Attachment 1 - Performance Work Statement.docx

DOCX document 25 KB Posted

Attached to
HVAC Replacement in Growth Chamber - Stillwater, OK
Solicitation number
12805B23Q0778
Issued by

About this file

This performance work statement outlines requirements for replacing one HVAC unit in a growth chamber building at the USDA ARS Wheat, Peanut, and Other Field Crops Research Unit in Stillwater, Oklahoma. The solicitation seeks bids to remove the existing 10-ton water furnace unit and install a new Carrier or equivalent brand unit with the same specifications. Bids are due by a specified date and must include pricing, schedules, subcontractor information if applicable, equipment details and manufacturer literature, and a site safety plan. Upon selection, the contractor will deliver, install, integrate, test, and demonstrate the new HVAC unit. Deliverables also include manuals, warranties, and ensuring compliance with manufacturer, ARS, and regulatory standards. The contractor must verify site conditions, use licensed personnel, maintain a clean worksite, and be available onsite with a local service provider able to respond within 60 minutes. Damage to existing systems must be repaired at no cost.

View the file

Other files

File Type Posted
Attachment 2 - Wage Determination.pdf PDF
Clauses and Provisions - 12805B23Q0778.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation# 12805B23Q0778 USDA ARS Wheat, Peanut, and Other Field Crops Research Unit Stillwater Oklahoma Growth Chamber HVAC Replacements – Statement of Work

The USDA ARS Wheat, Peanut, and Other Field Crops (WPOFC) Research Unit has a requirement for replacing (1) HVAC unit in the ARS-24 Growth Chamber Bldg. The WPOFC unit is located at 1301 N. Western Road Stillwater, OK 74075.

1. Purpose

1.1. To carry out the above mission, WPOFC maintains a climate-controlled office area in the Growth Chamber Bldg of Plant Science Office/Lab (ARS-24). A consistent temperature is required for the equipment and productivity of the scientific staff.

1.2. The Growth Chamber Bldg (ARS-24) has 1 HVAC unit.

We would expect a life of around 25 years out of the new components. New units would also be more energy efficient.

1.1. Requirements for (1) new HVAC units would be Carrier or equal brand equipment.

1.1.1. (1) Water furnace Versatec 300, 10 ton package unit Model # NXH120ER30ACANNA3SS or equal brand/model

2. Submittals

2.1. When submitting the bid to replace the HVAC units, the prospective contractor shall:

A. Specify costs for performing the work as specified on this SOW.

B. Provide the contractor’s work schedule.

C. Provide a list of subcontractors, if necessary.

D. Specify the manufacturer and model/part numbers of all equipment and materials proposed for installation.

E. Provide manufacturer’s literature and shop drawings which clearly identify the items and their conformance with this statement of work.

F. Submit a site safety plan to the contracting officer before starting work.

3. Deliverables

3.1. The selected contractor shall:

A. Deliver all components of the HVAC unit on-site and install.

B. Deliver, install, integrate, and test wiring, thermostats, controls, and/or other ancillary items necessary for operation of the units.

C. Deliver any manuals, diagrams, instructions, warranties, or other paperwork for the units to the contracting officer’s representative. These may be in CD-ROM or hard copy format.

D. Demonstrate correct operation and operational maintenance of the units to WPOFC personnel, including the maintenance mechanic.

E. Deliver any warranties to the contracting officer as a hard copy. The warranty period shall begin on the same date as project acceptance and shall continue for the full product warranty period.

3.2. These deliverables shall be approved by the contracting officer or contracting officer’s representative before final acceptance.

4. Characteristics

4.1. The HVAC unit shall be:

A. Structurally, electrically, and operationally compatible with the existing system components.

B. Installed as, function as, and be configured as a permanent and integral part of the HVAC system.

C. Interfaced with the buildings systems and electrical systems. Any new wiring, switches, or controls shall be clearly labeled.

D. Functional in the weather conditions normally found at the WPOFC unit.

5. Verification of Site Conditions

5.1. Before installing the HVAC unit, the contractor shall verify site conditions. This will include:

A. Visually inspecting the existing system and the ARS-24 GrowthChamber Bldg.

B. Verification of the electrical, mechanical, and HVAC system characteristics of the ARS-24 Growth Chamber Bldg.

C. Verification of measurements, locations, clearances, interference, accesses, ducting, wiring, piping, and any other pertinent characteristic of the building.

5.2. Failure of the contractor to verify site condition shall not release them from contract performance.

6. Compliance

6.1. The contractor shall install the HVAC unit in accordance with:

A. The instructions of the HVAC unit manufacturer.

B. Applicable ARS standards, including but not limited to ARS Facilities Design Standards Manual 242.1 and ARS Energy Management Plan 134.2. These can be found at https://www.afm.ars.usda.gov/facilities/policy-and-guidance.

C. Federal, state, and local laws, regulations, and codes.

D. Applicable industry standards and codes, including but not limited to NFPA, NEMA, NEC, ASTM, ICC, UL, ANSI, ASCE, and so on.

6.2. If any of these applicable laws, regulations, codes, or standards are in conflict with one another, the contractor shall bring this to the attention of the contracting officer.

6.3. Obtaining the necessary permitting or licensing shall be the responsibility of the contractor and at the contractor’s expense.The personnel employed by the contractor shall be qualified to perform their respective trades. Contractor personnel licensure, certification, or qualification shall be the responsibility of the contractor.

7. Other Requirements

7.1. The work performed under this contract shall be subject to continuous audit by the contracting officer’s representative. Quality control is the exclusive responsibility of the Contractor.

7.2. The Contractor will designate one supervisor for satisfactory supervision on the contract work. The Contractor or his/her on-site representative shall be available at all times while the contract work is in progress.

7.3. All materials and equipment furnished by Contractor shall be subject to inspection and approval by the contracting officer or contracting officer’s representative.

7.4. The contractor shall ensure that the worksite is kept clean and free of debris at all times. Any unused materials or trash shall be removed from the worksite. The contractor will need to provide their own dumpster. Use of USDA dumpster will be prohibited.

7.5. If the contractor requires the cooling system to be shut down or otherwise made inoperable while installing the geo-thermal system, the contractor shall give at least three working days notice to the contracting officer’s representative.

7.6. Utilities such as electricity and water may be furnished by WPOFC if requested by the contractor. The Contractor will provide their own restrooms.

7.7. The contractor shall not damage existing equipment, structures, or other government items. If the contractor causes damage, the contractor shall repair or replace as needed to return to an “as found” condition. Ground should be leveled to pre-existing grade.

7.8. The contractor shall not damage the HVAC system or any wiring, controls, piping, ducting, conduit, and/or other ancillary items to be installed. If the contractor causes damage, the contractor shall repair or replace as needed to return to a like-new condition.

8. Maintenance and Service

8.1. The vendor should have a local service provider within 60 minutes drive time of 1301 N. Western Rd., Stillwater OK. They should be able to provide a quick response time for maintenance and service issues. Fluctuations in building temperatures can affect the comfort of the research staff and, therefore, the research. The inability to control temperatures could cause a loss of research and affect the mission of the WPOFC Unit.

Offerors are encouraged to visit the site to gain understanding of the project. Please contact Daniel Hover, listed below for a site visit.

Daniel Hover Facilities Operation Spec. USDA ARS 1301 N. Western Rd., Stillwater OK 74075 405.385.5401 daniel.hover@usda.gov