This solicitation requests proposals for construction management services to support the Naval Facilities Engineering Command Pacific Area of Responsibility. Services shall be provided primarily for the Shipyard Infrastructure Optimization Program, Joint Task Force Red Hill, Defense Policy Review Initiative, and Pacific Deterrence Initiative. The period of performance is one base year plus four 12-month option periods. Proposals are due by noon on May 22, 2023 and shall be submitted electronically through the Procurement Integrated Enterprise Environment. Questions regarding this solicitation are due by May 8, 2023. The place of performance includes locations throughout the Far East, Marianas, Australia, Hawaii, Northwest, and Southwest regions in the Naval Facilities Engineering Command Pacific Area of Responsibility. The North American Industry Classification System code for this requirement is 236220 with a small business size standard of $45 million. This is an 8(a) competitive solicitation.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule B
| SCHEDULE B |
| SUPPLIES OR SERVICES AND PRICES |
| Offerors shall enter the proposed fully burdened hourly rate for each labor classification listed. The Schedule B fully burdened hourly rates, if accepted by the Government, shall |
| become a part of the resultant contract. Pricing of Task Orders will be negotiated utilizing the Schedule B fully burdened hourly rates. Work that is not covered by one of the specific |
| labor classifications identified in this contract, but which is within the contract scope and general intent, may be negotiated by the Contracting Officer on an as-needed basis. |
| Offerors shall utlize proposed productive hours for each labor classification to develop the fully burdened hourly rates, which shall be rounded to the nearest two decimal places. |
ITEM GOVERNMENT LABOR CATEGORY LOCATION CONTRACTOR EQUIVALENT LABOR CATEGORY BASE PERIOD OPTION PERIOD 1 OPTION PERIOD 2 OPTION PERIOD 3 OPTION PERIOD 4
| 1-HI | Construction Manager Contractor Support (CMCS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2-HI | Engineering Technician Contractor Support (ETCS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3-HI | Scheduler Contractor Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4-HI | Design Technical Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5-HI | Program Coordinator | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6-HI | Commisioner | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7-HI | Program / Project Risk Analyst | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8-HI | Senior Program Manager | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 9-HI | Munitions and Explosives of Concern (MEC) Quality Assurance | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10-HI | Crane / Weight Handling Inspector | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 11-HI | Elevator Inspector | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 12-HI | Construction Safety Oversight - Certified Safety Professional (CSP) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 13-HI | Construction Safety Oversight - Safety Trained Supervisor (STS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 14-HI | C4IT Infrastructure Quality Assurance Technician Contractor Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1-FE | Construction Manager Contractor Support (CMCS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2-FE | Engineering Technician Contractor Support (ETCS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3-FE | Scheduler Contractor Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4-FE | Design Technical Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5-FE | Program Coordinator | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6-FE | Commisioner | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7-FE | Program / Project Risk Analyst | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8-FE | Senior Program Manager | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 9-FE | Munitions and Explosives of Concern (MEC) Quality Assurance | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10-FE | Crane / Weight Handling Inspector | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 11-FE | Elevator Inspector | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 12-FE | Construction Safety Oversight - Certified Safety Professional (CSP) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 13-FE | Construction Safety Oversight - Safety Trained Supervisor (STS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 14-FE | C4IT Infrastructure Quality Assurance Technician Contractor Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1-NW | Construction Manager Contractor Support (CMCS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2-NW | Engineering Technician Contractor Support (ETCS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3-NW | Scheduler Contractor Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4-NW | Design Technical Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5-NW | Program Coordinator | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6-NW | Commisioner | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7-NW | Program / Project Risk Analyst | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8-NW | Senior Program Manager | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 9-NW | Munitions and Explosives of Concern (MEC) Quality Assurance | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10-NW | Crane / Weight Handling Inspector | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 11-NW | Elevator Inspector | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 12-NW | Construction Safety Oversight - Certified Safety Professional (CSP) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 13-NW | Construction Safety Oversight - Safety Trained Supervisor (STS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 14-NW | C4IT Infrastructure Quality Assurance Technician Contractor Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1-SW | Construction Manager Contractor Support (CMCS) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2-SW | Engineering Technician Contractor Support (ETCS) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3-SW | Scheduler Contractor Support | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4-SW | Design Technical Support | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5-SW | Program Coordinator | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6-SW | Commisioner | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7-SW | Program / Project Risk Analyst | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8-SW | Senior Program Manager | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 9-SW | Munitions and Explosives of Concern (MEC) Quality Assurance | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10-SW | Crane / Weight Handling Inspector | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 11-SW | Elevator Inspector | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 12-SW | Construction Safety Oversight - Certified Safety Professional (CSP) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 13-SW | Construction Safety Oversight - Safety Trained Supervisor (STS) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 14-SW | C4IT Infrastructure Quality Assurance Technician Contractor Support | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1-GU | Construction Manager Contractor Support (CMCS) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2-GU | Engineering Technician Contractor Support (ETCS) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3-GU | Scheduler Contractor Support | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4-GU | Design Technical Support | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5-GU | Program Coordinator | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6-GU | Commisioner | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7-GU | Program / Project Risk Analyst | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8-GU | Senior Program Manager | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 9-GU | Munitions and Explosives of Concern (MEC) Quality Assurance | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10-GU | Crane / Weight Handling Inspector | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 11-GU | Elevator Inspector | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 12-GU | Construction Safety Oversight - Certified Safety Professional (CSP) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 13-GU | Construction Safety Oversight - Safety Trained Supervisor (STS) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 14-GU | C4IT Infrastructure Quality Assurance Technician Contractor Support | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1-AUS | Construction Manager Contractor Support (CMCS) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2-AUS | Engineering Technician Contractor Support (ETCS) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3-AUS | Scheduler Contractor Support | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4-AUS | Design Technical Support | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5-AUS | Program Coordinator | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6-AUS | Commisioner | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7-AUS | Program / Project Risk Analyst | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8-AUS | Senior Program Manager | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 9-AUS | Munitions and Explosives of Concern (MEC) Quality Assurance | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10-AUS | Crane / Weight Handling Inspector | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 11-AUS | Elevator Inspector | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 12-AUS | Construction Safety Oversight - Certified Safety Professional (CSP) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 13-AUS | Construction Safety Oversight - Safety Trained Supervisor (STS) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 14-AUS | C4IT Infrastructure Quality Assurance Technician Contractor Support | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Page &P of &N &A
JB-1_Summary
| ATTACHMENT JB-1 - PRICE SUMMARY WORKSHEET (Note 1) |
| ALL YEARS |
| ITEM | GOVERNMENT LABOR CATEGORY | LOCATION | CONTRACTOR EQUIVALENT LABOR CATEGORY | TOTAL LABOR & FRINGE BENEFITS | |||||
| (Note 2) | OTHER DIRECT COST (ODC) | ||||||||
| (Note 3) | TOTAL DIRECT COST | MARKUP % | |||||||
| (Note 4) | TOTAL | ||||||||
| 1-HI | Construction Manager Contractor Support (CMCS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-HI | Engineering Technician Contractor Support (ETCS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-HI | Scheduler Contractor Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-HI | Design Technical Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-HI | Program Coordinator | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-HI | Commisioner | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-HI | Program / Project Risk Analyst | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-HI | Senior Program Manager | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-HI | Munitions and Explosives of Concern (MEC) Quality Assurance | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-HI | Crane / Weight Handling Inspector | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-HI | Elevator Inspector | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-HI | Construction Safety Oversight - Certified Safety Professional (CSP) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-HI | Construction Safety Oversight - Safety Trained Supervisor (STS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-HI | C4IT Infrastructure Quality Assurance Technician Contractor Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-FE | Construction Manager Contractor Support (CMCS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-FE | Engineering Technician Contractor Support (ETCS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-FE | Scheduler Contractor Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-FE | Design Technical Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-FE | Program Coordinator | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-FE | Commisioner | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-FE | Program / Project Risk Analyst | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-FE | Senior Program Manager | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-FE | Munitions and Explosives of Concern (MEC) Quality Assurance | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-FE | Crane / Weight Handling Inspector | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-FE | Elevator Inspector | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-FE | Construction Safety Oversight - Certified Safety Professional (CSP) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-FE | Construction Safety Oversight - Safety Trained Supervisor (STS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-FE | C4IT Infrastructure Quality Assurance Technician Contractor Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-NW | Construction Manager Contractor Support (CMCS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-NW | Engineering Technician Contractor Support (ETCS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-NW | Scheduler Contractor Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-NW | Design Technical Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-NW | Program Coordinator | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-NW | Commisioner | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-NW | Program / Project Risk Analyst | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-NW | Senior Program Manager | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-NW | Munitions and Explosives of Concern (MEC) Quality Assurance | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-NW | Crane / Weight Handling Inspector | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-NW | Elevator Inspector | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-NW | Construction Safety Oversight - Certified Safety Professional (CSP) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-NW | Construction Safety Oversight - Safety Trained Supervisor (STS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-NW | C4IT Infrastructure Quality Assurance Technician Contractor Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-SW | Construction Manager Contractor Support (CMCS) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-SW | Engineering Technician Contractor Support (ETCS) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-SW | Scheduler Contractor Support | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-SW | Design Technical Support | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-SW | Program Coordinator | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-SW | Commisioner | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-SW | Program / Project Risk Analyst | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-SW | Senior Program Manager | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-SW | Munitions and Explosives of Concern (MEC) Quality Assurance | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-SW | Crane / Weight Handling Inspector | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-SW | Elevator Inspector | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-SW | Construction Safety Oversight - Certified Safety Professional (CSP) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-SW | Construction Safety Oversight - Safety Trained Supervisor (STS) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-SW | C4IT Infrastructure Quality Assurance Technician Contractor Support | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-GU | Construction Manager Contractor Support (CMCS) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-GU | Engineering Technician Contractor Support (ETCS) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-GU | Scheduler Contractor Support | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-GU | Design Technical Support | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-GU | Program Coordinator | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-GU | Commisioner | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-GU | Program / Project Risk Analyst | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-GU | Senior Program Manager | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-GU | Munitions and Explosives of Concern (MEC) Quality Assurance | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-GU | Crane / Weight Handling Inspector | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-GU | Elevator Inspector | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-GU | Construction Safety Oversight - Certified Safety Professional (CSP) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-GU | Construction Safety Oversight - Safety Trained Supervisor (STS) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-GU | C4IT Infrastructure Quality Assurance Technician Contractor Support | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-AUS | Construction Manager Contractor Support (CMCS) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-AUS | Engineering Technician Contractor Support (ETCS) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-AUS | Scheduler Contractor Support | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-AUS | Design Technical Support | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-AUS | Program Coordinator | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-AUS | Commisioner | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-AUS | Program / Project Risk Analyst | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-AUS | Senior Program Manager | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-AUS | Munitions and Explosives of Concern (MEC) Quality Assurance | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-AUS | Crane / Weight Handling Inspector | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-AUS | Elevator Inspector | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-AUS | Construction Safety Oversight - Certified Safety Professional (CSP) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-AUS | Construction Safety Oversight - Safety Trained Supervisor (STS) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-AUS | C4IT Infrastructure Quality Assurance Technician Contractor Support | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Note 1 - Attachment JB-1 Price Summary Worksheet illustrates a required format. Offerors shall not deviate from the basic format of the forms identified in this solicitation. The Price Proposal shall include the |
| completed mandatory forms and supporting information in the general format outlined. |
| Note 2 - Hourly rate shall include fringe benefits, as applicable (i.e., statutory (FICA, FUTA, SUTA), Insurances, other benefits paid by the employer). |
| Note 3 - At a minimum, Offerors shall propose ODC at the Contract level in accordance with PWS Section 2.16 Contractor Furnished Resources |
| (1) Personal Protective Equipment (PPE), equipment, office supplies; |
| (2) Communication equipment & accessories/services - laptop, software, cell phone & service, internet connection. |
| * Any ODCs that are dependent on the scope of work, if required, shall be proposed at the individual Task Order level and negotiated separately. |
| Note 4 - Markup % shall include indirect costs (i.e. Overhead, General & Administrative, etc.), and Profit. Provide a detailed supporting wirtten narrative to clearly identify the types of costs included. The Mark-Up |
| percentage will be applied to Total Direct Costs (i.e. Labor & Fringe Benefits, ODCs (if applicable)) and will remain in effect for the life of the contract. Round all Mark-Up percentages to the nearest two decimal |
| places. The Mark-Up percentage shall include location specific taxes (i.e., Hawaii GET, Guam BPT, etc.). |
N62742-22-R-3611
Page &P of &N &A
JB-1_Base
| ATTACHMENT JB-1 - PRICE SUMMARY WORKSHEET (Note 1) |
| BASE PERIOD |
| 12 MONTH(S) |
| A | ITEM | GOVERNMENT LABOR CATEGORY | LOCATION | CONTRACTOR EQUIVALENT LABOR CATEGORY | TOTAL LABOR & FRINGE BENEFITS | ||||
| (Note 2) | OTHER DIRECT COST (ODC) | ||||||||
| (Note 3) | TOTAL DIRECT COST | MARKUP % | |||||||
| (Note 4) | TOTAL | ||||||||
| 1-HI | Construction Manager Contractor Support (CMCS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-HI | Engineering Technician Contractor Support (ETCS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-HI | Scheduler Contractor Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-HI | Design Technical Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-HI | Program Coordinator | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-HI | Commisioner | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-HI | Program / Project Risk Analyst | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-HI | Senior Program Manager | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-HI | Munitions and Explosives of Concern (MEC) Quality Assurance | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-HI | Crane / Weight Handling Inspector | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-HI | Elevator Inspector | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-HI | Construction Safety Oversight - Certified Safety Professional (CSP) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-HI | Construction Safety Oversight - Safety Trained Supervisor (STS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-HI | C4IT Infrastructure Quality Assurance Technician Contractor Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-FE | Construction Manager Contractor Support (CMCS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-FE | Engineering Technician Contractor Support (ETCS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-FE | Scheduler Contractor Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-FE | Design Technical Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-FE | Program Coordinator | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-FE | Commisioner | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-FE | Program / Project Risk Analyst | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-FE | Senior Program Manager | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-FE | Munitions and Explosives of Concern (MEC) Quality Assurance | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-FE | Crane / Weight Handling Inspector | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-FE | Elevator Inspector | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-FE | Construction Safety Oversight - Certified Safety Professional (CSP) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-FE | Construction Safety Oversight - Safety Trained Supervisor (STS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-FE | C4IT Infrastructure Quality Assurance Technician Contractor Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-NW | Construction Manager Contractor Support (CMCS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-NW | Engineering Technician Contractor Support (ETCS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-NW | Scheduler Contractor Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-NW | Design Technical Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-NW | Program Coordinator | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-NW | Commisioner | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-NW | Program / Project Risk Analyst | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-NW | Senior Program Manager | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-NW | Munitions and Explosives of Concern (MEC) Quality Assurance | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-NW | Crane / Weight Handling Inspector | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-NW | Elevator Inspector | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-NW | Construction Safety Oversight - Certified Safety Professional (CSP) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-NW | Construction Safety Oversight - Safety Trained Supervisor (STS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-NW | C4IT Infrastructure Quality Assurance Technician Contractor Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-SW | Construction Manager Contractor Support (CMCS) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-SW | Engineering Technician Contractor Support (ETCS) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-SW | Scheduler Contractor Support | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-SW | Design Technical Support | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-SW | Program Coordinator | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-SW | Commisioner | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-SW | Program / Project Risk Analyst | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-SW | Senior Program Manager | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-SW | Munitions and Explosives of Concern (MEC) Quality Assurance | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-SW | Crane / Weight Handling Inspector | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-SW | Elevator Inspector | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-SW | Construction Safety Oversight - Certified Safety Professional (CSP) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-SW | Construction Safety Oversight - Safety Trained Supervisor (STS) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-SW | C4IT Infrastructure Quality Assurance Technician Contractor Support | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-GU | Construction Manager Contractor Support (CMCS) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-GU | Engineering Technician Contractor Support (ETCS) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-GU | Scheduler Contractor Support | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-GU | Design Technical Support | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-GU | Program Coordinator | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-GU | Commisioner | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-GU | Program / Project Risk Analyst | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-GU | Senior Program Manager | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-GU | Munitions and Explosives of Concern (MEC) Quality Assurance | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-GU | Crane / Weight Handling Inspector | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-GU | Elevator Inspector | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-GU | Construction Safety Oversight - Certified Safety Professional (CSP) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-GU | Construction Safety Oversight - Safety Trained Supervisor (STS) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-GU | C4IT Infrastructure Quality Assurance Technician Contractor Support | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-AUS | Construction Manager Contractor Support (CMCS) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-AUS | Engineering Technician Contractor Support (ETCS) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-AUS | Scheduler Contractor Support | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-AUS | Design Technical Support | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-AUS | Program Coordinator | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-AUS | Commisioner | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-AUS | Program / Project Risk Analyst | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-AUS | Senior Program Manager | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-AUS | Munitions and Explosives of Concern (MEC) Quality Assurance | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-AUS | Crane / Weight Handling Inspector | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-AUS | Elevator Inspector | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-AUS | Construction Safety Oversight - Certified Safety Professional (CSP) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-AUS | Construction Safety Oversight - Safety Trained Supervisor (STS) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-AUS | C4IT Infrastructure Quality Assurance Technician Contractor Support | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Note 1 - Attachment JB-1 Price Summary Worksheet illustrates a required format. Offerors shall not deviate from the basic format of the forms identified in this solicitation. The Price Proposal shall include the |
| completed mandatory forms and supporting information in the general format outlined. |
| Note 2 - Hourly rate shall include fringe benefits, as applicable (i.e., statutory (FICA, FUTA, SUTA), Insurances, other benefits paid by the employer). |
| Note 3 - At a minimum, Offerors shall propose ODC at the Contract level in accordance with PWS Section 2.16 Contractor Furnished Resources |
| (1) Personal Protective Equipment (PPE), equipment, office supplies; |
| (2) Communication equipment & accessories/services - laptop, software, cell phone & service, internet connection. |
| * Any ODCs that are dependent on the scope of work, if required, shall be proposed at the individual Task Order level and negotiated separately. |
| Note 4 - Markup % shall include indirect costs (i.e. Overhead, General & Administrative, etc.), and Profit. Provide a detailed supporting wirtten narrative to clearly identify the types of costs included. The Mark-Up |
| percentage will be applied to Total Direct Costs (i.e. Labor & Fringe Benefits, ODCs (if applicable)) and will remain in effect for the life of the contract. Round all Mark-Up percentages to the nearest two decimal |
| places. The Mark-Up percentage shall include location specific taxes (i.e., Hawaii GET, Guam BPT, etc.). |
N62742-22-R-3611
Page &P of &N &A
JB-1_Opt 1
| ATTACHMENT JB-1 - PRICE SUMMARY WORKSHEET (Note 1) | |
| OPTION PERIOD 1 | |
| 12 MONTHS |
| B | ITEM | GOVERNMENT LABOR CATEGORY | LOCATION | CONTRACTOR EQUIVALENT LABOR CATEGORY | TOTAL LABOR & FRINGE BENEFITS | ||||
| (Note 2) | OTHER DIRECT COST (ODC) | ||||||||
| (Note 3) | TOTAL DIRECT COST | MARKUP % | |||||||
| (Note 4) | TOTAL | ||||||||
| 1-HI | Construction Manager Contractor Support (CMCS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-HI | Engineering Technician Contractor Support (ETCS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-HI | Scheduler Contractor Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-HI | Design Technical Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-HI | Program Coordinator | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-HI | Commisioner | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-HI | Program / Project Risk Analyst | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-HI | Senior Program Manager | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-HI | Munitions and Explosives of Concern (MEC) Quality Assurance | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-HI | Crane / Weight Handling Inspector | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-HI | Elevator Inspector | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-HI | Construction Safety Oversight - Certified Safety Professional (CSP) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-HI | Construction Safety Oversight - Safety Trained Supervisor (STS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-HI | C4IT Infrastructure Quality Assurance Technician Contractor Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-FE | Construction Manager Contractor Support (CMCS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-FE | Engineering Technician Contractor Support (ETCS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-FE | Scheduler Contractor Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-FE | Design Technical Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-FE | Program Coordinator | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-FE | Commisioner | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-FE | Program / Project Risk Analyst | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-FE | Senior Program Manager | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-FE | Munitions and Explosives of Concern (MEC) Quality Assurance | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-FE | Crane / Weight Handling Inspector | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-FE | Elevator Inspector | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-FE | Construction Safety Oversight - Certified Safety Professional (CSP) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-FE | Construction Safety Oversight - Safety Trained Supervisor (STS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-FE | C4IT Infrastructure Quality Assurance Technician Contractor Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-NW | Construction Manager Contractor Support (CMCS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-NW | Engineering Technician Contractor Support (ETCS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-NW | Scheduler Contractor Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-NW | Design Technical Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-NW | Program Coordinator | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-NW | Commisioner | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-NW | Program / Project Risk Analyst | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-NW | Senior Program Manager | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-NW | Munitions and Explosives of Concern (MEC) Quality Assurance | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-NW | Crane / Weight Handling Inspector | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-NW | Elevator Inspector | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-NW | Construction Safety Oversight - Certified Safety Professional (CSP) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-NW | Construction Safety Oversight - Safety Trained Supervisor (STS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-NW | C4IT Infrastructure Quality Assurance Technician Contractor Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-SW | Construction Manager Contractor Support (CMCS) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-SW | Engineering Technician Contractor Support (ETCS) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-SW | Scheduler Contractor Support | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-SW | Design Technical Support | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-SW | Program Coordinator | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-SW | Commisioner | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-SW | Program / Project Risk Analyst | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-SW | Senior Program Manager | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-SW | Munitions and Explosives of Concern (MEC) Quality Assurance | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-SW | Crane / Weight Handling Inspector | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-SW | Elevator Inspector | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-SW | Construction Safety Oversight - Certified Safety Professional (CSP) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-SW | Construction Safety Oversight - Safety Trained Supervisor (STS) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-SW | C4IT Infrastructure Quality Assurance Technician Contractor Support | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-GU | Construction Manager Contractor Support (CMCS) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-GU | Engineering Technician Contractor Support (ETCS) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-GU | Scheduler Contractor Support | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-GU | Design Technical Support | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-GU | Program Coordinator | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-GU | Commisioner | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-GU | Program / Project Risk Analyst | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-GU | Senior Program Manager | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-GU | Munitions and Explosives of Concern (MEC) Quality Assurance | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-GU | Crane / Weight Handling Inspector | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-GU | Elevator Inspector | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-GU | Construction Safety Oversight - Certified Safety Professional (CSP) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-GU | Construction Safety Oversight - Safety Trained Supervisor (STS) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-GU | C4IT Infrastructure Quality Assurance Technician Contractor Support | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-AUS | Construction Manager Contractor Support (CMCS) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-AUS | Engineering Technician Contractor Support (ETCS) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-AUS | Scheduler Contractor Support | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-AUS | Design Technical Support | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-AUS | Program Coordinator | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-AUS | Commisioner | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-AUS | Program / Project Risk Analyst | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-AUS | Senior Program Manager | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-AUS | Munitions and Explosives of Concern (MEC) Quality Assurance | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-AUS | Crane / Weight Handling Inspector | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-AUS | Elevator Inspector | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-AUS | Construction Safety Oversight - Certified Safety Professional (CSP) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-AUS | Construction Safety Oversight - Safety Trained Supervisor (STS) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-AUS | C4IT Infrastructure Quality Assurance Technician Contractor Support | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Note 1 - Attachment JB-1 Price Summary Worksheet illustrates a required format. Offerors shall not deviate from the basic format of the forms identified in this solicitation. The Price Proposal shall include the |
| completed mandatory forms and supporting information in the general format outlined. |
| Note 2 - Hourly rate shall include fringe benefits, as applicable (i.e., statutory (FICA, FUTA, SUTA), Insurances, other benefits paid by the employer). |
| Note 3 - At a minimum, Offerors shall propose ODC at the Contract level in accordance with PWS Section 2.16 Contractor Furnished Resources |
| (1) Personal Protective Equipment (PPE), equipment, office supplies; |
| (2) Communication equipment & accessories/services - laptop, software, cell phone & service, internet connection. |
| * Any ODCs that are dependent on the scope of work, if required, shall be proposed at the individual Task Order level and negotiated separately. |
| Note 4 - Markup % shall include indirect costs (i.e. Overhead, General & Administrative, etc.), and Profit. Provide a detailed supporting wirtten narrative to clearly identify the types of costs included. The Mark-Up |
| percentage will be applied to Total Direct Costs (i.e. Labor & Fringe Benefits, ODCs (if applicable)) and will remain in effect for the life of the contract. Round all Mark-Up percentages to the nearest two decimal |
| places. The Mark-Up percentage shall include location specific taxes (i.e., Hawaii GET, Guam BPT, etc.). |
N62742-22-R-3611
Page &P of &N &A
JB-1_Opt 2
| ATTACHMENT JB-1 - PRICE SUMMARY WORKSHEET (Note 1) | |
| OPTION PERIOD 2 | |
| 12 MONTHS |
| C | ITEM | GOVERNMENT LABOR CATEGORY | LOCATION | CONTRACTOR EQUIVALENT LABOR CATEGORY | TOTAL LABOR & FRINGE BENEFITS | ||||
| (Note 2) | OTHER DIRECT COST (ODC) | ||||||||
| (Note 3) | TOTAL DIRECT COST | MARKUP % | |||||||
| (Note 4) | TOTAL | ||||||||
| 1-HI | Construction Manager Contractor Support (CMCS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-HI | Engineering Technician Contractor Support (ETCS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-HI | Scheduler Contractor Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-HI | Design Technical Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-HI | Program Coordinator | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-HI | Commisioner | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-HI | Program / Project Risk Analyst | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-HI | Senior Program Manager | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-HI | Munitions and Explosives of Concern (MEC) Quality Assurance | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-HI | Crane / Weight Handling Inspector | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-HI | Elevator Inspector | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-HI | Construction Safety Oversight - Certified Safety Professional (CSP) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-HI | Construction Safety Oversight - Safety Trained Supervisor (STS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-HI | C4IT Infrastructure Quality Assurance Technician Contractor Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-FE | Construction Manager Contractor Support (CMCS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-FE | Engineering Technician Contractor Support (ETCS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-FE | Scheduler Contractor Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-FE | Design Technical Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-FE | Program Coordinator | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-FE | Commisioner | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-FE | Program / Project Risk Analyst | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-FE | Senior Program Manager | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-FE | Munitions and Explosives of Concern (MEC) Quality Assurance | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-FE | Crane / Weight Handling Inspector | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-FE | Elevator Inspector | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-FE | Construction Safety Oversight - Certified Safety Professional (CSP) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-FE | Construction Safety Oversight - Safety Trained Supervisor (STS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-FE | C4IT Infrastructure Quality Assurance Technician Contractor Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-NW | Construction Manager Contractor Support (CMCS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-NW | Engineering Technician Contractor Support (ETCS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-NW | Scheduler Contractor Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-NW | Design Technical Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-NW | Program Coordinator | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-NW | Commisioner | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-NW | Program / Project Risk Analyst | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-NW | Senior Program Manager | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-NW | Munitions and Explosives of Concern (MEC) Quality Assurance | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-NW | Crane / Weight Handling Inspector | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-NW | Elevator Inspector | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-NW | Construction Safety Oversight - Certified Safety Professional (CSP) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-NW | Construction Safety Oversight - Safety Trained Supervisor (STS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-NW | C4IT Infrastructure Quality Assurance Technician Contractor Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-SW | Construction Manager Contractor Support (CMCS) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-SW | Engineering Technician Contractor Support (ETCS) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-SW | Scheduler Contractor Support | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-SW | Design Technical Support | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-SW | Program Coordinator | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-SW | Commisioner | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-SW | Program / Project Risk Analyst | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-SW | Senior Program Manager | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-SW | Munitions and Explosives of Concern (MEC) Quality Assurance | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-SW | Crane / Weight Handling Inspector | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-SW | Elevator Inspector | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-SW | Construction Safety Oversight - Certified Safety Professional (CSP) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-SW | Construction Safety Oversight - Safety Trained Supervisor (STS) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-SW | C4IT Infrastructure Quality Assurance Technician Contractor Support | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-GU | Construction Manager Contractor Support (CMCS) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-GU | Engineering Technician Contractor Support (ETCS) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-GU | Scheduler Contractor Support | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-GU | Design Technical Support | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-GU | Program Coordinator | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-GU | Commisioner | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-GU | Program / Project Risk Analyst | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-GU | Senior Program Manager | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-GU | Munitions and Explosives of Concern (MEC) Quality Assurance | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-GU | Crane / Weight Handling Inspector | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-GU | Elevator Inspector | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-GU | Construction Safety Oversight - Certified Safety Professional (CSP) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-GU | Construction Safety Oversight - Safety Trained Supervisor (STS) | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-GU | C4IT Infrastructure Quality Assurance Technician Contractor Support | Guam/CNMI | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-AUS | Construction Manager Contractor Support (CMCS) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-AUS | Engineering Technician Contractor Support (ETCS) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-AUS | Scheduler Contractor Support | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-AUS | Design Technical Support | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-AUS | Program Coordinator | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-AUS | Commisioner | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-AUS | Program / Project Risk Analyst | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-AUS | Senior Program Manager | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-AUS | Munitions and Explosives of Concern (MEC) Quality Assurance | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-AUS | Crane / Weight Handling Inspector | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-AUS | Elevator Inspector | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-AUS | Construction Safety Oversight - Certified Safety Professional (CSP) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-AUS | Construction Safety Oversight - Safety Trained Supervisor (STS) | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-AUS | C4IT Infrastructure Quality Assurance Technician Contractor Support | Australia | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Note 1 - Attachment JB-1 Price Summary Worksheet illustrates a required format. Offerors shall not deviate from the basic format of the forms identified in this solicitation. The Price Proposal shall include the |
| completed mandatory forms and supporting information in the general format outlined. |
| Note 2 - Hourly rate shall include fringe benefits, as applicable (i.e., statutory (FICA, FUTA, SUTA), Insurances, other benefits paid by the employer). |
| Note 3 - At a minimum, Offerors shall propose ODC at the Contract level in accordance with PWS Section 2.16 Contractor Furnished Resources |
| (1) Personal Protective Equipment (PPE), equipment, office supplies; |
| (2) Communication equipment & accessories/services - laptop, software, cell phone & service, internet connection. |
| * Any ODCs that are dependent on the scope of work, if required, shall be proposed at the individual Task Order level and negotiated separately. |
| Note 4 - Markup % shall include indirect costs (i.e. Overhead, General & Administrative, etc.), and Profit. Provide a detailed supporting wirtten narrative to clearly identify the types of costs included. The Mark-Up |
| percentage will be applied to Total Direct Costs (i.e. Labor & Fringe Benefits, ODCs (if applicable)) and will remain in effect for the life of the contract. Round all Mark-Up percentages to the nearest two decimal |
| places. The Mark-Up percentage shall include location specific taxes (i.e., Hawaii GET, Guam BPT, etc.). |
N62742-22-R-3611
Page &P of &N &A
JB-1_Opt 3
| ATTACHMENT JB-1 - PRICE SUMMARY WORKSHEET (Note 1) | |
| OPTION PERIOD 3 | |
| 12 MONTHS |
| D | ITEM | GOVERNMENT LABOR CATEGORY | LOCATION | CONTRACTOR EQUIVALENT LABOR CATEGORY | TOTAL LABOR & FRINGE BENEFITS | ||||
| (Note 2) | OTHER DIRECT COST (ODC) | ||||||||
| (Note 3) | TOTAL DIRECT COST | MARKUP % | |||||||
| (Note 4) | TOTAL | ||||||||
| 1-HI | Construction Manager Contractor Support (CMCS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-HI | Engineering Technician Contractor Support (ETCS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-HI | Scheduler Contractor Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-HI | Design Technical Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-HI | Program Coordinator | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-HI | Commisioner | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-HI | Program / Project Risk Analyst | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-HI | Senior Program Manager | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-HI | Munitions and Explosives of Concern (MEC) Quality Assurance | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-HI | Crane / Weight Handling Inspector | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-HI | Elevator Inspector | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-HI | Construction Safety Oversight - Certified Safety Professional (CSP) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-HI | Construction Safety Oversight - Safety Trained Supervisor (STS) | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-HI | C4IT Infrastructure Quality Assurance Technician Contractor Support | Hawaii | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-FE | Construction Manager Contractor Support (CMCS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-FE | Engineering Technician Contractor Support (ETCS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-FE | Scheduler Contractor Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-FE | Design Technical Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-FE | Program Coordinator | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-FE | Commisioner | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-FE | Program / Project Risk Analyst | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-FE | Senior Program Manager | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-FE | Munitions and Explosives of Concern (MEC) Quality Assurance | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-FE | Crane / Weight Handling Inspector | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-FE | Elevator Inspector | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-FE | Construction Safety Oversight - Certified Safety Professional (CSP) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-FE | Construction Safety Oversight - Safety Trained Supervisor (STS) | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-FE | C4IT Infrastructure Quality Assurance Technician Contractor Support | Far East | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-NW | Construction Manager Contractor Support (CMCS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-NW | Engineering Technician Contractor Support (ETCS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-NW | Scheduler Contractor Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-NW | Design Technical Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-NW | Program Coordinator | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-NW | Commisioner | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-NW | Program / Project Risk Analyst | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-NW | Senior Program Manager | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-NW | Munitions and Explosives of Concern (MEC) Quality Assurance | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-NW | Crane / Weight Handling Inspector | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-NW | Elevator Inspector | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-NW | Construction Safety Oversight - Certified Safety Professional (CSP) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 13-NW | Construction Safety Oversight - Safety Trained Supervisor (STS) | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 14-NW | C4IT Infrastructure Quality Assurance Technician Contractor Support | Northwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 1-SW | Construction Manager Contractor Support (CMCS) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2-SW | Engineering Technician Contractor Support (ETCS) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3-SW | Scheduler Contractor Support | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4-SW | Design Technical Support | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5-SW | Program Coordinator | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6-SW | Commisioner | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7-SW | Program / Project Risk Analyst | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8-SW | Senior Program Manager | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9-SW | Munitions and Explosives of Concern (MEC) Quality Assurance | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10-SW | Crane / Weight Handling Inspector | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 11-SW | Elevator Inspector | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 12-SW | Construction Safety Oversight - Certified Safety Professional (CSP) | Southwest | FILL-IN | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .