Attachment 1 - Plans~5.pdf

PDF 805 KB Posted

Attached to
DNR Weldon Springs- Replace 2 fishing docks
Solicitation number
24-422DNR-DIREC-B-41738
Issued by
Dekalb County, Illinois

About this file

This document appears to be an attachment to a state and local contract opportunity issued by the Illinois Department of Natural Resources (DNR) for the replacement of two fishing docks at Weldon Springs State Park in Clinton County, Illinois. The scope of work involves the removal of the existing 30-foot wooden shoreline platforms and the installation of two new 6-foot by 30-foot steel frame fishing piers with 6-foot by 10-foot walkways. The contractor will be responsible for exercising caution during the demolition process and ensuring the stability of the surrounding embankment and slopes. Access to the work area will be limited to the waterside, and no disturbance to the surrounding areas will be permitted. The contract may include a site visit requirement and a bidder's conference.

The pricing terms, set-asides, funding requirements, and sources are not explicitly stated in the document. However, the contract opportunity specifies that the contractor shall inspect the work area daily for the presence of snakes and contact the site superintendent for further guidance if any are found.

View the file

Other files

File Type Posted
3SMALL CONSTRUCTION BID FORM1~12.docx DOCX document
Scope of Work - Large 1~14.docx DOCX document
3Standard Illinois Certifications-v.23.1~1.docx DOCX document
3Standard Terms and ConditionsV 23.2~2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS © 2023 TomTom

PROJECT AREA - DOCKS TO BE REPLACED (2)

WELDON

SPRINGS

LAKE

WELDON SPRINGS

STATE PARK

C.R.500 N

PARK BOUNDARY

C.

R.

E

PARK ENTRANCE

PARK OFFICE

© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS

30'

EXISTING WOODEN SHORELINE PLATFORM

TO BE REMOVED (STAIRCAST TO REMAIN)

WELDON

SPRINGS

LAKE

VETERANS

POINT

MEMORIAL

6'

10'

NEW STEEL FRAME FISHING

PIER WITH WOODEN DECKING.

6' X 30' WITH 6' X 10' WALKWAY.

APPROXIMATE SHORELINE

© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS

30' 6'

10'

EXISTING WOODEN SHORELINE

PLATFORM TO BE REMOVED

(STAIRCAST TO REMAIN)

NEW STEEL FRAME FISHING

PIER WITH WOODEN DECKING.

6' X 30' WITH 6' X 10' WALKWAY.

DAY USE

AREA

APPROXIMATE SHORELINE

GENERAL NOTES:

1. PIER LOCATIONS SHOWN ARE APPROXIMATE. COORDINATE WITH SITE SUPERINTENDENT AND ADJUST AS NECESSARY TO ALLOW FOR PROPER TIE-IN TO

EXISTING EMBANKMENT AND STAIRCASE.

2. CONTRACTOR SHALL FULLY REMOVE THE EXISTING WOODEN FISHING PLATFORMS TO BE REPLACED. STAIRCASES ARE TO REMAIN. CONTRACTOR SHALL EXERCISE CAUTION DURING DEMOLITION, ANY UNDERMINING OF SLOPE OR BANK INTEGRITY CAUSED BY THE DEMOLITION SHALL BE REPAIRED

IMMEDIATELY AT THEIR EXPENSE. RESHAPE SLOPES TO MATCH SURROUNDING TERRAIN.

3. REFER TO THE FOLLOWING SHEETS FOR NEW PIER DETAILS AND NOTES.

4. HEAVY WORK AND EQUIPMENT ACCESS WILL BE PERMITTED FROM THE WATER-SIDE ONLY. NO TREE REMOVAL OR DISTURBANCE TO THE SURROUNDING

AREAS WILL BE PERMITTED FOR THE PURPOSES OF LANDSIDE ACCESS.

5. THE CONTRACTOR SHALL INSPECT THE WORK AREA PRIOR TO BEGINNING EACH DAY FOR THE PRESENCE OF ANY SNAKES. IF ANY ARE FOUND CONTACT

THE SITE SUPERINTENDENT FOR FURTHER GUIDANCE.

Feet 0 1000 2000

Feet 0 40 80

Feet 0 40 80

NORTH PIER REPLACEMENT LOCATION

SOUTH PIER REPLACEMENT LOCATION

Sheets and Views
C-1 SITE PLAN

File details come from the government source that posted it. Updated .