Attachment 1 - Performance Work Statement.pdf

PDF 94 KB Posted

Attached to
Glazing Services, Bldg 4 Federal contract opportunity
Solicitation number
FA301625Q6010
Issued by
Department of the Air Force Air Education and Training Command

About this file

This Performance Work Statement (PWS) details the procurement and installation of upper partition glass for the 39 IOS, Det 1 at Joint Base San Antonio. The project involves procuring and installing 63 pieces of upper partition glass and framing in Building 4, Kelly Annex, for locations not covered in a previous furniture and partition installation contract. The contractor is required to manage all aspects of the project, including delivery, installation, and removal of packaging materials, with work restricted to normal operating hours (Monday-Friday, 0800-1630).

Key requirements include coordinating base access with the Security Manager, obtaining escorts while working in Building 4, and wearing issued white badges. The contractor must coordinate delivery and installation with designated points of contact: Scott Roberts (primary) and Todd Neal (alternate). The delivery location is 39 IOS Det 1 at 3515 S Gen McMullen Dr, San Antonio, TX 78226. The installation must match the original partition glass installation, and a final walkthrough will be conducted to quality check the installations and packaging material removal.

View the file

Other files for this federal contract opportunity

Other files attached to Glazing Services, Bldg 4, newest first.
File Type Posted
FA301625Q60100001 RFQ.pdf PDF
Attachment 6 - Questions and Answers.pdf PDF
Attachment 5 - Glass Mounting and Framing.pdf PDF
Amendment 0001.pdf PDF
Attachment 3 - Product Specifications.pdf PDF
Attachment 4 - SCA Wage Determination 2015-5253.pdf PDF
Attachment 2 - List of Materials.pdf PDF
FA301625Q6010.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Stateent (PWS)

39 IOS, Det 1 Joint Base San Antonio

Upper Partition Glass Procurement and Installation

18 February 2025

OBJECTIVE

Contractor shall procure and install upper partition glass in designated locations which were not included during the previous furniture / partition installation contract in Building 4, Kelly Annex, JBSA.

1.0 GENERAL

1.1. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to procure, store, delivery, and install upper partition glass.

1.2. The contractor shall procure, store, and deliver 63 peices of upper partition glass and framing as defined in the breakdown for the partition walls.

1.3. The contractor shall install 63 peices of upper partition glass and framing as defined in the breakdown for the partition walls.

1.4. The contractor will coordinate delivery and installation with listed POCs.

1.5. The contractor shall remove all packaging material after installation.

2.0 POINTS OF CONTACT

A. Primary: Scott Roberts 210-977-5902

B. Alternate: Todd Neal 210-977-5904

3.0 DELIVERY

3.1. The items will be delivered to:

39 IOS Det 1

3515 S Gen McMullen Dr

San Antonio, TX 78226

3.2. Contractor’s installation and delivery hours shall be restricted to normal 39 IOS Det 1 operating hours from Mon-Fri 0800-1630.

4.0 INSTALLATION

4.1. Contractor shall correctly install the 63 pieces of upper partition glass and framing in a similar manner as the original installation of other upper partition glass which was instaled during the original contract installation of partitions and furniture.

4.2 Contractor shall conduct a final walkthrough with listed POCs to quality check the installations and removal of packaging materials.

4.3. Contractor’s installation and delivery hours shall be restricted to normal 39 IOS Det 1 operating hours from Mon-Fri 0800-1630.

5.0 SECURITY REQUIREMENTS

5.1 Base Access. Contractor shall coordinate with 39 IOS Det 1 Security Manager, Mr. Chris

Pearson, 210-977-5717, christopher.pearson.17@us.af.mil, to request base access.

5.2. Escort Required. Contractor shall coordinate with listed POCs for escorts while working inside Building 4. Contractor personnel must be escorted at all times while working inside

Building 4. Contractor personnel will be issued white badges for their time working inside

Building 4 which they are required to wear and display at all times.

6.0 SERVICE DELIVERY SUMMARY

Performance Objective PWS Paragraph Performance Threshold

Procure, store, and deliver upper partition glass and framing

1.3 Procure and deliver partition

glass

Install upper partition glass and framing

1.3 Install partition glass

Remove all packaging material

1.5 Remove packing material

Conduct a final walkthrough

4.2 Conduct final walkthru