Attachment 1 NWCC SCAN Maintenance Statement of Work.pdf
PDF 5 MB Posted
- Solicitation number
- 12FPC323Q0072
About this file
This is a statement of work for a federal contract solicitation to provide maintenance services for the USDA NRCS Soil Climate Analysis Network (SCAN). The contractor will perform maintenance on 103 SCAN monitoring sites located across 24 states and 25 months. Key requirements include replacing sensors and components, installing new equipment, and checking sensors according to detailed site-specific punchlists. The contractor must coordinate logistics, report work completion in an ArcGIS app, and is responsible for equipment safety and shipping. Personnel must have experience installing, maintaining and repairing weather station equipment and dataloggers. Work may require climbing towers and handling heavy equipment in all weather conditions. The solicitation was issued on 12FPC323Q0072 and responses are due based on dates listed in the 103-site punchlist spanning September 2023 through January 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12FPC323Q0072 Combined Synopsis-Solicitation NWCC SCAN Maintenance Svcs RFQ.pdf | ||
| Attachment 2 Quote Sheet.docx | DOCX document | |
| Attachment 3 Vendor Information Sheet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) for
Project: Soil Climate Analysis Network (SCAN) Maintenance
GENERAL INFORMATION
1.0 Scope: The United States Department of Agriculture (USDA) National Resources
Conservation Service (NRCS) National Water and Climate Center (NWCC) operates and maintains the Soil Climate Analysis Network (SCAN) stations across the US, including Alaska, Hawaii, Puerto Rico and the US Virgin Islands, with a focus on U.S. agricultural areas. Currently, there are 210 SCAN stations that provide soil and climatic data in near real-time that are used for agricultural practices and climate analysis. In addition to the SCAN stations, the agency is currently involved with assisting tribes in the installation of Tribal SCAN (TSCAN) stations on lands across the US, focused on agricultural lands situated on Tribal lands in the U.S.
SCAN is an essential tool for assessing climatic conditions, carrying out precision agriculture and drought mitigation. The Under Secretary for USDA held a workshop in January 2020 to bring together other federal agencies in supporting SCAN as a tool with multiple applications that fits in with mission priorities. The network has generated widespread interest across government agencies and the data provide a unique representation of local, regional and national soil characterizations and hydrology. To accurately assess conditions, a long-term record is required for each site that spans decades, and therefore it is critical to properly maintain the current network while expanding the number of stations in areas with sparse data coverage.
2.0 Background: SCAN data collection station sites collect hourly information on soil moisture content and soil temperature at standard depths (2, 4, 8, 20, and 40 inches), air temperature, relative humidity, solar radiation, wind speed/ direction and liquid precipitation. Each station consists of a tower (typically 20 ft high), electronics box and soil probes. The sites utilize sensors for data collection and use primarily Cellular Telemetry, but in some cases, satellite transmitters are used. Sites are powered by 12-volt batteries that are charged by solar panels. Each site requires annual maintenance which includes changing out certain site components, maintaining site vegetation and making minor repairs. There are some sites that may require significant repairs that will require specialized experience and expertise related to electronics and the physical ability to climb towers and handle heavy and awkward loads (e.g., batteries, antennas, and solar panels).
SCAN is the largest comprehensive soil moisture monitoring network in existence and the only broad-scale network established with the purpose of collecting soil climate (temperature and moisture) data. There are many requests for new SCAN stations all the time from federal partners and the NRCS States across the US. In addition, there are guidelines set down by the Chief of NRCS as outlined in
National Instruction 450-303-NI, 1st Ed., Amend. 1, Mar 2018) 303-1 – Guidance on Soil Climate Analysis Network (SCAN) Station Investment related to external requests for new SCAN stations.
CONTRACTOR REQUIREMENTS
3.0 Technical Requirements/Tasks:
• The Contractor shall perform all duties as prescribed in the SCAN site punch list to the standards defined by the SCAN Maintenance Manual.
4.0 Government Furnished:
• All SCAN Site components and replacement parts will be provided by the government. Field verification devices will also be provided by the government.
5.0 Deliverables / Schedule:
Pre-Trip Planning
• 1. Site Location Information Most stations are located on Government or university property; however, some stations are located on private land. GPS Required.
• 2. IMPORTANT: Always contact the landowner prior to going to the SCAN station location.
Key Deliverables Item No.
Deliverable/ Item Title
Description
Frequency
Reference
Delivery Format
Due By
1 Comprehensive Site Visit Report
Site Visit Report that details all activities including repair, Maintenance along with site photos before and after. Completion of Metadata Report
Same Day
SCAN
Station visit submitted via ArcGIS Survey123 App https://survey1 23.arcgis.com/
ArcGIS Survey12 3 App via tablet or smart phone
On the same day SCAN site Maintenance is completed
6.0 Travel: SCAN site travel is referenced on the punch list and is based on coordinate locations GPS is required.
7.0 Contractor’s Key Personnel:
• The Contractor shall provide Field Technicians for continued maintenance of the NRCS SCAN network. The Field Technician shall be able to Climb ladders excavate holes, install sensors and equipment.
• The Field Technician shall have ten years’ experience with diagnosing and troubleshooting and repairing electronic equipment in the field. Also, ten years’ of field experience with installation, maintenance and repair of Campbell Scientific dataloggers, soil moisture probes, telemetry, and weather station instrumentation.
The work may take place in extreme environments mainly hot and humid conditions, but some sites and seasons may be on the cold extreme. Work continues in rainy and windy conditions (if not unsafe). A current Driver’s license is required for this position. Many sites are 4-wheel drive access only so contractor must have access to an appropriate off road vehicle. Contractor is also responsible for the safety and accountability of all supplies and equipment during transportation to the site.
8.0 Security Requirements: N/A
9.0 Data Rights: All data produced by the SCAN network is property of NRCS
10.0 Section 508 – Electronic and Information Technology Standards: N/A
Attachment:
SCAN site Maintenance punch list with locations. Please note that Maintenance must adhere to the timeline specified on the Scan Site Maintenance Punchlist. Please make note of the additional bullet item requirements on the Scan Site Maintenance Punchlist.
Tools List that the contractor will need is referenced in the SCAN Maintenance Manual page 7 and 8
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
• Contractor must coordinate a logistics meeting with SCAN staff to discuss scheduling and shipping details at least one month prior to the start of work.
• One week prior to scheduled work, contractor must reach out to SCAN staff for an updated sensor malfunction list and confirm maintenance schedule or provide updates (if any).
• Site maintenance must be completed within the maintenance windows listed on the punchlist.
o If special circumstances arise for date of completion for any work, it must be discussed with and approved by SCAN staff.
• Random audit of work - Proof of checklist items will be required in the form of photos taken after the completion of work and emailed to SCAN staff, when requested.
o These are separate from photos required to complete Survey123 and should include such things as proof of sensor level, sensor installation and maintenance, etc.
• Take pictures of surrounding area if any debris and waste are present and upload photos to site issue section in Survey123
• Return shipping will be paid for by the contractor and must be coordinated with SCAN staff.
o All return items must be packaged with care and, where indicated, in accordance with the punchlist instructions.
o Ensure to label returned components with the site they were taken out of. Do not write on the component or box.
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
Watkinsville #1 Wedowee
NB: 2/2024
NLT: 6/2024
NB: 5/2024
NLT: 9/2024
NB: 8/2024
NLT: 12/2024
NB: 5/2024
NLT: 9/2024
NB: 8/2024
NLT: 12/2024
Contract X/XX/23 Last contract award 8/29/22
Lehman Levelland
Reese Center
Johnson Farm
NB: 11/2023
NLT: 4/2024
NB: 4/2024
NLT: 8/2024
NB: 9/2024
NLT: 1/2025
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2057 – AAMU-JTG, AL Analog CR1000X Not Before Complete NLT Dec 23 Apr 24
• Ensure battery will fit in upper NEMA;
• Install new battery in NEMA;
• Remove lower battery NEMA, dispose of old cabinet and batteries appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace anemometer, return old sensor for calibration;
• Check all analog soil sensors and replace any nonfunctioning sensors
2078 – Bragg Farm, AL Analog CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Check all analog soil sensors and replace any nonfunctioning sensors;
• Replace NEMA gasket
2055 – Hodges, AL SDI-12 CR1000X Not Before Complete NLT
• Lower ROHN tower stinger;
• Install new solar panel, dispose of old panel(s) appropriately;
• Move NEMA to ROHN tower (will need cables for everything);
• Move existing battery;
• Add cross-arms to ROHN tower;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket, return old sensor in TB packaging;
• Install new anemometer on tower arm, return old sensor for calibration;
• Check all SDI-12 soil sensors and replace any nonfunctioning sensors
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2056 – Stanley Farm, AL Analog CR1000X Not Before Complete NLT
• Install new solar panel, dispose of old panel(s) appropriately;
• Replace upper NEMA with new NEMA, o return old NEMA with internal components, minus the transmitter, to SCAN staff,
• Move existing battery to NEMA;
• Install existing transmitter in NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately,
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace tipping bucket, return old sensor in TB packaging;
• Replace anemometer, return old sensor for calibration;
• Check all analog soil sensors and replace any nonfunctioning sensors;
• Install three grounding rods according to the diagram in Appendix A
Site visit note: Vegetation management and tree removal required
2179 – Sudduth Farms, AL SDI-12 CR1000X Not Before Complete NLT
Dec 23 Apr 24
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket, return old sensor in TB packaging;
• Replace anemometer – wind direction is bad. Return old sensor in anemometer packaging;
• Replace all cables in enclosure;
• Check all SDI-12 soil sensors and replace any nonfunctioning sensors;
• Replace NEMA gasket;
• Replace all Hollaender Clamps
Site visit note: Vegetation management and tree removal required
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2053 – Wtars, AL Analog CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Install new battery in NEMA;
• Remove lower battery NEMA, dispose of old cabinet and batteries appropriately;
• Replace JL-2 solar regulator;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket, return old sensor in TB packaging;
• Replace anemometer, return old sensor for calibration;
• Replace Hollaender clamps
2079 – Mammoth Cave, KY Analog CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Replace JL-2 solar regulator;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace anemometer, return old sensor for calibration;
• Remove old TE-525 TB and pole from the ground, dispose of appropriately
2005 – Princeton #1, KY Analog CR1000X Not Before Complete NLT
• Install cross-arm on opposite side of Temp/RH arm;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Temp/RH – Install new HMP155 head, return old sensor in protective packaging for calibration;
• Remove shelter building footings
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2076 – Allen Farms, TN Analog CR1000X Not Before Complete NLT
• Install new solar panel, dispose of old panel(s) appropriately;
• Replace upper NEMA with new NEMA, o return old NEMA with internal components, minus the transmitter, to SCAN staff,
• Install new battery in NEMA;
• Install existing transmitter in NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately,
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket, return old sensor in TB packaging;
• Replace anemometer, return old sensor for calibration;
• Remove rotten tie down straps;
• Check all analog soil sensors and replace any nonfunctioning sensors;
• Install three grounding rods according to the diagram in Appendix A
Site visit note: Use brushcutter to clear vegetation from station enclosure and apply pesticide. Excessive ants and hornets. Enclosure area 20ft by 20ft
2077 – Eastview Farm, TN Analog CR1000X Not Before Complete NLT
Dec 23 Apr 24
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket, return old sensor in TB packaging;
2075 – McAllister Farm, TN Analog CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Install new battery in NEMA;
• Remove lower battery NEMA, dispose of old cabinet and batteries appropriately;
• Replace solar regulator;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket, return old sensor in TB packaging;
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2177 – Broad Acres, AL SDI-12 CR1000X Not Before Complete NLT
Jan 24 May 24
• Install new solar panel, dispose of old panel(s) appropriately;
• Replace upper NEMA with new NEMA, o return old NEMA with internal components, minus the transmitter, to SCAN staff;
• Install new battery in NEMA;
• Install existing transmitter in NEMA;
• Remove lower battery NEMA, dispose of old cabinet and batteries appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket, return old sensor in TB packaging;
• Replace anemometer, return old sensor for calibration;
• Check all SDI-12 soil sensors and replace any nonfunctioning sensors;
• Replace Holleander clamps;
• Install three grounding rods according to the diagram in Appendix A
Site visit note: Need to keep removing trees, use a brushcutter to clear vegetation
2113 – Cullman-NAHRC, AL Analog CR1000X Not Before Complete NLT
Jan 24 May 24
• Install new solar panel, dispose of old panel(s) appropriately;
• Replace upper NEMA with new NEMA, o return old NEMA with internal components, minus the transmitter, to SCAN staff;
• Move existing battery to NEMA;
• Install existing transmitter in NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately,
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket cable;
• Replace anemometer (2023), return old sensor for calibration;
• Check all analog soil sensors and replace any nonfunctioning sensors;
• Replace Holleander clamp holding WS/WD arm;
• Install three grounding rods according to the diagram in Appendix A
Site visit note: use a brushcutter to clear vegetation
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2173 – Isbell Farms, AL GOES SDI-12 CR1000 Not Before Complete NLT
• Install new solar panel, dispose of old panel(s) appropriately;
• Replace upper NEMA with new NEMA, o return old NEMA with internal components, minus the transmitter, to SCAN staff;
• Install new battery in NEMA;
• Install existing transmitter in NEMA;
• Replace satellite antenna coax;
• Remove lower battery NEMA, dispose of old cabinet and batteries appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket, return old sensor in TB packaging;
• Replace anemometer, return old sensor for calibration;
• Check all SDI-12 soil sensors and replace any nonfunctioning sensors ;
2114 – Livingston-UWA, AL SDI-12 CR1000X Not Before Complete NLT
• Install new solar panel, dispose of old panel(s) appropriately;
• Replace upper NEMA with new NEMA, o return old NEMA with internal components, minus the transmitter, to SCAN staff;
• Move existing battery to NEMA;
• Install existing transmitter in NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately,
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace tipping bucket, return old sensor in TB packaging;
• Replace anemometer, return old sensor for calibration;
• Check all SDI-12 soil sensors and replace any nonfunctioning sensors ;
• Replace fence corner posts
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2178 – Morris Farms, AL SDI-12 CR1000 Not Before Complete NLT
• Install new solar panel, dispose of old panel(s) appropriately;
• Replace upper NEMA with new NEMA, o return old NEMA with internal components, minus the transmitter, to SCAN staff;
• Install new battery in NEMA;
• Install existing transmitter;
• Remove lower battery NEMA, dispose of old cabinet and batteries appropriately,
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket cable;
• Replace anemometer, return old sensor for calibration;
• Check all SDI-12 soil sensors and replace any nonfunctioning sensors ;
2176 – Selma, AL SDI-12 CR1000X Not Before Complete NLT
• Install new solar panel, dispose of old panel(s) appropriately;
• Replace upper NEMA with new NEMA, o return old NEMA with internal components, minus the transmitter, to SCAN staff;
• Install new battery in NEMA;
• Install existing transmitter in NEMA;
• Remove lower battery NEMA, dispose of old cabinet and battery appropriately,
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket, return old sensor in TB packaging;
• Replace anemometer, return old sensor for calibration;
• Check all SDI-12 soil sensors and replace any nonfunctioning sensors;
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2115 – Tuskegee, AL Analog CR1000X Not Before Complete NLT
• Install new solar panel, dispose of old panel(s) appropriately;
• Replace NEMA with new NEMA, o return old NEMA with internal components, minus the transmitter, to SCAN staff;
• Install new battery in NEMA;
• Install existing transmitter in NEMA;
• Remove lower battery NEMA, dispose of old cabinet and batteries appropriately,
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket cable;
• Replace anemometer, return old sensor for calibration;
• Check all analog soil sensors and replace any nonfunctioning sensors;
• Need to bring bow saw or other to finish cutting down pine tree at ground;
• Repair fence corner and wire
2175 – Wedowee, AL SDI-12 (4) CR1000X Not Before Complete NLT
• Install new solar panel, dispose of old panel(s) appropriately;
• Replace NEMA with new NEMA, o return old NEMA with internal components, minus the transmitter, to SCAN staff;
• Install new battery in NEMA;
• Install existing transmitter in NEMA;
• Remove lower battery NEMA, dispose of old cabinet and batteries appropriately,
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket cable;
• Replace anemometer, return old sensor for calibration;
• Check all SDI-12 soil sensors and replace any nonfunctioning sensors;
• Vegetation management badly needed
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2083 – Uapb Campus-PB, AR Analog CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Replace Genasun solar regulator;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket, return old sensor in TB packaging;
2091 – Uapb Dewitt, AR Analog CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Replace Genasun solar regulator;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket, return old sensor in TB packaging;
• Replace anemometer, return old sensor in anemometer packaging;
2085 – Uapb-Earle, AR Analog CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace tipping bucket, return old sensor in TB packaging;
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2030 – Uapb-Lonoke Farm, AR SDI-12 CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace tipping bucket, return old sensor in TB packaging;
2084 – Uapb-Marianna, AR Analog CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Replace JL-2 solar regulator;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace tipping bucket, return old sensor in TB packaging;
2090 – Uapb Point Remove, AR Analog CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace tipping bucket, return old sensor in TB packaging;
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2013 – Watkinsville #1, GA SDI-12 CR1000X Not Before Complete NLT
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket, return old sensor in TB packaging;
• Replace anemometer, return old sensor in anemometer packaging;
• Check all SDI-12 soil sensors and replace any nonfunctioning sensors;
• Replace NEMA gasket;
• Replace rusted out soils NEMA;
• Vegetation management badly needed
2034 – Tunica, MS SDI-12 CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Replace Genasun solar regulator;
• Check solar panel – replace if necessary;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace tipping bucket, return old sensor in TB packaging;
• Check all SDI-12 soil sensors and replace any nonfunctioning sensors
2174 – Dee River Ranch, AL SDI-12 CR1000 Not Before Complete NLT
Feb 24 Jun 24
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace anemometer, return old sensor for calibration;
• Replace datalogger with CR1000X, return old datalogger in CR1000X packaging;
• Check all other SDI-12 soil sensors and replace any nonfunctioning sensors
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2032 – Beasley Lake, MS Analog CR1000X Not Before Complete NLT Feb 24 Jun 24
• Install new solar panel, dispose of old panel(s) appropriately;
• Replace NEMA with new NEMA, o return old NEMA with internal components, minus the transmitter, to SCAN staff;
• Move existing battery to NEMA;
• Install existing transmitter in NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately,
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace tipping bucket cable;
• Replace anemometer, return old sensor in anemometer packaging;
2024 – Goodwin Ck Pasture, MS Analog CR1000X Not Before Complete NLT
• Install new solar panel, dispose of old panel(s) appropriately;
• Replace NEMA with new NEMA, o return old NEMA with internal components, minus the transmitter, to SCAN staff;
• Move existing battery to NEMA;
• Install existing transmitter in NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately,
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace tipping bucket, return old sensor in TB packaging;
• Replace anemometer, return old sensor for calibration;
• Replace rusted soils NEMA;
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2025 – Goodwin CK Timber, MS Analog CR1000X Not Before Complete NLT
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace tipping bucket, return old sensor in TB packaging;
• Replace terminal strips some corrosion;
• Check all analog soil sensors and replace any nonfunctioning sensors
Site visit note: use a brushcutter to clear vegetation. Red ant insecticide needed. Wasps in shelter
2110 – Mayday, MS Analog CR1000X Not Before Complete NLT
Feb 24 Jun 24
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Replace Genasun solar regulator;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Check all other analog soil sensors and replace any nonfunctioning sensors
Site visit note: sensors 15 ft above ground
2087 – North Issaquena, MS SDI-12 CR1000X Not Before Complete NLT
Feb 24 Jun 24
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Replace Genasun solar regulator;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket, return old sensor in TB packaging;
• Replace anemometer, return old sensor for calibration;
• Bring new stinger nuts and bolts
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2033 – Onward, MS Analog CR1000X Not Before Complete NLT
• Install new solar panel, dispose of old panel(s) appropriately;
• Replace NEMA with new NEMA, o return old NEMA with internal components, minus the transmitter, to SCAN staff;
• Move existing battery to NEMA;
• Install existing transmitter in NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately,
• Replace Holleander clamp for AT/RH cross arm;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace tipping bucket, return old sensor in TB packaging;
o Install conduit to cover TB cable until full rebuild can take place;
• Replace anemometer, return old sensor for calibration;
2046 – Perthshire, MS SDI-12 CR1000X Not Before Complete NLT
• Replace solar panel wire;
• May need new battery – dropping to 11V (battery new in 2023);
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA or install new one;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Replace solar regulator;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket, return old sensor in TB packaging;
• Replace anemometer, return old sensor for calibration;
• Replace Holleander clamps
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2109 – Sandy Ridge, MS Analog CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Check all other analog soil sensors and replace any nonfunctioning sensors
2070 – Scott, MS SDI-12 CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Replace Genasun solar regulator;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace tipping bucket, return old sensor in TB packaging;
• Check all SDI-12 soil sensors and replace any nonfunctioning sensors;
• Replace all Holleander clamps
Site visit note: use a brushcutter to clear vegetation
2086 – Silver City, MS Analog CR1000X Not Before Complete NLT
Feb 24 Jun 24
• Hit by tornado. NOT REPORTING – full rebuild;
• Install tower;
• Install NEMA;
• Return all internal and external components from old NEMA to SCAN staff,
• Install cross arms;
• Install “T” cross-arm on Temp/RH arm according to specs and new HMP155. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace tipping bucket, return old sensor in TB packaging;
• Replace anemometer, return old sensor for calibration;
• Replace pyranometer, return old sensor for calibration;
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2064 – Starkville, MS SDI-12 CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
2035 – Vance, MS Analog CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Install new battery in NEMA;
• Remove lower battery NEMA, dispose of old cabinet and batteries appropriately;
• Replace Genasun solar regulator;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, dispose of old sensor appropriately;
• Replace tipping bucket, dispose of TE gauge;
• Replace anemometer, return old sensor for calibration;
• Replace AM 4/16 multiplexer;
• Check all analog soil sensors and replace any nonfunctioning sensors
• Remove MCC antenna and dispose of appropriately
2049 – Powder Mill, MD Analog CR1000X Not Before Complete NLT
Feb 24 Jun 24
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2008 – Tidewater #1, NC Analog CR1000X Not Before Complete NLT
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Check all analog soil sensors and replace any nonfunctioning sensor
2011 – Geneva #1, NY SDI-12 CR1000X Not Before Complete NLT
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Replace solar regulator;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace rusted out soils NEMA
2014 – Molly Caren #1, OH SDI-12 CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Replace JL-2 solar regulator;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
2028 – Mahantango Ck, PA Analog CR1000X Not Before Complete NLT
• Replace solar regulator;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace snow depth sensor with Sommer and install adequate snow depth target if none currently exists;
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2036 – Rock Springs Pa, PA Analog CR1000X Not Before Complete NLT
• Install new solar panel, dispose of old panel(s) appropriately;
• Replace upper NEMA with new NEMA, o return old NEMA with internal components, minus the transmitter, to SCAN staff;
• Move existing battery to NEMA;
• Install existing transmitter in NEMA;
• Remove lower battery NEMA, dispose of old cabinet and batteries appropriately,
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Install new tipping bucket cable;
• Replace anemometer (2023), return old sensor for calibration;
• Check all analog soil sensors and replace any nonfunctioning sensors
• Add Sommer snow depth sensor and install adequate snow depth target;
2039 – N Piedmont Arec, VA Analog CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
2089 – Reynolds Homestead, VA SDI-12 CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Replace solar panel wires (butt splices);
• Replace JL-2 solar regulator (2004);
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor and cable (pin holes in cable), return old sensor for calibration;
Site visit note: Lots of ants at this site
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2088 – Shenandoah, VA Analog CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace anemometer, return old sensor for calibration;
• Check all analog soil sensors and replace any nonfunctioning sensors
2022 – Fort Reno #1, OK SDI-12 CR1000 Not Before Complete NLT
Apr 24 Aug 24
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace anemometer, return old sensor for calibration;
• Replace datalogger with CR1000X, return old datalogger in CR1000X packaging;
• Check all SDI-12 soil sensors and replace any nonfunctioning sensors;
• Remove debris around site
Site visit note: Lots of debris around site - watch your tires
2207 – Beaumont, TX SDI-12 CR1000X Not Before Complete NLT
Apr 24 Aug 24
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2006 – Bushland #1, TX Analog CR1000X Not Before Complete NLT Apr 24 Aug 24
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
2206 – Kingsville, TX SDI-12 CR1000X Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
2201 – Knox City, TX SDI-12 CR1000 Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
• Replace tipping bucket, return old sensor in TB packaging;
2106 – Lehman, TX Analog CR1000X Not Before Complete NLT
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
SCAN Site Maintenance Punchlist 103 Sites 24-25 Contract
2105 – Levelland, TX Analog CR1000X Not Before Complete NLT
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
2228 – Nacogdoches, TX SDI-12 CR1000 Not Before Complete NLT
• Ensure battery will fit in upper NEMA;
• Move existing battery to NEMA;
• Remove lower battery NEMA, dispose of old cabinet appropriately;
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head. Return old sensor in protective packaging for calibration;
• Install ST300 temperature sensor inside RAD06 shield according to installation instructions to be provided by Oct 1, 2023;
• Pyranometer – Install new Apogee sensor, return old sensor for calibration;
2016 – Prairie View, TX Analog CR1000X Not Before Complete NLT
• Install “T” cross-arm on Temp/RH arm according to specs;
• Move Temp/RH to new T cross-arm location and install new HMP155 head.