Attachment 1 - Past Performance Survey - RFQ 75H70425Q00036.pdf

PDF 160 KB Posted

Attached to
Community Health Representative E-Learning Training
Solicitation number
75H70425Q
Issued by

About this file

This document is a Past Performance Survey from the Indian Health Service (IHS) for a Community Health Representative E-Learning Training Services solicitation. The survey is designed to collect detailed performance feedback from previous clients, with ratings across multiple categories including quality of service, cost control, timeliness of performance, business relations, and customer satisfaction.

The survey provides a comprehensive evaluation framework with ratings ranging from Excellent to Unacceptable, assessing specific aspects such as compliance with contract requirements, accuracy of reports, effectiveness of personnel, technical excellence, cost forecasting, milestone achievement, and overall customer satisfaction. The document is marked "SOURCE SELECTION SENSITIVE - NOT FOR PUBLIC RELEASE", indicating it is part of a confidential procurement process for evaluating potential contractors' past performance for the IHS e-learning training services contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT #1

DEPARTMENT OF HEALTH AND HUMAN SERVICES

Indian Health Service Past Performance Survey

Solicitation No.

Services

Contractor Name:

CLIENT INFORMATION

Commercial Client Federal Client Client Name:

Client Address:

City State Zip Code Project Name:

Contract Number(s): Total Contract Value:

Performance Period: Teaming Partner(s):

Government or Commercial Project Manager Contact

Alternate Government or Commercial Project Manager Contact

Name: Name:

Title: Title:

Phone number: Phone number:

Fax number: Fax number:

E-mail address:__ E-mail address:

SPECIFIC PERFORMANCE

Instructions: This part consists of open-ended questions to determine the scope, complexity, and relevance of the project to the current requirement. Please answer the questions concisely and to the best of your knowledge.

1. Describe the overall project type the contractor provided.

2. Describe the end goal/end product and result.

3. Describe the long-term program development involved in performing this task.

4. Describe the level of planning and staffing contractor was required to perform and if they met the contracts exceptions.

5. Describe the average timeline involved in completing this project and if contractor met that timeline within reason.

SOURCE SELECTION SENSITIVE

NOT FOR PUBLIC RELEASE

Past Performance Survey

PAST PERFORMANCE RATINGS

Please answer each of the following questions with a rating that is based on objective measurable performance indicators to the maximum extent possible. Comments to support ratings may be noted on last page. The Government will assess an overall past performance rating for each reference contacted. The overall ratings of each reference will then be combined to arrive at a final past performance rating that will be assigned points based upon the following rating scheme:

RATINGS ARE DEFINED AS FOLLOWS:

Definition Description

Excellent The Contractor demonstrates an excellent performance level in all categories. There have been no performance problems and the Contractor has demonstrated initiative to enhance/exceed contractual requirements and objectives.

The Contractor also has maintained an excellent Contractor/Government relationship throughout contract performance

Good There are no quality of service problems; no cost/price issues; and no delays. Responses to inquiries and technical/service administrative issues are consistently effective and responsive. Non-conformance does not impact achievement of contract requirements.

Acceptable Non-conformances are minor and have little impact in achievement of contract requirements, requires minor intervention by Government personnel to resolve issues.

Marginal Non-conformances are impacting achievement of contract requirements, requires substantial intervention by Government personnel to resolve issues.

Unacceptable Non-conformances are compromising the achievement of contract requirements, despite substantive intervention by Government personnel.

SOURCE SELECTION SENSITIVE

NOT FOR PUBLIC RELEASE

Pa st

P er fo rm an ce

S ur ve y

SO

U

R C

E

SE

LE

C

TI

O

N S

EN

SI

TI

VE

N

O T

FO

R

P U

BL

IC

R

EL

EA

SE

PA

R

T 1:

G

EN

ER

AL

P

ER

FO

R

M

AN

C E

IN

ST

R

UC

TI

O

N S:

P

LE

AS

E

C H

EC

K

T H

E

AP

PR

O

PR

IA

TE

R

AT

IN

G

Q ua lit y of

S er vi ce

Ex lle nt oo d Ac ce pt ab le

M ar gi na l

U na cc ep ta bl e

/A

1.

om pl ia nc e w ith c on tra ct re qu ire m en ts

2.

A cc ur ac y of R ep or

3.

ffe ct iv en es s of P er so nn el

4.

T ec hn ic al

E xc el le nc e

5.

ec or d of c on fo rm in g to s pe ci fic at io ns a nd an da rd s of g oo d w or km an sh ip

6.

bi lit y to p ro vi de s er vi ce s na tio nw id e, in cl ud in g sm al l a nd ru ra l c om m un iti es os t C on tro l

Ex ce d

Ac ce pt gi na l U na cc ep ta bl e ec or d of fo re ca st in g an d co nt ro llin g ta rg et co s ur re nt , a cc ur at e, a nd c om pl et e bi llin gs el at io ns hi p of n eg ot ia te d co st s to a ct ua l os t e ffi ci en ci

Ti m el in es s of P er fo rm an d

Ac ce pt gi na l U na cc ep ta bl e et in te rim m ile st on el ia bi lit y es po ns iv e to te ch ni ca l d ire ct io n om pl et ed o n tim e in cl ud in g w ra p up et d el iv er y sc he du m ou nt o f L iq ui da te d

D am ag

Pa

P er fo rm an ce

S ur ve y

SO

U

R C

E

SE

LE

C

TI

O

N S

EN

SI

TI

VE

T

FO

R

P U

BL

IC

R

EL

EA

SE

(E xc el le nt =L ow o r N on e, U na cc ep ta bl e=

H ig h)

B us in es s Re la tio ns d

Ac ce pt gi na l U na cc ep ta bl e ffe ct iv e M an ag em en t, in cl ud in g su bc on tra ct ea so na bl e/ co op er at iv e be ha vi es po ns iv e to c on tra ct re qu ire m en ot ifi ca tio n of p ro bl em

F le xi bi lit y

P ro -a ct iv e vs

. R ea ct iv e

7.

ffe ct iv e sm al l/s m al l d is ad va nt ag e bu si ne ss su bc on tra ct in g pr og ra m

8.

H is to ry o f s ta ff tu rn ov er us to m er S at is fa ct io n

Ex ce d

Ac ce pt gi na l U na cc ep ta bl e om m itm en t t o cu st om er s at is fa ct io n

W ou ld y ou re co m m en d se le ct io n of th is fi rm ag ai n?

ve ra ll R at in g of

C on tra ct

AD

D

IT

IO

N

AL

C

O M

M

EN

TS

File details come from the government source that posted it. Updated .