Attachment 1 Performance Work Statement FINAL 240401.pdf
PDF 266 KB Posted
- Attached to
- Lifting Equipment Rental Services
- Solicitation number
- H9224024Q0014
- Issued by
-
United States Special Operations Command
About this file
This document is a Performance Work Statement (PWS) for an Indefinite Delivery, Indefinite Quantity (IDIQ) contract to provide Skid Steer and Telehandler Systems rental services to Naval Special Warfare Group EIGHT (NSWG-8). The contractor shall furnish the use of Skid Steer Systems with multiple lifting capabilities, including forklift and front loader functions, as well as Telehandler Systems with at least 12,000 lb. lifting capacity for rough terrain use. The rental period is 30 days, and the contractor must be able to deliver the equipment to Fort Hunter Liggett, CA within 24 hours. The contract has a 5-year ordering period, with an optional 6-month extension. The related federal contract opportunity is a Request for Quote (RFQ) for Lifting Equipment Rental Services, issued by the United States Special Operations Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| H9224024Q0014.pdf | ||
| Attachment 2 WD 2015-5633 Rev 19.pdf | ||
| Exhibit A-E ELIN Price List 240328.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) Naval Special Warfare Group EIGHT Training Detachment
Skid Steer and Telehandler Systems
1. BACKGROUND
1.1. Naval Special Warfare Group EIGHT (NSWG-8) requires regular rental of lifting vehicles, i.e. portable lift systems that can be used as a forklift or a front loader and/ or a telehandler.
NSWG-8 trains and prepares its operators to conduct small unit tactics during Unit Level Training (ULT). Specifically, High-Risk Land Warfare training is held at Fort Hunter Liggett, Jolon, CA. NSWG-8 personnel off load aircraft as well as large trucks requiring a telehandler. Additionally, TRADET has a fabric portable storage facility with shelfing to store all its’ equipment in. The size of the area inside this facility precludes the use of a standard forklift to move equipment.
2. OBJECTIVES
2.1. The objective of this requirement is to establish a five (5) year Indefinite Delivery, Indefinite Quantity (IDIQ) contract for Skid Steer and Telehandler Systems.
3. SCOPE
3.1 The contractor shall furnish the use of Skid Steer System with the following capabilities:
3.1.1 Have multiple lifting capabilities.
3.1.2 Have ability to be used as a forklift.
3.1.3 Have ability to be used as a front loader.
3.1.4 Have ability to be used off road.
3.1.5 Have at least 3K lifting capacity.
3.2 The contractor shall furnish the use of a Telehandler system with the following capabilities:
3.2.1 Have multiple lifting capabilities.
3.2.2 Have at least a 12K lifting capacity.
3.2.3 Have ability to be used on rough terrain.
3.2.4 Have a Long fork set.
4. REQUIREMENTS
4.1. Equipment Lease: Vendor shall provide the use lifting equipment meeting the specifications in Sections 3.1 & 3.2 of this PWS. The rental period shall last thirty (30) days in duration. The contractor shall provide any training in compliance with any local, State, and Federal rules, regulations, and law necessary for rental and operation of leased equipment. The contractor shall be able to deliver and pick up the equipment to/from Fort Hunter Liggett, CA.
4.2. Delivery Dates and Usage:
4.2.1 Equipment Delivery: Contractor responsible for delivery of equipment. Delivery includes transportation and shipping for all equipment to and from to Fort Hunter Liggett, CA. The equipment shall be delivered, set-up and operational upon delivery to location as specified at the Task Order level. Contractor shall be capable of delivering equipment to the specified location within 24 hours. Shorter or longer lead times may be specified at the task order level as necessary.
5. DELIVERABLES
Deliverable CDRL PWS Ref. Delivery Date
Contract Manpower Reporting
A001 6.0 Annually NLT 30 September.
6. CONTRACTOR MANPOWER REPORTING
6.1. The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for NSWG-8 via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://sam.gov.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September
30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk on the sam.gov website.
7. CONTRACTOR TRAVEL
7.1. N/A
8. SECURITY
8.1. 8.1 Contractor shall make any necessary coordination for base access. The Government will provide escorts for onsite work to be conducted by contractor.
8.2. Contractor personnel shall be citizens of the United States.
9. SAFETY
9.1. Nothing in the Performance Work Statement (PWS), nor any Government action or failure to act in performance of the contract shall relieve the contractor of its responsibility for the safety of the contractor's personnel and property, the Government's personnel and property, and the general public. Furthermore, nothing in this PWS shall relieve the contractor of its responsibility for complying with applicable Federal, State, and Local laws, ordinances, codes, and regulations (including those requiring applicable licenses and permits) in connection with the performance of this contract.
10. QUALITY CONTROL
10.1. The contractor shall implement and maintain a Quality Control Plan (QCP) to ensure work performed conforms to the scope of work and meets the requirements under this PWS.
The QCP shall, at a minimum provide a method for performing inspections; identifying, correcting, and preventing problems/defective service; addressing customer complaints, and improving the quality of services over the life of the contract.
11. QUALITY ASSURANCE
11.1. The Government reserves the right to perform inspections and surveillance to evaluate the Contractor’s compliance to the contract terms and performance of the requirements in the PWS. The Government will make every effort to ensure that the surveillance methods used are conducted in an objective, fair, and consistent manner.
11.2. Contract Discrepancy Report (CDR). In the event of unsatisfactory contractor performance, the Contracting Officer will issue a CDR that will explain the circumstances and findings concerning the incomplete or unsatisfactory service. The contractor shall acknowledge receipt of the CDR and respond in writing as to how he/she shall correct the unacceptable performance and avoid a recurrence. The Government will review the contractor’s corrective action response to determine acceptability and will use any completed CDR as part of an overall evaluation of Contractor performance when determining present or future contractual actions.
12. PLACE OF PERFORMANCE
12.1. Fort Hunter Liggett, CA.
12.2. Other locations may be included on a to be negotiated basis.
13. PERIOD OF PERFORMANCE
13.1. Five-year ordering period. Optional FAR 52.217-8 6-month extension if necessary.
File details come from the government source that posted it. Updated .