Attachment 1 - Performance Work Statement.docx
DOCX document 41 KB Posted
- Attached to
- Maxwell RSC 48 DNA Extraction Systems or Equal – Commercial Blanket Purchase Agreement (BPA)
- Solicitation number
- HFP2026133524
About this file
This is a Performance Work Statement (PWS) for the acquisition and installation of Maxwell RSC 48 DNA Extraction Systems to support the Food and Drug Administration's Office of Laboratory Operations and Applied Science. The contractor shall deliver seven brand-new, manufacturer-certified Maxwell RSC 48 systems to FDA laboratories located in Arkansas, Atlanta, Irvine, Denver, San Francisco, Seattle, and New York within 90 days of award. Each system must process up to 48 samples in a single run, complete processing in as little as 30 minutes, and produce high-quality nucleic acid suitable for FDA validated molecular rapid methods. All systems shall be newly manufactured units with required components including the instrument, tablet PC with preloaded Maxwell RSC Application Software, Quantus Fluorometer, deck trays, UV bulb, cables, and accessories.
The contractor must provide professional installation services by qualified field system engineers within 14 days of delivery, including moving equipment to final point of use, ensuring proper electrical connection, and verifying operational functionality. Comprehensive on-site training must be delivered to up to three users per laboratory by qualified field application specialists within 14 days of delivery, covering system operation, sample processing procedures, software operation, routine maintenance, troubleshooting, and safety protocols. The contractor shall provide a minimum one-year warranty from the date of installation covering all non-consumable items, parts, labor, unlimited telephone/email support, and on-site service as needed, with response to service requests within two business days and on-site service within five business days. Performance standards require 99% on-time delivery, 99% delivery condition without damage, 99% installation completion within 14 days, 95% training completion within 14 days with 95% of trained users achieving independent operation capability, and 95% system availability during the warranty period. The contract period extends for five years with anticipated task orders for one to two additional systems per year. The contractor must comply with IT security requirements, physical security protocols including visitor clearance, and data protection standards, while maintaining quality assurance procedures and providing detailed documentation upon installation completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 6 Technical Compliance Matrix.docx | DOCX document | |
| Attachment 8 - BPA Solicitation Maxwell.docx | DOCX document | |
| Attachment 4 Buy American Certificate.docx | DOCX document | |
| Attachment 7 - Subcontracting Plan Template.pdf | ||
| Attachment 3 - SF 18 75F40126Q00256 HFP2026133524.pdf | ||
| Attachment 2 - Pricing_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_5_Past_Performance_Reference_Form_FAR_2025.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 - Performance Work Statement (PWS) Maxwell RSC 48 DNA Extraction Systems
1. INTRODUCTION
1.1 Purpose
This Performance Work Statement (PWS) establishes the performance objectives, standards, and requirements for the acquisition and installation of Maxwell RSC 48 DNA Extraction Systems to support the Food and Drug Administration's Office of Laboratory Operations and Applied Science, Office of Regulatory Testing and Surveillance, Human and Animal Food Laboratories (OLOAS/ORTS/HAFL).
1.2 Background
The mission of OLOAS/ORTS/HAFL is to protect public health by providing analytical approaches encompassing the use of rapid methodology and expert scientific evaluations in support of investigations involving the safety of foods and other FDA regulated products. The Microbiology Branches use validated rapid, highly sensitive molecular methods and instrumentation for recovery, detection, and quantification of enteric bacterial pathogens and their related toxins isolated from foods and cosmetics as well as related food processing and farm production environments.
1.3 Scope of Work
The Contractor shall provide Maxwell RSC 48 DNA Extraction Systems, including delivery, installation, training, and warranty services over a five-year contract period.
2. APPLICABLE DOCUMENTS
Federal Acquisition Regulation (FAR) HHS Acquisition Regulation (HHSAR) FDA Information Technology Security and Privacy Requirements
3. PERFORMANCE OBJECTIVES
3.1 Overall Objective
The Contractor shall deliver fully operational Maxwell RSC 48 DNA Extraction Systems that meet FDA's functional genomic sequencing needs for DNA extraction and high throughput requirements for high-quality DNA used for FDA validated molecular rapid methods.
3.2 Specific Performance Objectives
Objective 1: Equipment Delivery
- Deliver brand-new, manufacturer-certified Maxwell RSC 48 systems to designated FDA laboratories
- Ensure all systems meet manufacturer specifications and are free from defects Objective 2: Installation Services
- Provide professional installation services by qualified field system engineers
- Ensure systems are fully operational and integrated into laboratory environments Objective 3: Training Services
- Deliver comprehensive on-site training to enable independent operation by laboratory personnel
- Provide training materials and consumables for hands-on instruction Objective 4: Warranty and Support
- Provide minimum one-year warranty coverage from date of installation
- Ensure responsive technical support throughout warranty period
4. PERFORMANCE REQUIREMENTS
4.1 Equipment Specifications
Each Maxwell RSC 48 system shall include the following components:
Maxwell RSC 48 Instrument Tablet PC preloaded with Maxwell RSC Application Software USB Cable for connection of the Maxwell RSC Instrument to the Tablet PC Power Cable for Maxwell RSC Instrument Power Cord for Tablet PC Pair of Maxwell RSC/CSC Deck Trays UV bulb (installed) Tablet PC Holder Quantus Fluorometer and accessories Quick Start Guide Set-up Guide 2 Additional front deck and back deck trays The Maxwell RSC 48 system shall:
Process up to 48 samples in a single run Complete processing in as little as 30 minutes Operate without requiring spin columns or high-speed centrifugation Minimize shearing, clogged tips, or contaminating drips Produce high-quality nucleic acid suitable for FDA validated molecular rapid methods Systems shall be newly manufactured units, not used, refurbished, or previously used for demonstration purposes All systems shall be delivered with necessary supplies and accessories required for installation and start-up
4.2 Delivery Requirements
First Task order:
- Seven (7) Maxwell RSC 48 systems delivered within 90 days of award to the following locations:
- Arkansas Human and Animal Food Laboratory (ARLHAFL), Jefferson, AR
- Atlanta Human and Animal Food Laboratory (ATLHAFL), Atlanta, GA
- Irvine Human and Animal Food Laboratory (IRVHAFL), Irvine, CA
- Denver Human and Animal Food Laboratory (DENHAFL), Denver, CO
- San Francisco Human and Animal Food Laboratory (SANHAFL), Alameda, CA
- Seattle Human and Animal Food Laboratory (SEAHAFL), Bothell, WA
- New York Human and Animal Food Laboratory (NYHAFL), Jamaica, NY Anticipated Task Orders
- Estimated One (1) to Two (2) systems per year delivered within 90 days of option exercise
- Destinations to be determined at time of order FOB Point: Destination Delivery Hours: Monday - Friday, 8:00 AM - 4:00 PM (excluding Federal holidays) Inside Delivery: Items shall be brought from delivery vehicle into facility's loading dock U.S. Food & Drug Administration Irvine Human and Animal Food Laboratory (IRVHAFL) 19701 Fairchild, Irvine, CA 92612 U.S. Food & Drug Administration Atlanta Human and Animal Food Laboratory (ATLHAFL) 1777 Hardee Ave, Atlanta, GA 30310 U.S. Food & Drug Administration Arkansas Human and Animal Food Laboratory (ARLHAFL) 3900 NCTR Road, Bldg. 26, Jefferson, AR 72079 U.S. Food & Drug Administration Denver Human and Animal Food Laboratory (DENHAFL) 1 Denver Federal Center, 6th Ave and Kipling St., Bldg. 20, Entrance W10, Denver, CO 80225 U.S. Food & Drug Administration San Francisco Human and Animal Food Laboratory (SANHAFL) 1201 Harbor Bay Pkwy, Alameda, CA 94502 U.S. Food & Drug Administration Seattle Human and Animal Food Laboratory (SEAHAFL) 22201 23rd Dr. SE, Bothell, WA 98021 U.S. Food & Drug Administration New York Human and Animal Food Laboratory (NYHAFL) 158-15 Liberty Ave., Jamaica, NY 11433
4.3 Installation Requirements
The Contractor shall:
Coordinate installation schedule with each individual laboratory Technical Point of Contact (TPOC) Move items from loading dock to final point of use Install the unit in the designated room Ensure proper electrical connection and operational functionality Verify instrument is operational through testing procedures Installation shall be performed by qualified field system engineers Engineers must possess appropriate manufacturer certifications and training Installation shall occur within 14 days of delivery Final acceptance documented by TPOC signature on Field Service Report
4.4 Training Requirements
The Contractor shall provide on-site training by qualified field application specialists for up to three (3) users per laboratory.
Training shall enable operators to independently operate the instrument and shall include:
System operation and functionality Sample processing procedures Software operation and data management Routine maintenance procedures Troubleshooting common issues Safety protocols The Contractor shall provide:
Training manuals (electronic and/or hard copy) Consumables for use during training exercises Quick reference guides Access to online resources and support materials Training shall be completed within 14 days of delivery Training schedule coordinated with laboratory TPOC
4.5 Warranty Requirements
The Contractor shall provide a minimum one (1) year warranty from the date of installation that includes:
Coverage on all non-consumable items and parts supplied, including the base instrument and accessories Parts and labor for repairs Unlimited telephone/email support for operational questions On-site service as needed for warranty repairs Warranty period starts on the date of formal government acceptance Continues for a minimum of one (1) year from installation acceptance date The Contractor shall respond to warranty service requests within two (2) business days On-site service shall be provided within five (5) business days when remote support cannot resolve the issue
4.6 Documentation and Reporting Requirements
Upon completion of each installation, the Contractor shall provide the end-user with a report containing:
Equipment name, manufacturer, model number, and serial number of each system Detailed description of installation performed Detailed description of on-site training performed Name(s) and contact information of engineer/specialist who performed installation and training All applicable warranty information Installation acceptance signature page The Contractor shall provide comprehensive warranty documentation including:
Terms and conditions of warranty coverage Procedures for requesting warranty service Contact information for technical support Warranty claim procedures
5. PERFORMANCE STANDARDS
5.1 Delivery Performance Standards
| Performance Metric |
| Standard |
| Measurement Method |
| On-time Delivery |
| 99% of deliveries within 90 days of award/order |
| Delivery receipt documentation |
| Delivery Condition |
| 99% of systems delivered without damage |
| Inspection at delivery |
| Complete Delivery |
| 99% of required components included |
| Component checklist verification |
5.2 Installation Performance Standards
| Performance Metric |
| Standard |
| Measurement Method |
| Installation Timeline |
| 99% completed within 14 days of delivery |
| Installation completion documentation |
| Operational Functionality |
| 99% of systems fully operational upon installation |
| Operational testing and TPOC verification |
| Installation Quality |
| Zero deficiencies requiring correction |
| TPOC inspection and acceptance |
5.3 Training Performance Standards
| Performance Metric |
| Standard |
| Measurement Method |
| Training Completion |
| 95% of training completed within 14 days of delivery |
| Training completion documentation |
| User Competency |
| 95% of trained users able to independently operate system |
| Post-training assessment |
| Training Materials |
| 95% of required materials provided |
| Materials checklist |
5.4 Warranty Performance Standards
| Performance Metric |
| Standard |
| Measurement Method |
| Response Time |
| 95% of requests acknowledged within 2 business days |
| Service request logs |
| Resolution Time |
| 90% of issues resolved within 5 business days |
| Service completion records |
| System Uptime |
| 95% system availability during warranty period |
| Downtime tracking |
6. SECURITY REQUIREMENTS
6.1 Information Technology Security
The Contractor shall ensure:
IT applications designed and developed for end users (including mobile applications and software licenses) run in the standard user context without requiring elevated administrative privileges Compliance with secure coding best practice requirements as directed by United States Computer Emergency Readiness Team (US-CERT) specified standards and the Open Web Application Security Project (OWASP) Protection of information deemed sensitive from unauthorized disclosure to persons, organizations, or subcontractors who do not have a need to know the information
6.2 Physical Security
The Contractor shall:
Take safety precautions prior to and during preventative maintenance and installation Be cleared by security as visitor(s) upon arrival to each facility Provide valid U.S. Real-ID with photo identification to check-in with Security Guards Coordinate with inside contractor regarding security clearance process before arrival
6.3 Data Protection
The Contractor shall protect information that is deemed sensitive or proprietary by HHS/FDA in accordance with the magnitude of the loss or harm that could result from inadvertent or deliberate disclosure, alteration, or destruction of the data.
7. INSPECTION AND ACCEPTANCE
7.1 Inspection Procedures
Inspection and acceptance will be performed at the delivery location (destination) The Technical Point of Contact (TPOC) will perform inspection upon delivery If damage is observed that does not penetrate through the shipping container, the receiver may open the container prior to acceptance Installation is overseen by the on-site Technical Point of Contact (TPOC) Final acceptance documented by TPOC signature on Field Service Report after installation
7.2 Acceptance Criteria
Systems will be accepted if:
All required components are present and undamaged Equipment matches specifications in contract Packaging and shipping documentation are complete Systems will be accepted if:
Equipment is properly installed in designated location All operational tests are successfully completed System demonstrates required performance characteristics Training has been completed satisfactorily
7.3 Acceptance Timeline
Acceptance is communicated in writing within 30 days of receipt of deliverable(s) If rejection is issued, Contractor shall correct deficiencies within 15 calendar days If Contractor cannot correct deficiencies within timeframe, Contractor shall immediately notify TPOC and provide corrective action plan within 3 business days
8. PERIOD OF PERFORMANCE
8.1 Blanket purchase Agreement (BPA)Period
The Blanket purchase agreement order period of performance begins on the date of contract award execution and extends for five years.
9. GOVERNMENT RESPONSIBILITIES
9.1 Technical Point of Contact (TPOC)
The Government will designate a TPOC at each laboratory location who will:
Coordinate delivery and installation schedules Perform inspection and acceptance Participate in training Serve as primary contact for warranty issues
9.2 Facility Access
The Government will:
Provide access to facilities during normal business hours (8:00 AM - 4:00 PM, Monday-Friday) Ensure security clearance procedures are followed Provide designated installation locations with appropriate utilities and space
9.3 Payment
The Government will make payment in accordance with the Prompt Payment Act upon satisfactory completion and acceptance of deliverables.
10. CONTRACTOR RESPONSIBILITIES
10.1 General Responsibilities
The Contractor shall:
Provide all resources necessary to accomplish tasks and deliverables described in this PWS Maintain communication with Government TPOCs Comply with all security requirements Maintain records of all deliveries, installations, training, and warranty services
10.2 Quality Assurance
The Contractor shall maintain quality assurance procedures to ensure:
Equipment meets manufacturer specifications Installation is performed to professional standards Training is effective and comprehensive Warranty services are responsive and effective
10.3 Subcontractor Management
If subcontractors are used, the Contractor shall:
Ensure subcontractors meet all requirements of this PWS Maintain oversight of subcontractor performance Ensure subcontractors comply with security requirements Remain responsible for all subcontractor performance
11. DELIVERABLES SUMMARY
| Deliverable |
| Quantity |
| Delivery Timeline |
| Acceptance Criteria |
| Maxwell RSC 48 Systems |
| 7 systems (initial) |
| Within 90 days of award |
| All components present, undamaged, operational |
| Installation Services |
| 7 installations |
| Within 14 days of delivery |
| System operational, TPOC acceptance |
| Training Services |
| Up to 3 users per lab (7 labs) |
| Within 14 days of delivery |
| Users demonstrate competency |
| Installation Reports |
| 7 reports |
| Upon installation completion |
| Complete documentation provided |
| Warranty Services |
| 7 systems |
| 12 months from installation |
| Responsive support, system uptime ≥95% |
Option Years 1-4: 1-2 systems per year with corresponding installation, training, reports, and warranty services following same standards.
12. POINTS OF CONTACT
12.1 Government Contacts
Primary Point of Contact: “To be determined” Contracting Officer Representative: “To be determined” Contracting Officer: Michele Jackson Michele.Jackon@fda.hhs.gov Laboratory TPOCs: To be identified at time of award
12.2 Contractor Contacts
The Contractor shall designate and provide contact information for:
Program Manager Installation Coordinator Training Coordinator Warranty/Technical Support Contact Page | 2
File details come from the government source that posted it. Updated .