Attachment 1 - Performance work statement.docx
DOCX document 93 KB Posted
- Attached to
- WHEELED FLIGHTLINE FIRE EXTINGUISHER
- Solicitation number
- W50S6S21Q0020
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W50S6S21Q0020 Q and A.docx | DOCX document | |
| Attachment 1 - Amended PWS.docx | DOCX document | |
| Attachment 3 - Past Performance Questionnaire.pdf | ||
| Attachment 4 - CERT of 52.204-2425 26 (REV).pdf | ||
| RFQ W50S6S21Q0020 - Fire Bottle TCTO.docx | DOCX document | |
| Attachment 2 - Past Performance Reference List.docx | DOCX document | |
| Attachment 5 - SCA WD 2015-5473 (Rev 13).txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARIZONA AIR NATIONAL GUARD
162D Wing Fire and Emergency Services Tucson, Arizona 85706
PERFORMANCE WORK STATEMENT (PWS)
Inspect, Test, Service Amerex 150 lb. Model 600 Fire Extinguishers
DESCRIPTION OF SERVICES
1.0 Scope of Work. The contractor shall provide all facilities, equipment, tools, transportation with fuel, and parts to perform inspections, testing and servicing of Amerex 150 lb. Model 600 Fire Extinguishers
1.1. Contractor Tasks.
a. The contractor shall perform Inspections, Low Pressure Testing and Servicing of HALON 1211 for 87 Amerex 150 lb. Model 600 Fire Extinguishers IAW TCTO 13F4-4-501D. The contractor shall be required to coordinate with 162d Wing Fire Department to obtain HALON for any fire bottles which require servicing. Fire Department POC will be identified post contract award.
b. The contractor shall perform Removal/Replacement of Down Tube and Valve Assembly for 87 Amerex 150 lb. Model 600 Fire Extinguishers IAW TCTO 13F4-4-501D.
c. The contractor shall perform 12 year hydrostatic testing and servicing of HALON for 29 Amerex 150 lb. Model 600 Fire Extinguishers IAW NFPA.
d. The contractor shall replace defective consumables as needed (labels, hoses, nozzles, down tubes and valve assemblies).
Location: All inspection, testing and servicing is to be completed at contractor’s facility.
1.2. Schedule. All work to be completed within 60 Days of receipt of order. The contractor shall be responsible to coordinate with 162d Fire Department to pick up 87 Amerex 150 lb. Model 600 Fire Extinguishers (taking up to 8 fire extinguishers in one instance); transport for servicing at contractor facility and return of serviceable Fire Extinguishers when complete.
1.3 Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 10-245, AFI 31-101 and AFMAN 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
Contract objective: Perform inspections, testing and servicing of Amerex 150 lb. Model 600 Fire Extinguishers. Perform the 12 year hydrostatic test/service on 150 lb. Halon Fire Extinguishers.
| Deliverable |
| Performance Standard |
| Acceptable Quality Level (AQL) |
| Method Used / Frequency |
| Inspections, low pressure leak test on the solder joint connecting the downtube and assembly. |
| Technical Specification |
1.1..a IAW technical manual 13F-4-4-121
| 100% |
| Spot check/visual inspection upon Completion |
| Remove/replace down tube and valve assembly for 87 each Amerex 150lb Model 600 fire extinguishers. |
| Technical Specification |
1.1.b. IAW TCTO 13F4-4-501D 100%
| 12 year hydrostatic test and service 29 each of Halon Amerex 150lb model 600 fire extinguisher IAW NFPA. |
| Technical Specification |
1.1..a IAW TCTO 13F4-4-501D
| 100% |
| Spot check/visual inspection upon Completion |
| Replace defective consumables as needed (labels, hoses, nozzles, down tubes, and valve assembles). |
| Technical Specification |
1.1..a IAW TCTO 13F4-4-501D
| 100% |
| Spot check/visual inspection upon Completion |
END PWS