Attachment 1 - OPC Shore Tie Cables_DRAFT SOW.docx
DOCX document 35 KB Posted
- Attached to
- USCG - Fabrication and Delivery of Electrical Shore Tie Cables for the Offshore Patrol Cutter
- Solicitation number
- 70Z02324SOPCSHORETIE
About this file
This document is a Statement of Work (SOW) for the fabrication and delivery of electrical shore tie cables for the U.S. Coast Guard's Offshore Patrol Cutter (OPC) program. The SOW requires the contractor to fabricate five 300-foot and five 200-foot THOF-500E marine shore power cables with factory-vulcanized connector plugs, and deliver them to the USCG Base in Los Angeles/Long Beach, California. The period of performance is from contract award until June 1, 2025. This SOW is accompanied by a related pre-solicitation notice for the USCG's acquisition of these shore tie cables, which provides additional details on the planned procurement. The pre-solicitation requests information from interested vendors on their capabilities, past experience, and pricing to support the USCG's acquisition planning.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
WITH
THE MAJOR ACQUISITION SYSTEMS PROGRAM OFFICE, COMDT (CG-932 MASI), FOR POWER CABLE FABRICATION AND SHIPPING TO USCG BASE LOS ANGELES/LONG BEACH
| START: | Contract Award | |
| COMPLETE: | 01 June 2025 | |
| SHORT TITLE: | 9322-21-066 SHORE TIE CABLES & CABLE REELS |
1.0 BACKGROUND
USCG Base Los Angeles/Long Beach (LA/LB) requires shore power cables. Due to the mooring locations, pier configuration, and ship-side shore power connection locations at USCG Base LA/LB, 300-foot electrical shore power cables will be utilized by the OPC fleet in addition to the standard, shorter 200-foot cables.
2.0 SCOPE OF WORK
The scope of work includes the fabrication, packaging and shipment of five (5) 300-foot shore tie cables, and five (5) 200-foot shore power cables for use with the OPCs homeported at USCG Base LA/LB. The shore tie cables shall be three conductors 500 MCM enhanced THOF construction with factory vulcanized plugs on both ends.
Material must be packaged in such a manner as to afford adequate protection to the item against corrosion, deterioration, and physical damage during shipment from the supply course to Base LA/LB. Packaging shall provide adequate protection for warehouse storage.
3.0 REFERENCES AND DRAWINGS
Not applicable
4.0 GOVERNMENT FURNISHED INFORMATION (GFI)
Not applicable
5.0 TASKING/WORK REQUIREMENTS
5.1 Task 1 – Fabricate five (5) 300-foot THOF-500E marine shore power cables with connector plug (NSN 5935-01-037-9423) at each end. Connector plugs shall be factory potted (i.e. vulcanized) to cable ends.
5.2 Task 2 – Fabricate five (5) 200-foot THOF-500E marine shore power cables with connector plug (NSN 5935-01-037-9423) at each end. Connector plugs shall be factory potted (i.e. vulcanized) to cable ends.
5.3 Task 3 – Prepare Cables for Shipment to USCG Base LA/LB.
5.4 Task 4 – Ship ten (10) cables to Base LA/LB, 1001 South Seaside Ave. San Pedro, CA 90731.
6.0 GENERAL REQUIREMENTS AND DELIVERABLES
6.1 Monthly status report.
6.2 10 (10) shore power cables.
7.0 SECURITY REQUIREMENTS
Not applicable
8.0 ACCESS TO UNCLASSIFIED FACILITIES, INFORMATION TECHNOLOGY RESOURCES AND SENSITIVE INFORMATION REQUEST Not applicable
9.0 PROJECT PLAN
Not applicable
10.0 PERIOD OF PERFORMANCE
The period of performance (PoP) for this work is from date of award until 01 June 2025.
11.0 PLACE OF PERFORMANCE
The primary places of performance for this effort are the contractor’s facility and USCG Base LA/LB (San Pedro, CA), 1001 South Seaside Ave. San Pedro, CA 90731.
12.0 TRAVEL
Not applicable