Attachment 1 NSW 8m SSC SOW.docx
DOCX document 64 KB Posted
- Attached to
- Repower 8MSC (SUZUKI BRAND NAME)
- Solicitation number
- H9224024Q0022
- Issued by
-
United States Special Operations Command
About this file
This document is a Statement of Work (SOW) for the repower of four 8-meter Surface Support Craft (SSC) hulls with new Suzuki engines. The work includes removing the existing engine, steering, and control systems and installing new Suzuki DF250APXX engines, SeaStar hydraulic steering components, and Suzuki control systems. Specific tasks include providing a detailed schedule, delivering the boats, performing engine, controls, and hardware work, cleaning and preparing the boats for shipment, and conducting waterborne trials. The SOW references relevant technical manuals and provides detailed requirements for the equipment, materials, and services required.
The related federal contract opportunity is a solicitation for the engine repower services described in the SOW. This is a firm-fixed price commercial services contract issued under simplified acquisition procedures. The solicitation number is H9224024Q0022, and it is being issued by the United States Special Operations Command. Vendors must submit quotes by the due date of June 28, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA 8m SSC Engine Repower to Suzuki Redacted.pdf | ||
| Attachment 2 DoL WD 2015-5635 Rev 24.pdf | ||
| H9224024Q0022 FINAL 240625.pdf | ||
| Attachment 3 - Quote Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
SHIP: Surface Support Craft (SSC)
8MSC
1. SCOPE:
1.1 TITLE: Engine Repower of Four Workskiff Hulls 8MSC accomplish
1.2 LOCATION:
1.2.1 Vendors Location
1.3 IDENTIFICATION:
1.3.1 Quantity (One EA), 8 Meter, (OPEN), Hull Identification Number: 8MSC1604
1.3.2 Quantity (One EA), 8 Meter, (OPEN), Hull Identification Number: 8MSC1603 (Optional CLIN)
1.3.3 Quantity (One EA), 8 Meter, (OPEN), Hull Identification Number: 8MSC1602 (Optional CLIN)
1.3.4 Quantity (One EA), 8 Meter, (Enclosed Cabin), Hull Identification Number: 1507 (Optional CLIN)
2. REFERENCES:
2.1 Additional references depending on Hull
2.2 Suzuki Engine Manual; K13-DF250AP-99011-98J20-03BEN
2.3 Evinrude G2 Inspection and Maintenance Schedule
2.4 BRP G2 Evinrude Installation and Predelivery Guide
2.5 Attachment-1 Rev-1 (G2 Evinrude Engines Class B Overhaul)
2.6 SeaStar – Hydraulic Assist Pump Install Manual
2.7 SeaStar – Liquid Alignment Tiebar Valve Installation Instructions
3. REQUIREMENTS:
3.1 Schedule: Provide a detailed schedule to the SUPERVISOR/TPOC no later than 7 days after the start date outlining the following events with targeted completion dates:
3.1.1 Total availability timeframe is 4 weeks upon receipt of new Suzuki engines and all required rigging equipment.
3.1.2 Delivery of boat/trailer
3.1.3 Engine work
3.1.4 Controls and steering work
3.1.5 Hardware work
3.1.6 Cleanliness and preparation for shipment work
3.1.7 Waterborne Trials
3.1.8 Turnover of boat/trailer
3.2 Equipment:
3.2.1 Workskiff Hull 1604-8MSC and option CLIN’s for1603, 1602, and 1507-8MSC will be staged on trailer to facilitate work at vendors facility, all lifting support will be provided by vendor.
3.2.2 All new threaded fasteners must be corrosion resistant steel (CRES), ASTM A276, Type 316, unless otherwise specified. All nuts must be self-locking type, unless otherwise specified. One CRES washer must be used under each bolt head and under each nut. Bolt/stud length must not exceed less than 1-1/2 threads or more than 5 threads beyond the nut with full thread engagement.
3.2.3 Apply anti-seize compound, Tef-Gel anti-seize lubricant or equal to all new stainless steel threaded fasteners.
3.2.4 All new equipment mounted to aluminum must have corrosion protection tape (3M Scotchrap #51) installed between the mating surfaces unless otherwise noted.
3.3 Engine:
3.3.1 Provide materials and services to procure and install new port and starboard Suzuki engines (Suzuki part number DF250APXX0) in accordance with Reference 2.2.
3.3.2 Provide materials and services to procure and install SeaStar Tournament Series Adjustable tie bar kit for 15” to 20.5” (TFX HO6821), in accordance with Reference 2.2.
3.3.3 Provide materials and services to procure and install new Suzuki Watergrip 3x16x18.5 port and starboard propellers (Suzuki part number 990C0-0081L-185 and 990C0-00810-185), and two (2) propeller hub kits (Suzuki part number 57630-92L00 in accordance with Reference 2.2.
3.3.4 Provide materials and services to remove existing port and starboard engine cable protective hoses and end caps procure and install new port and starboard engine cable protective hoses and end caps in accordance with Reference 2.2. Template exact size, length, configuration, and location from existing boat conditions.
3.3.5 An authorized Suzuki dealer must setup and verify all engine related work listed in Paragraphs 3.5.24 through 3.5.27 in accordance with Reference 2.2 and 009-90 of Reference 2.1.
3.4 Controls and Steering:
3.4.1 Provide materials and services to remove existing engine and trim control cables, binnacle, gauges, engine harnesses, engine GPS Antenna, and associated hardware. Procure and install new Dual Engine SPC 2.0 Kit (Suzuki part number 67000-98L20), 21’ Harness (Suzuki part number 36620-98L00), Panel assembly, main switch (Suzuki part number 37100-98L10), 2’ Harness extension (Suzuki part number 990C0-88104), Wire Comp Gauge Adapter (Suzuki part number 36667-96L40), 2 Multifunction Gauge (Suzuki part number 34077-96L42), 2’ N2K cable (Suzuki part number 990C0-88L00-KIT), Backbone T (Suzuki part number 990C0-88110), Fluid Level Sensor (Suzuki part number 990C0-88217), GPS Module (Suzuki part number 990C0-88122), Battery Isolator Lead Set (Suzuki part number 33830-98J11), and all additional cabling and hardware in accordance with the manufacturer’s instructions for installing the Suzuki DF250APXX engines. GPS Module antenna shall be installed on the starboard side of the hardtop, outboard of the radar scanner. Contractor is responsible to install all components necessary to convert boat to Suzuki DF250APXX engines in accordance with manufacturer specifications, using 2.2 for guidance.
3.4.2 Provide materials and services to remove the existing ignition switch, kill switch and Evinrude dual switch panel assembly and associated cabling and procure and install new ignition switch (Honeywell part number 1TL1-2D), kill switch (Sierra part number MP40970-1), dual switch panel assembly (Suzuki part number 37100-98J21), and cabling in accordance with manufacturer’s instructions. The new ignition switches, kill switch, and dual switch panel assembly shall be connected to the new Suzuki system using 2.2 for guidance. Connect switches to the new engine wiring harness using Deutsch connectors vice cutting the harness.
3.4.2.1 All harness installed shall be procured in accordance with appropriate length for boat. No connections shall take place in bilge bottom.
3.4.2.2 Technical Representative shall update the display software to the current version.
3.4.3 Provide materials and services to remove the existing steering system in its entirety to include steering wheel, tilt helm pump, and hydraulic lines and procure and install new steering wheel, steering wheel cap, steering wheel knob, tilt helm pump (Teleflex part number HH6543), power assist pump (Teleflex part number PA1200-2), and port and starboard steering cylinders (Teleflex part number HC6845), Hardware mounting kit (Teleflex part number HA6804), (11) hydraulic lines of appropriate length for installing new steering system in craft, (4) Thru-hull fittings class 3000 aluminum Cplg ¼ (McMaster part number 3867T61), (18) Compression fittings straight (SeaStar part number HF5528), (8) Compression fittings elbow (SeaStar part number HF5529), (2) T fittings (SeaStar part number HF5530), and Alignment Valve (SeaStar part number HA5471-2) in accordance 2.34 and 2.35; 11X42-AS-01 Auxiliary Systems and SeaStar manufacturer’s instructions. Template size, length, and location from existing boat conditions with modified configuration for new equipment. New hydraulic lines shall be routed to new port and starboard engine in accordance with manufacturer’s instructions.
3.4.3.1 Provide material and services to measure and identify length and quantity of hoses required to mount power assist and alignment valve in port transom compartment.
3.4.3.2 Provide materials and services to fill and bleed the hydraulic steering system and refill to proper level with new steering fluid in accordance with Reference 2.6, 2.7 and manufacturer’s instructions.
3.4.3.3 New steering thru hull fittings installed in transom to be located 2 each port and starboard under rigging tube hole.
3.4.4 Provide materials and services to dress and secure all engine and steering control system hoses/cables throughout boat, including chaffing protection at all penetrations.
3.4.5 All harnesses/hoses installed must be procured in accordance with appropriate length for boat. No connections must take place in bilge bottom.
3.4.6 An authorized Suzuki dealer must ensure the display and engine software is the current version and setup and verify all controls and steering related work listed in Paragraphs 3.6.1 through 3.6.5 in accordance with Reference 2.2.
3.5 Hardware:
3.5.1 Provide materials and services to remove the existing console face plate and install new console face plate ensuring all controls and gauges are in correct positions and functioning properly.
3.6 Cleanliness and Preparation for Shipment:
CHECK POINT: (V) (G) “VISUAL INSPECTION”
3.6.1 Clean all work areas ensuring there are no loose materials and tools left on craft. All metal remanence from drilling and cutting will be vacuumed.
3.7 Removed Items/Scrap Disposal:
3.7.1 Retain all removed items for disposition instructions by SUPERVISOR/TPOC. At the discretion of SUPERVISOR/TPOC, box all removed items for turnover upon boat turnover.
3.7.2 All government scrap resulting from accomplishment of work under this contract is to the property of the contractor to be disposed as it sees fit. Scrap is defined as property that has no reasonable prospect of being sold except for the recovery value of its basic material content. The determination as to which materials are scrap and which materials are salvage, will be made, or concurred in, by the SUPERVISOR/TPOC.
3.8 Waterborne Trials:
3.8.1 Final Waterborne Trial: Customer Trials: Waterborne acceptance trials are to be performed after satisfactory completion of discrepancies noted by SUPERVISOR/TPOC, confirmation that all contracted work has been accomplished successfully and all systems are operating properly. Provide appropriate personnel, and supplies to accomplish a two-hour waterborne trial, to demonstrate and test all work accomplished. Test location will be determined by SUPERVISOR/TPOC and will be within one hour of the contractor’s facility. Correct all contract discrepancies noted by SUPERVISOR/TPOC during trials. Perform subsequent trial(s) as necessary to verify corrected discrepancies.
3.8.2 Submit legible copies, one in hard and one in electronic format, with recommended repairs of any hull, mechanical, electrical, and accessory discrepancy found during the performance of 3.8.1 to the SUPERVISOR/TPOC within 24 hours of completion of inspection and testing.
3.8.3 Command will be responsible for the crafts delivery to and from boat launch ramp for all necessary sea trials to prove all work has been completed in accordance with SOW.
4. NOTES:
4.1 Craft will be delivered to the vendor upon award.
4.2 The Base Craft should be bid based on earliest timeline for completion.
4.3 The Optional craft should be bid with the opportunity to be exercised up until December 31, 2024.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 NONE
Page 1 of 14 Zodiac R103 SOW
Page 3 of 3 Workskiff Hull 8MSC Engine Repower SOW