet 0 1000 2000

Feet 0 40 80

Feet 0 40 80

NORTH PIER REPLACEMENT LOCATION

SOUTH PIER REPLACEMENT LOCATION

Sheets and Views
C-1 SITE PLAN

File details come from the government source that posted it. Updated .