ATTACHMENT 1 -NB688000-26-02413 Requirements and Specifications.pdf
PDF 533 KB Posted
- Attached to
- Time Scale Synthesizers Federal contract opportunity
- Solicitation number
- NB688000-26-02413
About this file
This is a Requirements/Specification Document for Time Scale Synthesizers issued by NIST's Physical Measurements Lab, Time and Frequency Division (Request NB688000-26-02413).
NIST seeks four (4) Time Scale Output Synthesizers designed to realize continuous time scale output with programmed phase and frequency differences relative to an input reference signal from an atomic clock. The synthesizers must feature very low additive phase noise, deterministic phase tunability at microradians or lower, phase-continuous operation during frequency tuning and phase adjustments, engineering for continuous multi-year operation, and coherence between radio-frequency and pulse-per-second outputs. Key specifications include: 10 MHz input reference frequency (preferred) or 5 MHz termination at 50 Ohms; programmable fractional frequency tuning range exceeding 1e-10 with precision at or below 1e-17; additive phase noise less than -100 dB/Hz at 1 Hz offset or ADEV(1s) below 3e-13; phase programmability resolution under 1 picosecond (63 microradians at 10 MHz); phase slewing capability with fractional frequency deviation bounded to 1e-10; at least two radio-frequency outputs at 10 dBm or greater; at least one PPS output capable of driving 3V into 50 Ohm; PPS input acceptance for coarse synchronization; programming interface via RS-232, USB, or Ethernet (preferred); acceptance of 120V or 208V AC at 60 Hz or 24V DC backup power; and EIA 19-inch rack mount compatibility with device width under 482.6 mm. Delivery of all units, installation, and training must be completed within 12-18 weeks after receipt of order, with two units delivered to Boulder, Colorado and two to Gaithersburg, Maryland. Electronic manuals are required, and planned government acceptance testing will occur within 7 business days. Installation, training, warranty beyond base manufacturer coverage, maintenance, and travel are not required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NB688000-26-02413 RFQ BEST VALUE.pdf | ||
| ATTACHMENT 2 - PROVISIONS AND CLAUSES.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Re qu ire m en ts
Sp ec ifi ca tio n Do cu m en t
Requirements / Specifications: Time Scale Synthesizers 1 Version 1.0 (2019) Double-click on for further assistance.
Use this document to detail specifications/requirements for an item and/or ancillary services.
TITLE: Time Scale Synthesizers Requesting Lab/Division/Group: Physical Measurements Lab/Time and Frequency Division/Time Realization and Distribution Group
NB688000-26-02413
General Statement of Need NIST requires high-precision synthesizers meant to realize a continuous time scale output in terms of programmed phase- and frequency-differences with respect to an input reference signal derived from a single atomic clock. Unlike typical radio-frequency synthesizers, time scale output synthesizers feature a) very low additive phase noise, b) deterministic phase tunability at the level of microradians or lower, c) phase-continuous operation even when frequency tuning or adjusting the phase (“phase slewing”), d) engineering to ensure continuous operation over years, and e) coherence between outputs at radio-frequency and pulse-per-second (PPS) formats.
Items and/or Ancillary Services
Item 1: Time Scale Output Synthesizer Quantity: Four (4) Specifications:
1.1 - Input reference frequency 10 MHz (preferred) or 5 MHz (only if 10 MHz is unavailable), termination as 50 Ohms.
1.2 - Programmable fractional frequency tuning range > 1e-10 with a precision <= 1e-17.
1.3 - Additive phase noise < -100 dB/Hz at 1 Hz offset from carrier (10 MHz), or as ADEV(1 s) < 3e-13.
1.4 - Phase programmability resolution < 1 ps, or equivalently, < 63 microradians at 10 MHz
1.5 - Phase smoothly adjustable by “slewing” a programmed phase correction over a programmable (or sufficiently long) time interval, such that the instantaneous fractional frequency deviation from nominal may be bounded to 1e- 10 in magnitude.
1.6 - At least two radio-frequency outputs (>= +10 dBm).
1.7 - At least one pulse-per-second (PPS) output capable of driving 3V into 50 Ohm (or equivalently, TTL levels).
1.8 - Accepts an input pulse-per-second (PPS) signal for coarse synchronization (+/- 50 ns for 10 MHz carriers, +/- 100 ns for 5 MHz).
1.9 - Programming interface by RS-232 (serial), USB, or Ethernet (preferred).
1.10 - Accepts 120V or 208V AC power at 60 Hz.
1.11 - Accepts 24V dc power as a backup or auxiliary source.
1.12 - Compatible with standard EIA (19”) equipment rack mounting, device width < 482.6 mm.
Separately Priced Options and Services:
Item 2: [List minimum specifications.
Quantity: [Enter quantity here.] Specifications: [Enter quantity here.]
[List any other item(s) or service requirements here using the same format above.] ire m en ts
Sp ec ifi ca tio n Do cu m
Requirements / Specifications: Time Scale Synthesizers 2
Service Requirements / Item Specifications
Section Requirements/Specifications Planning Considerations ☒ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain requirement here] ☐ US citizen required on-site (foreign nationals require preregistration 30 days prior) ☐ Vendor rep on-site more than three days ☐ Other considerations: [List other considerations to ensure an accurate quote]
Shipping & Delivery ☐ N/A
[Enter shipping and delivery information by item here.] Shipping criteria:
☐ Partial delivery acceptable ☐ Direct delivery to building required [Explain need for requirement here] Building has: ☐ Loading dock ☐ Containerization preference: [Choose container] Other requirements: [List any other requirements here] Delivery date criteria:
☒ Delivery of goods, installation, and training shall be completed no later than:
12-18 weeks ARO ☐ Deliver no earlier than: [Insert date here] ☒ Other: Deliver quantity 2 to 325 Broadway, Boulder CO 80305, and quantity 2 to 100 Bureau Drive, Gaithersburg MD 20899.
Electronic Media ☐ N/A
[Enter electronic media requirements by item here.] ☐ Software ☒ Electronic manuals ☐ License Key ☐ Other: [List any other Electronic Media requirements here] [Enter email address for software delivery here]
Installation ☒ N/A
[Enter installation requirements by item here.] ☐ Vendor technician on site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of packaging material ☐ Equipment set up ☐ Start-up services ☐ Turn key installation ☐ Other [Enter details here.] Note: When installation is required, TPOC or COR shall be the coordination point.
Facility / Utility Considerations ☒ N/A
[List site specific utility considerations by item here.] ☐ OFPM Work Order Number(s) [List any Work Order Number(s) here] ☐ Power available Voltage: [Enter voltage here] (V) ire m en ts
Sp ec ifi ca tio n Do cu m
Requirements / Specifications: Time Scale Synthesizers 3
Max Current: [Enter max current draw here] (A) Phase: [Choose phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter plug type here] (i.e.: NEMA L5-20P) Environment: [Choose environment] Other power consideration: [List any other power considerations here] ☐ Utility connections: [List relevant available utilities, pressure(s), and flowrate(s)] ☐ Other considerations: [List other considerations to ensure an accurate quote]
Warranty ☐ N/A
Base Manufacturer Warranty is acceptable [If you require an Extended Manufacturer Warranty, describe the warranty requirements per item here.] What is included?
☐ Labor ☐ Parts ☐ Travel ☐ Cost and liability for returns ☐ Other: [Enter other requirements here] ☐ Warranty length: [Enter warranty length here] Period Length:[Ex. month, 6 month, year etc.]
Training ☒ N/A
[Training requirements (who, when, what, where) here. If on-site, is travel necessary?] ☐ On-site ☐ Off-site location: [Enter location(s) here] ☐ Number of trainees: [Enter number of trainees here] Scope of training:
☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other: [Enter other scope requirements here] ☐ Training materials to be provided: [Describe requirement here] ☐ Other: [Enter other training requirements here] Note: When training is required, TPOC or COR shall be the coordination point.
Inspection and Acceptance ☐ N/A
[Enter inspection requirements per item here] ☒ Planned government acceptance testing (7 business days) ☐ Gov’t acceptance expected to take longer than 7 business days: [Duration] ☐ Inspection and acceptance plan: [Explain here] ☐ Other: [Enter other requirements here]
Maintenance ☒ N/A
[Describe your maintenance requirements per item here] Period Length: [Ex. month, 6 month, year etc.] What is included?
☐ Labor ☐ Spare parts ☐ Consumables ☐ Travel ☐ Cost and liability for returns ☐ Software updates ☐ Manuals ire m en ts
Sp ec ifi ca tio n Do cu m
Requirements / Specifications: Time Scale Synthesizers 4
☐ Service plan length: [Enter service plan length here] ☐ Other: [Enter other requirements here] ☐ Requirements: [Enter requirements here] (i.e.: onsite within 72 hours, etc.)
☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4
Government Furnished Material / Equipment ☒ N/A
[List any government furnished material/equipment per item here] ☐ Samples for testing ☐ Government equipment which will leave gov't site (TPOC must coordinate with division property custodian) Serial Number: [Enter Serial Number here] Description: [Enter description here] NIST property number: [Enter NIST property number here] ☐ Other: [Enter other details here]
Travel ☒ N/A
[Describe any travel requirements per item here] ☐ Explain: [Explain here] ☐ Other: [Enter other requirements here] Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.
Provide suggestions to improve this form by clicking here.
File details come from the government source that posted it. Updated .