Attachment 1- Performance Work Statement.pdf
PDF 343 KB Posted
- Attached to
- Hoist and Crane Repair Federal contract opportunity
- Solicitation number
- FA446021Q0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment FA446021Q00050001.pdf | ||
| Solicitation - FA446021Q0005.pdf | ||
| Attachment 7- Questions and Answers.pdf | ||
| Attachment 1- Performance Work Statement 08FEB2021.pdf | ||
| Attachment 6-Letter to Contractors- COVID 19.pdf | ||
| Attachment 5- Coronavirus Disease 2019(COVID-19) Factsheet.pdf | ||
| Attachment 4- A1 Memo Face Coverning.docx | DOCX document | |
| Attachment 2- Wage Determination.pdf | ||
| Solicitation - FA446021Q0005.pdf | ||
| Attachment 3- DoD Guidance on the Use of Cloth Face Coverings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Updated 16 Dec 2020
PERFORMANCE WORK STATEMENT (PWS)
REPAIR HOIST AND CRANES BASEWIDE
LITTLE ROCK AFB, AR 72099
1. DISCRIPTION OF SERVICES
1.1. The contractor shall provide all qualified personnel, transportation, lifts, tools, equipment, materials and services required to repair hoist and cranes base wide as listed in Appendix A on
Little Rock AFB, AR 72099. The contractor shall accomplish all services below to meet the requirements of this Performance Work Statement (PWS). Work shall be in compliance with all
Federal, State and local regulations, codes and license requirements. Work shall be accomplished within 60 days of award.
1.2. The requirements official has determined that none of the services to be performed are inherently governmental.
1.3. COVID-19. All contractors are required to follow Little Rock AFB guidelines for protection to prevent the spread of COVID-19.
2. SAFETY AND REGULATORY REQUIREMENTS
2.1. Repairs are in a multitude of industrial facilities with multiple work schedules. It is imperative that the contractor work out a tentative schedule and be flexible to accomplish the tasks in this PWS This operation may require the contractor to work on weekends to accomplish the task due to operations. Escort shall be provided by each facility user.
2.2. Pre-Install Requirements: Before services are commenced, the contractor shall inspect the work site and ascertain all information for the diligent performance of the service(s). The contractor shall notify the ordering agency of any conditions that prevent the suitable completion of these services to include operations that could endanger Government personnel or property and require appropriate abatement action. If the contractor discovers problems associated with the work after starting, he or she shall immediately notify the Contracting Officer (CO) for their approval if the work is to continue. Coordinate with the Government designated representative to have utilities/fire alarms etc…turned on or off during the competition of the task.
2.3. Disposal of waste: All waste disposals are the responsibility of the contractor to include any fees or permits. Recycling is mandatory on Little Rock AFB. Recycling containers shall be provided for the operation. Coordinate through your government representative or COR.
2.4. All work shall be accomplished in accordance with all regulations and standards regarding the repair of hoist and cranes including but not limited to the latest editions of:
AFOSHSTD 91-46 Materials Handling and Storage Equipment
OSHA1910.179 Overhead and Gantry Cranes
OSHA 1926.550 Cranes and Derricks
ASME B30.2 Overhead and Gantry Cranes
ASME B30.5 Mobile and Locomotive cranes
ASME B30.7 Winches
ASME B30.10 Hooks
ASME B30.11 Monorails and Underhung Cranes
ASME B30.16 Overhead Hoists (Underhung)
ASME B30.17 Overhead and Gantry Cranes: Top Running Bridge, Single Girder, Underhung Hoist
SAE J159 Rated Capacity System Guidelines of the Crane Manufacturers Association of
America (CMAA) Specification Numbers 70, Top Running Bridge and Gantry Type Multiple
Girder Electric Overhead Traveling Cranes and 74 Single Girder Cranes
NEC- National Electric Code Article 610
2.5. If a crane is required for any of the installation of the equipment by Federal Law an airfield waiver must be accomplished and signed off by the FAA. This takes a minimum of 60 days to complete and will delay work till completed.
3. WORK REQUIREMENTS
3.1. Material provided by the contractor
3.1.1. Contractor shall provide all parts and material needed to repair all hoist and cranes listed in Appendix A. All maintenance, repair and replacement of damaged, broken, or worn parts are to be done in a manner that ensures that the equipment may be operated safely. Use of manufacturer replacement parts is essential to restore equipment to a state in which it may safely perform its required operations as installed in accordance with the manufacturer’s recommendations.
3.2. Repairs
3.2.1. The contractor shall provide all qualified personnel, transportation, lifts, tools, equipment, materials and services required to repair hoist and cranes base wide as listed in Appendix A. All hoist and cranes repaired shall be tested and fully functional and qualified to pass a certification and load test per established standards. A copy of the inspection report will be made available upon request.
4. GOVERNMENT FURNISHED EQUIPMENT
4.1. All facilities with hoists or cranes that require repair shall provide an escort for the contactor as needed. The contractor shall provide a work schedule and coordinate with each facility manager in order to expedite the repairs and keep scheduling conflicts to a minimum.
5. GENERAL REQUIREMENTS
5.1. Contractor personnel and vehicles must possess appropriate passes. These shall be obtained from Installation Security Forces Pass and ID at the Vehicle Inspection Center.
5.2. The Contractor is subject to all installation fire, safety, security, and traffic regulations.
5.3. The Government contracts on the understanding that the Contractor is complying with applicable laws concerning workplace safety.
5.4. The Contractor is subject to all citations and penalties for violation of applicable workplace safety laws. The burden of compliance rests with the Contractor. Enforcement of workplace safety laws is the responsibility of the agency specified in the applicable law.
5.5. The Contracting Officer may notify the Contractor of hazards in Contractor operations that endanger Government personnel or property and require appropriate action. This provision does not constitute assumption of liability for Occupational Safety and Health compliance on the part of the Government or negate other agency responsibility for enforcement of applicable laws.
5.6. Accident prevention principles must be thoroughly integrated into all operations. Unsafe conditions and practices, as identified by the designated representative, must be corrected immediately.
5.7. Contractor Employees: While on the installation, the contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the Contracting
Officer as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the organization or by wearing appropriate badges containing the organization's name and the employee's name. Contractor personnel must wear issued base identification cards at all times while on the installation.
5.8. Service contracts shall require contractor employees to identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with government personnel. In addition, contracts shall require contractor personnel to appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.
6.0. WARRANTY
6.1. Contractor shall guarantee all material, workmanship and labor from defects for a period of
12 months from the date of acceptance of the work.
7.0. APPENDIXES
Appendix A: Workload Estimate for Repair of deficiencies of Hoist and Cranes Base wide.
7.1. Appendix A Workload Estimate for Repair of Deficiencies of Hoist and Cranes Base wide.
FAC EQ ID TYPE DEFICIENCIES
250 YALE
XD5035L15
MONORAIL
ELECTRIC
Missing Capacity on Monorail, Install Ground Bar (Needs New
Conductor Bar System), Hoist sparks under Load, Install E Stop on
Pendant with Mainline Contactor
250 NITCHI
SH5025-202-
MONORAIL
ELECTRIC
Install E Stop on Pendant with Mainline Contactor, Install Ground
Bar
250 YALE
XD5035L15
MONORAIL
ELECTRIC
Install E Stop on Pendant with Mainline Contactor, Install Ground
Bar
250 YALE
XD5C35L15
BRIDGE
ELECTIRC
Install Ground Bar, Repair Pendant Boot due to tear and label
Missing Functions, replace wheels
256 YALE BRIDGE
MANUAL
Missing capacity on monorail
256 YALE BRIDGE
MANUAL
Missing capacity on monorail
256 YALE BRIDGE
MANUAL
Missing capacity on monorail
259 ELECTROLIFT
ES15-4241
FIXED
ELECTRIC
Adjust Upper Limit, Replace Wire Rope, Repair Rope Guide due to not rolling and cut through
259 ELECTROLIFT
ES15-4241
FIXED
ELECTRIC
Adjust Upper Limit, Replace Wire Rope, Repair Rope Guide due to not rolling and cut through
259 ELECTROLIFT
ES15-4241
FIXED
ELECTRIC
Adjust Upper Limit, Replace Wire Rope, Repair Rope Guide due to not rolling and cut through
259 ELECTROLIFT
ES15-4241
FIXED
ELECTRIC
Adjust Upper Limit, Replace Wire Rope, Repair Rope Guide due to not rolling and cut through
259 R & M S3-5-
18M15T
GANTRY
ELECTRIC
Repair Bent End Stops, Install Ground Bar
260 VIRGINA
DGTRDM-
504465
BRIDGE
ELECTRIC
Install Ground Bar, repair base plates
261 P & H BRIDGE
ELECTRIC
Install Ground Bar, Replace Hoist Reversing Contactors, Replace
Pendant Buttons, Rework Control Panel Wiring, Replace Thrust
Bearing on Hook
268 DETROIT BRIDGE
ELECTRIC
Replace Pendant Due To Damage Housing
276 STAHL
SH5025-
2021IL3
BRIDGE
ELECTRIC
Install Trolley Tow Arm, Replace Pendant
282 YALE BEW ½
- 95PT59S2
JIB Replace Thrust Bearing, Pendant Labels, address rust issue
301 HSC
Speedway, BRIDGE
CRANE
Install Festoon Tow Arm, Strain Relief, Reposition Fall Arrest
System
Series 31
356 YALE OR
HARRINGTON
MONORAIL
MANUAL
Suspension points on monorail are missing spacers, washers, and overall unsatisfactory. Top plate of monorail waved. Bottom flanges are uneven at splices. Monorail un-level on east end.
Reposition/reinstall end stops
356 YALE OR
HARRINGTON
MONORAIL
MANUAL
Suspension points on monorail are missing spacers, washers, and overall unsatisfactory. Top plate of monorail waved. Bottom flanges are uneven at splices. Monorail un-level on east end.
Reposition/reinstall end stops.
356 YALE OR
HARRINGTON
MONORAIL
MANUAL
Suspension points on monorail are missing spacers, washers, and overall unsatisfactory. Top plate of monorail waved. Bottom flanges are uneven at splices. Monorail un-level on east end.
Reposition/reinstall end stops.
356 YALE OR
HARRINGTON
MONORAIL
MANUAL
Suspension points on monorail are missing spacers, washers, and overall unsatisfactory. Top plate of monorail waved. Bottom flanges are uneven at splices. Monorail un-level on east end.
Reposition/reinstall end stops.
356 YALE OR
HARRINGTON
MONORAIL
MANUAL
Replace lower hook
356 YALE OR
HARRINGTON
MONORAIL
MANUAL
Repair welds on bumper extensions
356 YALE OR
HARRINGTON
MONORAIL
MANUAL
Repair welds on bumper extensions
356 YALE OR
HARRINGTON
MONORAIL
MANUAL
Repair end stops
356 YALE OR
HARRINGTON
MONORAIL
MANUAL
Repair end stops
356 YALE OR
HARRINGTON
MONORAIL
MANUAL
Beam is showing wear at splices. Beam suspension hardware is uneven, partially shimmed. Beam is a fabricated two-piece design and top plate is waved throughout run. Repair/adjust hoist trolley for smooth operation. Will need to be reinstalled (taken out of service)
356 YALE OR
HARRINGTON
MONORAIL
MANUAL
Beam is showing wear at splices. Beam suspension hardware is uneven, partially shimmed. Beam is a fabricated two-piece design and top plate is waved throughout run. Repair/adjust hoist trolley for smooth operation. Will need to be reinstalled (taken out of service)
356 COFFING MONORAIL
ELECTRIC
Replace Speed Relay
356 COFFING MONORAIL
ELECTRIC
Beam is showing wear at splices. Beam suspension hardware is uneven, partially shimmed. Beam is a fabricated two-piece design and top plate is waved throughout run. Repair/adjust hoist trolley for smooth operation, adjust brakes
356 COFFING MONORAIL
ELECTRIC
Beam is showing wear at splices. Beam suspension hardware is uneven, partially shimmed. Beam is a fabricated two-piece design and top plate is waved throughout run. Repair/adjust hoist trolley for smooth operation
356 COFFING MONORAIL
ELECTRIC
Beam is showing wear at splices. Beam suspension hardware is uneven, partially shimmed. Beam is a fabricated two-piece design and top plate is waved throughout run. Repair/adjust hoist trolley for smooth operation. Replace damaged pendant.
368 COFFING MONORAIL
ELECTRIC
Install Ground Bar
368 COFFING MONORAIL
ELECTRIC
Install Ground Bar
368 COFFING MONORAIL
ELECTRIC
Install Ground Bar, Replace Reversing Contactors, Correct Trolley
Spacing
466 DETROIT
SN#149785
BRIDGE
ELECTRIC
Install Ground Bar, Wire Rope not in guide
656 YALE MONORAIL
MANUAL
Missing Capacity on Monorail, Install Sway Brace
790 BEEBE
BROTHERS
JIB
MANUAL
Replace Wire Rope, Ratcheting Pawl Not Springing Closed To
Engage Load Brake
1222 SHAW BOX BRIDGE
ELECTRIC
Requires duel collectors when using VFD, Tear in festoon cable
1228 R & M BRIDGE
ELECTRIC
Repair Runway end stops due to out of square.
1231 SHAWBOX BRIDGE
ELECTRIC
Trolley rated at 12,000lbs and requires de-rating
1230B YALE BRIDGE
ELECTRIC
Repair/Replace Disconnect and Label, Install Ground Bar, Replace
Bridge High Speed Contactor, re-organize wiring in control panel
1230B COFFING BRIDGE
ELECTRIC
Install Ground Bar and install bridge disconnect