This is an amendment to a solicitation for an indefinite delivery/indefinite quantity construction contract to provide heating, ventilation and air conditioning services at Homestead Air Reserve Base in Florida. The contract is a single-award to one contractor and involves construction and repair of HVAC systems including direct digital controls and energy management systems. Response is due by a date not provided in the excerpt. The Department of the Air Force Reserve Command is the contracting agency. Pricing will be firm-fixed price for task orders issued against the basic contract for HVAC work over the five-year period of performance.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) ID/IQ SOLICITATION

BASIC CONTRACT STATEMENT OF WORK (SOW)

STATEMENT OF WORK

FOR

HEATING, VENTILATION, AND AIR CONDITIONING

(HVAC) SUPPORT

INDEFINITE DELIVERY/INDEFINITE QUANTITY (ID/IQ)

BASIC CONTRACT

AT

AIR FORCE RESERVE COMMAND

HOMESTEAD AIR RESERVE BASE (HARB),

FLORIDA

27 July 2023

FA6648-23-R-0006

TABLE OF CONTENTS

1.0 SCOPE OF WORK 3

2.0 PROJECT REQUIREMENTS 3

3.0 CONTRACTOR PERSONNEL 4

4.0 OFFICE SITE 7

5.0 PERFORMANCE TIMES 8

6.0 SUBMITTALS 8

7.0 STANDARD PRODUCTS 9

8.0 BASE REQUIREMENTS 10

9.0 INSURANCE LIABILITY/BONDING REQUIREMENTS 19

10.0 GOVERNMENT FURNISHED ITEMS 19

11.0 CONTRACTOR FURNISHED ITEMS AND SERVICES 20

12.0 CONDITIONS OF WORK 20

13.0 CONSTRUCTION SITE MAINTENANCE 21

14.0 INSPECTIONS, QUALITY CONTROL, WORKMANSHIP, AND TESTING 22

15.0 WARRANTY 23

16.0 ORDERING PROCEDURES 23

17.0 TASK ORDER PRICING 25

18.0 COMMENCEMENT, PROSECUTION, COMPLETION, AND PAYMENT FOR WORK 26

ATTACHMENT 1 - QUALITY CONTROL PLAN 29

1.0 SCOPE OF WORK:

1.1 Heating, Ventilation, and Air Conditioning (HVAC) Support Contract is an indefinite delivery/indefinite quantity (ID/IQ) contract for construction and service work supporting HVAC systems at Homestead Air Reserve Base (HARB), Florida in support of the 482nd MSG/CEC Mission. The Contractor shall provide all labor, materials, equipment, and supervision required to perform repair, maintenance, and replacement of HVAC systems including standalone Direct Digital Control (DDC) and Energy Management & Control Systems (EMCS). The Contractor shall meet all applicable Federal, State, and local codes, Air Force Instruction (AFI) requirements, Uniform Facility Criteria (UFC) and the HARB Base Specifications.

1.2 Task Orders (TOs) will be issued against the basic contract and will be executed in accordance with (IAW) the basic contract terms, conditions, and this Statement of Work (SOW), and each individual TO’s SOW.

1.3 The following intent is provided within this document to assist the Contractor with understanding the purpose of this SOW. The below section is not intended to provide a minimum or maximum amount of work required. Specific scopes of work will be provided in individual TOs. The Contractor’s proposed materials, means, and methods can and are encouraged to exceed the minimum requirements but are subject to Government review and approval.

1.4 The contractor shall comply with HVAC Chiller Replacement Standardization requirements.

The United States Air Force (USAF) has a brand name requirement to procure Heating, Ventilation, & Air Conditioning (HVAC) chillers from a limited selection of manufacturers (see HVAC Chiller Justification & Approval – Signed) to support new chiller purchases. In accordance with (IAW) the requirements of the J&A chillers for Homestead ARB must be from the manufacturer of CARRIER for purchases through 30 September 2024.

2.0 PROJECT REQUIREMENTS:

2.1 Location and Site Plan: The work under this contract will occur on various real property facilities on Homestead Air Reserve Base in Homestead, FL. The location and site plan for each project will be provided with each TO.

2.2 Requirements: Construction shall include HVAC, to include EMCS, construction, and services necessary for a complete project. When required, the Contractor shall provide site specific training structured to address technically advanced systems as needed and identified in individual TOs.

2.3 Standards, Codes, and Regulations: The Contractor shall be responsible for all design and layout required to properly fabricate and fit the various systems required and described herein. The most stringent code, standard, or regulation shall apply in all cases. Deviations from the code, standard, or regulation can only be approved by the Contracting Officer (CO) in writing. The Contractor shall ensure that all work and all installations are accomplished by following the MOST RECENT:

2.3.1 National Electrical Code, NFPA No. 70

2.3.2 National Electric Safety Code (ANSI C2)

2.3.3 National Fire Protection Association (NFPA) Codes

2.3.4 Life Safety Code (NFPA 101)

2.3.5 International Code Council (ICC)

2.3.6 Uniform Federal Accessibility Standard (UFAS)

2.3.7 Florida Building Mechanical Code

2.3.8 Occupational Safety and Health Administration (OSHA); and

2.3.9 All Federal, State, and local codes and regulations, as applicable.

2.3.10 Uniform Facility Criteria (UFC)

2.3.11 Unified Facilities Guide Specifications (UFGS)

2.3.12 National Fire Alarm Code, NFPA No. 72

2.3.13 ACI codes and specifications – concrete construction

3.0 CONTRACTOR PERSONNEL:

3.1 The Contractor shall perform adequate background checks on all employees to validate U.S.

citizenship and to validate that employees are legally allowed to work in the U.S. Employees shall not have prior felonies or outstanding warrants of any kind. Naturalized citizens are required to bring their naturalization certificate to be eligible to apply for a base access pass.

3.2 The Contractor shall ensure that all employees and subcontractor employees have current, valid licenses and certifications necessary to perform their functions. Any cost or time associated with obtaining licenses or certifications shall be at the Contractor’s expense.

3.2.1 All work shall be performed in a professional manner by journeyman craftsmen certified in the trade in which they are employed.

3.2.2 The Contractor shall ensure that all employees are trained and qualified to operate specialized equipment such as a scissor lift, “hi-lo”, welder, or any other specialized equipment as required by industry standards. The Contractor shall provide proof of qualifications and/or certifications to the CO when requested.

3.2.3 The Contractor shall immediately replace any individual not in compliance with the terms and conditions as set forth within this section.

3.2.4 The Contractor shall not employ any person who is currently or formerly an employee of the U.S. Government, if the employment of that person would create a conflict of interest.

3.3 Key Personnel: In support of the construction functions outlined in the SOW, the contractor shall, at a minimum, provide the following key personnel: Project Manager and Superintendent. The contractor shall ensure the key personnel listed have adequate qualifications, certifications, and experience to complete the requirements in the SOW.

Specific requirements for the Project Manager and Superintendent are outlined below. The Government reserves the right to request qualification verification of any key personnel at any time to ensure the following minimum qualifications are being met.

3.0.1 Contract/Project Manager. The Contractor’s Contract/Project Manager (CM/PM) shall be responsible for the overall performance of this contract and shall possess the necessary experience to provide direct oversight of all project design and planning activities. The CM/PM shall have full authority to act for the Contractor. The CM/PM shall provide overall contract management, including full authority to develop TO proposals, negotiate and sign TOs, and provide subcontract purchasing and administration. The CM/PM and alternates, who shall act for the Contractor when the CM/PM is absent, shall be designated prior to commencement of work in writing to the CO. Subcontractors may not perform duties of the CM/PM. The CM/PM shall be able to speak, understand, and read the English language. The CO must be able to contact this individual at all times by phone or e-mail to discuss any project. This individual shall have at least ten (10) years of construction experience with at least five (5) years of experience working on a federal installation in construction, including experience in personnel resource allocation and/or contract management.

3.0.2 Superintendent. The Contractor’s Superintendent shall provide on-site supervision and visit each active project site daily; submit periodic detailed progress reports (on AF Form 3065 or equivalent) for each TO; review material submittals; schedule and coordinate subcontractor and material suppliers, site visits, and inspections; and attend all status meetings, site visits, and pre-final/final inspections as required.

Subcontractors may not perform duties of the Superintendent. The Superintendent shall be on-site during normal work hours and for contingencies requiring work beyond normal work hours. The Superintendent shall be able to speak, understand, and read the English language. The Superintendent shall ensure that a complete, current set of the contract documents and approved submittals are on the jobsite at all times. This individual shall have at least ten (10) years of construction experience with at least five (5) years of experience working construction on a federal installation. Each active project must have a Superintendent on site.

3.0.3 Throughout the life of this contract, whenever there are active TOs, the Superintendent shall be available to meet within 120 minutes of notification by the CO or Government Program Manager (GPM) regarding any active project, and the CO must be able to contact this individual at all times by phone or e-mail. If there are multiple projects taking place at once, the Superintendent shall be present at the project that is most complex and/or has highest visibility as determined by the GPM.

3.4 The Contractor shall provide and maintain the following capabilities, at a local or remote office, to support this contract:

3.4.1 Cost Estimating/Negotiating. The Contractor shall provide estimating/negotiating support capable of producing accurate quantity reductions and cost proposals, within the time constraints specified.

3.4.2 Copying and Reproduction Capabilities. The Contractor shall be able to copy or reproduce all necessary drawings and contract documents required to support TOs.

3.5 Subcontractors.

3.5.1 All subcontractors shall be licensed in the State of Florida in their specialty where required.

3.5.2 The Contractor shall coordinate the work of subcontractors and shall ensure coordination of work between various trades. The Contractor is responsible for any subcontractor work performed. The Contractor shall study, examine, and evaluate the contract drawings to establish the work, coordination, or materials required and necessary to provide a product complete in the usual and customary manner, and shall provide for all such requirements as though expressly detailed herein or on the drawings.

3.6 Labor Requirements. The Contractor shall abide by the labor requirements/statutes required IAW Federal Acquisition Regulation (FAR) 22.403. Construction Wage Rate Requirement Statute wage determinations to cover Dade County apply during performance of the contract. The appropriate wage determination will be attached at the issuance of TO solicitations.

3.7 Security Requirements

3.7.1 All Contractor employees will be subject to a criminal history background check IAW Air Force Manual (AFMAN) 31-113, Installation Perimeter Access Control, (the AFMAN is a limited access document but more details on the requirements/process in terms of background checks can be provided by the Requiring Office upon request). Vehicle registration, proof of insurance, and a valid driver's license must be presented for vehicles. Installation Commanders may deny access and credentials based on information obtained during identity vetting that indicates the individual may present a threat to the good order, discipline, and morale of the installation.

3.7.2 Base Access. For Contractor personnel who wish to obtain Base access, IAW Air Force Federal Acquisition Regulation Supplement (AFFARS) Clause 5352.242-9000, Contractor Access to Air Force Installations, the Prime Contractor shall submit a written request on company letterhead to the CO with the following information: 1) contract number, 2) location of work site, 3) start & stop dates (must be on or before contract/ task orders’ expiration date and no more than 365 days at a time), and 4) names of employees/ subcontractor employees needing access to the base, to include each employee’s company name. You will also need to submit the completed “Background Investigation Request” form provided after contract award.

3.7.3 The process starts with the Prime Contractor’s request through the CO who will then endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. The employee must be pre-announced at least 72 hours prior to arrival. The individual must bring a valid vehicle registration and insurance and proof of ID (see more below on identity proofing documents).

3.7.4 The contractor is not authorized to escort any of his employees on Base. All Contractor’s employees long or short term shall have a badge to access the Base.

3.7.5 Base passes will be limited to the length of the contract task order from the date the request is submitted to the Contracting Officer for signature.

3.7.6 Restricted Area and Special Access Programs. The number of restricted area badges will be limited as determined by the Civil Engineering Security Manager

3.7.7 The contractor shall comply with all base security regulations. Additionally, the contractor shall comply with actions dictated by force protection condition changes/measures. For real-world situations/exercises, changes to force protection conditions could impact contractor performance of work and can include denial of access to the installation to perform work.

3.7.8 Only employees who will be working on the contract consistently/frequently should be submitted for a long-term Base pass.

3.7.9 The Contractor shall comply with all security requirements imposed by the Installation. Specific security considerations will be handled on an individual Task Order basis as required.

3.7.10 The contractor shall report suspicious activity to Security Forces at 786-415-7777 in a timely manner.

3.7.11 The Contractor and its employees shall comply with all base traffic regulations.

3.7.12 The Contractor must ensure employees/subcontractor employees hold identification compliant with the REAL ID Act of 2005. All others must provide another form of identification as an identity proving document. Please visit the Department of Homeland Security’s (DHS) website to get the latest information, https://www.dhs.gov/current-status-states-territories.

3.7.13 During performance of the contract, the Contractor shall be responsible for obtaining required identification for newly assigned personnel.

3.7.14 The Contractor shall be responsible for prompt return of credentials and vehicle passes for: 1) any employee who no longer requires access to the work site; 2) upon request by a CO; and 3) upon completion or termination of the contract. The Prime Contractor shall ensure that all Base identification passes issued to employees and subcontractor employees are returned to the issuing office. Failure to comply with these requirements may result in withholding of payment.

3.7.15 The Contractor shall be responsible for safeguarding all government property, equipment and materials provided for Contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.

3.7.16 Contractor employees are prohibited from possessing weapons, firearms or ammunition, on themselves or within Contractor-owned or privately owned vehicle while on HARB.

4.0 OFFICE SITE:

4.1 When an individual Task Order requires the use of a Field Office or Material Storage Trailer, the Contractors Manager field office and storage trailers shall be in good condition, the exterior shall be clean, and in good repair without broken windows, excessive signage, or graffiti, and the paint shall be free from peeling or fading. The Contractor shall be responsible for arranging all costs associated with connecting to Base utilities for electricity, water, and sewage service. All Base-level utility conversation practices or requirements shall be adhered to IAW Air Force Instruction (AFI) 90-1701, Energy Management. Costs incurred in connection with the facility shall be paid by the Contractor.

4.1.1 The Contractor shall be responsible for housekeeping of the entire designated lot, and no custodial support will be provided by the Government.

4.1.2 The Contractor shall comply with all recycling programs IAW AFI 32-7042, Waste Management. The Contractor shall provide recycling containers to collect white paper and cardboard.

4.1.3 The Contractor shall comply with all pest management programs IAW AFI 32-1053, Integrated Pest Management Program.

4.2 The Contractor shall coordinate the proposed layout of the work with the Civil Engineering Construction Inspector (CECI) and submit site plans, field office requirements and proposed storage areas in accordance with the project requirements associated with each Task Order. Note: For planning purposes, the contractor shall include a line item in the schedule of values and progress schedule of each task order for completion of punch-list items, site clean-up and demobilization. The amount of this line item shall be equal to 10% of each CLIN or $100,000, whichever is less. The Government will not pay final invoices for this amount until all punch-list, site clean-up with documented Government Acceptance of site condition, and demobilization activities are complete and final acceptance has been made.

4.3 The office trailer shall comply with all applicable codes, regulations, and Base standards.

The location, type, proposed maintenance, and other considerations shall be approved by the GPM prior to moving onto the site. The Contractor shall use current Air Force guidelines (specifically AFI 32-1021, Planning and Programming Military Construction (MILCON) Projects, and AFI 32-9003, Granting Temporary Use of Air Force Real Property) to ensure initial utilization and any changes are within the scope of utilization, mission, and personnel.

4.4 The requirement for a lay-down area (staging areas) associated with a Task Order shall be dependent upon the size of the project and in accordance with specific criteria as detailed in the Task Order. Prior to starting the work, the Contractor shall review written authorization of staging area and/or site boundary from the Contracting Officer or Contracting Officer’s Representative. Alternation of staging areas or site boundaries must be approved by the Government in advance of change. A supplemental storage area will be identified as required by the detailed Task Order. All staging areas determined necessary by the detailed task order shall be completely screened with eight-foot-high chain-link construction fencing and include visual screening and tan mesh. All Contractor trailers, stored materials, and idle equipment shall be located in the designated staging area associated with each task order.

The staging area shall be kept clean and orderly. Tarps are to be used, as necessary, to secure loos materials. Dumpsters must be sited as approved by the Contracting Officer’s Representative. Any movement of a dumpster to another area on the project site must be approved by the Government. All projects that include excavation must be issued a Work Clearance Request (AF Form 103).

4.5 The Government will only provide fire prevention and protection services. The Fire Department telephone extension is 911 for emergencies when calling from a Base telephone and (786) 415-7117 when calling from a cell phone.

4.6 The site office shall be manned as necessary as stated in Section 17.0 and shall have the Site Superintendent and/or CM on-site whenever there are active TOs.

4.7 Before final payment is paid on the last TO, the Contractor shall contact the COR to schedule a move out inspection prior to leaving the site. Under no circumstances shall any trailers, portable buildings, Conex type facilities, any other structures, supplies, etc. be left on-site once the contract has been completed. In addition, no waste or excess materials of any kind, non-hazardous or hazardous, shall be left on-site. The site will be reverted back to its original condition prior to its current use. Before departure, the Contractor shall contact the CO, GPM, and COR for the final move out inspection before leaving the Base. Any deficiencies noted shall be corrected by the departing Contractor before vacating the space.

Any uncorrected deficiencies could delay final payment on the final TOs.

5.0 PERFORMANCE TIMES:

5.1 The Government’s preferred total period of performance (PoP) will depend on the individual TO and will be specified in the task order RFP. The Contractor may propose a shorter or longer PoP in their proposal. Should the Contractor propose a longer PoP, the proposal must include justification for the longer PoP. The final PoP duration will be discussed during negotiations with the Contracting Office. The Contractor shall proceed with the project as stated in the TO’s SOW after the Notice to Proceed (NTP) is provided by the Government.

The Contractor shall not postpone or interrupt their work performance unless official notice to that effect is provided to them by the CO.

5.1.1 The Contractor shall be able to handle anywhere from two (2) to five (5) projects concurrently.

5.1.2 Performance periods shall not be extended due to insufficient resources.

5.2 TO projects shall start no later than 10 calendar days following issuance of the NTP.

Work shall not be permitted to commence until submittals specified at the TO level have been reviewed by the Government and clearance issued to start work via the NTP issued by the Contracting Office.

5.3 The first 30 calendar days following basic contract award shall be designated as a start-up period, after which the Contractor shall have all equipment and personnel in place to fully execute the requirements of this contract. The Government will conduct an indoctrination (Pre-Construction Conference) with the Contractor/s to cover ordering procedures, security requirements, environmental requirements, etc. following award of the basic contract/s.

5.4 PERFORMANCE OF SERVICE DURING CRISIS OR HEIGHTENED SECURITY: HVAC

work performed under this IDIQ may be considered mission essential. However, only limited service will continue in the event of a crisis. Contractor employees, with approved background checks, will be allowed unescorted access to the installation for performance of work in all FPCONs except “Delta”. The Contracting Officer or Contracting Officer’s Representative (COR) will notify the contractor of a “Delta” condition as soon as possible after security procedures have been implemented. If FPCON Delta lasts for an extended duration, some facilities may require service. These facilities will be approved on a case-by case basis. The Contracting Officer or Contracting Officer’s Representative (COR) will inform the contractor which facilities are affected.

6.0 SUBMITTALS:

6.1 The AF Form 66, Schedule of Material Submittals, will be issued with each TO’s RFP and will be incorporated as an attachment to each TO. The AF Form 66 will include all desired material submittals, such as material/shop drawings, material data sheets, warranty information, operation manuals, and construction drawings, along with respective due dates for a specific TO. If a copy of the AF Form 66 is not provided with the awarded TO, the Contractor shall request a copy from the Contracting Office. **Please Note: AF Form 66 should not apply to a small contract such as replacing an AC unit. In this case the submittal required by the Contractor is requested in the SOW.**

6.1.1 Once an individual TO is awarded, the Contractor shall submit all required material/shop drawing submittals and project construction schedule (if required) to the CO within 10 calendar days for approval. No materials shall be used prior to approval.

6.1.2 All material submittals indicated on the AF Form 66 or in the SOW shall be attached to an AF Form 3000, Material Approval Submittal, with the TO project title, project number, and TO number clearly indicated. One copy of each submittal shall be submitted via e-mail to the Buyer and CO for approval; one copy will be returned to the Contractor and shall be posted by the Contractor at the jobsite. The Contractor may submit a catalog of standard material data sheets for selected items that are used repetitively for projects – the catalog number for these items can be referenced on the Material Approval Submittal (AF IMT 3000) without attaching copies of the data sheets. Submittals shall be legible and shall include all technical data needed to verify that the item meets the requirement.

6.2 Payrolls. IAW FAR Clause 52.222-8, Payrolls and Basic Records, the Contractor shall submit to the Contracting Office copies of payrolls applicable to each TO for each week in which any contract work is performed as well as weekly payroll statements of compliance for the Contractor and each Subcontractor. The Contractor may use the U.S. Department of Labor form WH-347, Payroll, or a similar form that provides the same data and identical representation. The WH-347 form can be found at http://www.dol.gov/whd/forms/wh347.pdf.

If the WH-347 form is used, a DD Form 879, Statement of Compliance, does not need to be provided; the DD Form 879 is only required if the WH-347 form is not used. The Prime Contractor is responsible for making sure the submittals are correct before submitting them to the Contracting Office. Failure to submit payrolls may cause delays in payment. The final payroll must be marked “FINAL”. This information and a sample of the DD Form 879 will be included in each TO’s Pre-Construction Letter, issued with the NTP.

7.0 STANDARD PRODUCTS:

7.1 Materials and equipment shall be standard products of a manufacturer regularly engaged in the manufacture of such products, which are of a similar material, design, and workmanship.

The Contractor shall furnish a Safety Data Sheet (SDS), formerly known as a Material Safety Data Sheet (MSDS), OSHA Form 20 or accepted equivalent, for each hazardous or potentially hazardous material or chemical utilized by the Contractor. This includes solvents and treated materials, such as preservative-treated wood (SDS for the preservative) or fungicide-treated rubber goods (SDS for fungicide). The CO and GPM must approve all materials prior to installation.

7.1.1 Green Procurement. The Green Procurement Program (GPP) is a mandatory federal acquisition program that focuses on the purchase and use of environmentally preferable products and services. Many different items are covered by the GPP.

Recycled-content products are designated by the Environmental Protection Agency (EPA). “Bio-based” products made from renewable plant materials are designated by the United States Department of Agriculture (USDA). Energy and water efficient products are designated by the Department of Energy (DOE). GPP also requires the Government to avoid purchasing Ozone Depleting Substances (ODS) and EPA-designated Priority Chemicals. Environmentally preferable purchasing (EPP) is a voluntary program, and it encourages the purchase of goods and services that have decreased effects on human health and the environment (compared to the competing goods and services that serve the same purpose) but are not already required by one of the mandatory GPP elements.

7.1.1.1 Green Procurement is mandated except when the Contractor can show that the product with recycled content does not meet intended specifications, has excessive cost, or cannot be delivered in time to support the schedule of the contract. If the Contractor is unable to locate a specified product meeting the GPP requirement, identify the issue to the CO or GPM for guidance. GPP is based on legal requirements and the Department of Defense facilities are subject to enforcement action if these requirements are ignored.

7.1.1.2 The Contractor shall make maximum use of products containing recovered materials that are EPA-designated items IAW FAR Clause 52.223-17, Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts. The list of EPA-designated items is available at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program.

7.2 Technical instructions pertaining to the use or installation of products, materials, or equipment used or installed in the execution of work under this contract are furnished in response to a requirement stipulated herein and form a part of these specifications as though specifically set forth herein. In the event of conflict between the specifications or drawings and technical instructions, the Contractor shall bring such conflict to the attention of the CO for resolution before proceeding with the work involved.

7.3 Non-Restrictive Specifications. References in the design specifications of this SOW and each TO’s SOW to equipment, material, articles, or patented processes by trade name, make, or catalog number shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the CO, is equal or exceeds the requirement of these specifications, unless otherwise specifically provided in this SOW or individual TO SOW.

7.4 Prohibited Materials. The Contractor shall certify that products do not contain mercury, hexavalent chromium, toluene, chlorinated solvents, hydrolysable chlorine derivatives, ethylene-based glycol ethers and their acetates, nor any carcinogen. When tested, the lead content shall not exceed 0.06% by weight of the dry film and the test for chromium content shall be negative. Additionally, devices at the work site such as cameras, computers, weapons, video and audio cassette players, recorders, binoculars, smartphones, film, and other related media are prohibited unless approved by the Contracting Officer.

8.0 BASE REQUIREMENTS:

8.1 Disposal of Waste/Excess Material. Any waste or excess material resulting from any contract requirement shall be removed and disposed of at a proper disposal site off HARB by the Contractor in strict accordance with applicable Federal, state, county, and local laws.

Disposal, discharge, deposit, dumping, spilling, leaking, or placing of any material, wastes, effluents, trash, garbage, oil, grease, paint, chemicals, etc., in areas other than proper disposal sites off H A R B shall be subject to the approval of the CO. If any waste material is dumped in unauthorized areas, the Contractor shall remove the material and restore the area to the condition of the adjacent undisturbed area. Contaminated ground shall be excavated, disposed of as directed by the CO and in coordination with the Base Environmental

Management Office, replaced with suitable fill material, compacted, and finished to match adjoining surfaces.

8.2 Trash and Litter Control. The Contractor shall develop a strict trash and litter control program. The litter control program shall consist of supplying an adequate number of covered trash and litter receptacles in all appropriate locations. The Contractor shall take precautions to prevent Foreign Object Debris (FOD) while working on or around the flight line.

The Contractor shall dispose of all trash IAW para. 8.1.

8.3 Landfill. The Contractor shall furnish the following information to the CO prior to work commencing on the first task order issued against this contract: 1) Name and address of the proposed landfill to be used for disposal of project related waste; 2) landfill class; and 3) proposed materials to be disposed of at this location.

8.3.1 This information is to be submitted for all materials to be disposed of by the Contractor, including hazardous waste as well as demolition debris, and shall be submitted and approved before construction work begins on the first task order.

Copies of manifests and inventories of hazardous wastes that were disposed of during the course of the contract must be provided to 482 MSG/CEC at the conclusion of the contract. The close-out submittal must contain all information required by the initial submittal.

8.4 Hazardous Materials.

8.4.1 Materials classified as hazardous by U.S. and Florida environmental rules, regulations, or laws shall be handled for disposal IAW those rules, regulations, or laws. Any cost provisions to meet these requirements shall be the sole responsibility of the Contractor. Any project delay to meet these requirements shall also be the sole responsibility of the Contractor.

8.4.2 IAW FAR Clause 52.223-3, Hazardous Material Identification and Material Safety Data, the Contractor shall list any hazardous material to be delivered under this contract. For each item, the Contractor shall submit to the CO an SDS listing any hazardous material to be delivered under this contract prior to the hazardous material entering the installation. The Contractor may submit a master list of all hazardous material at the beginning of the contract’s performance but must update the list throughout the life of the contract when needed if a new item needs to be added.

The initial and any revised lists must be submitted to and approved by the CO prior to the material entering the installation.

8.4.3 All hazardous material shall be stored in a safe and environmentally responsible manner within construction sites and laydown yards.

8.4.4 Disposal of Hazardous Material. The Contractor shall comply with all Federal, state, and local laws pertaining to the protection of the environment and emission of hazardous pollutants in the performance of this contract. The Contractor shall also provide a copy to the CO and the Base Environmental Management Office of all correspondence with local, state, or Federal pollution control authorities. Any hazardous waste generated by the Contractor shall be the Contractor's responsibility to dispose of, IAW the above-mentioned laws, to include hauling all paint determined as hazardous waste to the nearest hazardous waste dump.

8.4.5 Spillage. Special measures shall be taken to prevent paints, chemicals, fuels, oils, grease, etc., from being spilled and particularly from entering surface or groundwater.

In the event of a paint, fuel, oils, or chemical spill, the Contractor shall immediately take containment measures to prevent the spill from migrating and/or entering the Base drainage system. Hazardous spill residue shall be disposed of IAW all local, state, and federal laws pertaining to the protection of the environmental and emission of hazardous pollutants in the performance of this contract. Non-hazardous spillage shall be disposed of off-Base IAW para. 8.2. All spills shall be reported as soon as possible to the Base Environmental Office and Base Safety Office at 415-7601 and 415-7333 respectively.

8.5 Environmental Pollution Prevention.

8.5.1 IAW FAR Clause 52.223-19, Compliance with Environmental Management Systems (EMS), the Contractor’s work under this contract shall conform with all operational controls identified in the applicable agency EMS and the Contractor shall provide monitoring/measurement information for the Government when requested. The 412th Test Wing maintains a conforming EMS. The services provided by this agreement fall within the scope of the EMS. Control of environmental pollution requires consideration of air, water, and land uses, and involves the management of noise, solid waste, thermal energy, and radioactive materials, as well as other pollutants. Environmental protection shall be provided during the life of the contract.

The Contractor shall ensure compliance with FAR Clause 52.223-5, Pollution Prevention and Right-to-Know Information, and this contract shall conform with all operational controls identified in the applicable facility EMS and shall provide monitoring and measurement information necessary for the Government to address environmental performance relative to the goals of the EMS. Protective measures shall be incorporated to control pollution and/or correct environmentally impacting conditions that may develop resulting from this contract. Guidance is available from the 482nd BCE/CEC, (786) 415-7601.

8.5.2 Applicable Regulations. In order to prevent and to provide for abatement and control of any environmental pollution arising from the construction activities of the Contractor and any subcontractor employed by the Contractor in the performance of this contract, the Contractor shall comply with the applicable federal, state, and local laws and regulations concerning environmental, pollution control, and abatement in effect on the date of the solicitation. The Contractor shall also demonstrate leadership in preventing, controlling, and abating environmental pollution by supporting regional pollution abatement programs and by accelerating corrective measures to meet established standards and criteria.

8.5.3 Environmental Minimization Measures (Checklist). The Contractor shall comply with the most current Environmental Minimization Measures Checklist pertaining to each TO as stipulated in each TO’s SOW. During the course of construction, the Contractor shall have a quality control and oversight procedure to ensure the requirements of the environmental checklist are met and documented.

8.5.4 Health and Safety on Government Installations. In performing work under this contract on a Government installation, the Contractor shall take all reasonable steps and precautions to prevent accidents and preserve the health and safety of Contractor and Government personnel performing or in any way coming in contact with the performance of this contract and take such additional immediate precautions as the CO may reasonably require for health and safety purposes. The CO may, by written order, direct Air Force Safety and Health Manual and/or health standards as may be required in the performance of this contract and any adjustments resulting from such direction will be IAW the Changes Clause of this contract. Any violation of these health and safety rules and requirements, unless promptly corrected as directed by the CO, shall be grounds for termination of this contract in IAW the Default Clause of this contract.

8.5.5 The Contractor shall provide unit(s) designed for and charged with a refrigerant approved under EPA's Significant new Alternatives Policy (SNAP) listed on web site https://www.epa.gov/snap/substitutes-refrigeration-and-air-conditioning.

8.5.6 SOIL RE-USE POLICY: Contractor shall ensure that DERM is notified, and approval is obtained prior to any soil re-use outside of the HARB property boundary. The soil re-use policy may be found at http://www.miamidade.gov/environment/pollution-remediation.asp

8.6 Security, Vehicles, and Parking.

8.6.1 The Contractor shall follow existing security Base traffic and parking procedures and instructions applicable to HARB.

8.6.2 The Contractor shall be responsible for the physical security of all materials, supplies, and equipment, including property that is being utilized.

8.6.3 The Government shall not be held liable for any delays prior to the Contractor reaching the gate. The Contractor must give notice that they are ready to proceed through the gate.

8.6.4 The Contractor’s employees’, suppliers’, and subcontractors’ vehicles shall not be parked on grass/landscaped surfaces at any time. In addition, vehicles may not be driven over grass/landscaped surfaces, unless indicated and approved by the GPM during the site visit or pre-construction conference.

8.6.4.1 Contractor vehicles shall be in top repair and be able to be shut off and restarted without outside aid. Vehicles in need of repair will be replaced not later than the following morning. Downed and unrepairable vehicles must be removed from the Base. If necessary, the Contractor shall provide a flatbed trailer and rig or a tow truck at their cost to remove the vehicle from the Base.

Vehicles will be in safe operating conditions at all times, have seatbelts, or will be denied access to the Base. At no time will Contractors perform routine maintenance on vehicles which would result in the dumping of any fluid onto the ground. The Contractor shall not transport rollers, paving equipment, or other slow moving construction equipment on and throughout HARB unless it is loaded on a flatbed or lowboy.

8.7 Vehicular Traffic.

8.7.1 Traffic Control Devices. The Contractor shall comply with the local laws and regulations, to include Air Force regulations, regarding the safe operation of equipment in and around roadways associated with the construction site. Contractor owned and/or operated vehicles violating speeding, parking, or traffic regulations on Federal Government grounds property may be removed from the installation at the Contractor’s expense. Should this be the case, the Government will not be held liable for the time delay to the Contractor nor such costs that might occur based on the vehicle removal.

8.7.1.1 The Contractor shall coordinate to ensure proper warnings to motorists are posted and adequate traffic control is used when vehicles are present. This shall be coordinated with the Contracting Office and approved by the GPM.

8.7.1.2 The Contractor shall address known traffic impedances within the site/location drawing and the safety plan. Coordinate submittal dates per the AF Form 66.

8.7.1.3 Signs, warning lights, barricades, and other traffic control devices shall be provided by the Contractor. Warning lights will be operational at all times during non-daylight hours. Barricades shall be highly luminescent and clearly visible at night. Signs shall also be highly luminescent, blaze orange in color with black lettering, and be clearly visible from at least 50ft (15m) away.

8.7.1.4 Temporary traffic control signs (warning and hazard signs) shall be furnished and installed, at the discretion of the GPM, by the Contractor while projects are underway. These warning signs shall be placed near the beginning of the work site and well ahead of the work site for alerting approaching traffic from both directions. Slow-moving equipment shall be marked with large warning signs indicating slow-moving equipment in operation.

8.7.1.5 Road Diversions/Closures. The Contractor shall notify the GPM at least 15 business days prior to work if construction will impact traffic on the roadways.

The Contractor shall state in writing the exact dates of the road closure, duration of closure, and provide a traffic diversion map showing the location of the diversion (if available), closure, posting of signage, phasing plan (if applicable), and other pertinent information for the impedance.

8.7.1.6 All costs including, but not limited to, design, procurement, equipment, installation, maintenance and removal, associated with the temporary traffic control signs, barriers, barricades, warning lights, diversions, etc. are the sole responsibility of the Contractor.

8.8 Sanitary Provisions. The Contractor shall provide temporary toilets that satisfy HARB requirements for the use of project personnel. Location, type, proposed maintenance, etc., shall be approved by the GPM prior to placing toilets. Temporary toilets shall be removed at the completion of the project. All costs incurred in connection with the temporary toilets shall be paid by the Contractor.

8.8.1 All temporary sewer and sanitation facilities shall be self-contained units with both urinals and stool capabilities. Ventilate the units to control odors and fumes and empty and clean them at least once a week or more often if required by the Contracting Officer. The doors shall be self-closing.

8.9 Fire Prevention.

8.9.1 The Contractor shall perform all work in a fire safe manner in accordance with local, state, and federal fire codes. In addition, work shall be performed in accordance with NFPA 241, Safeguarding Building Construction and Demolition Operations. Special attention shall be provided for welding, cutting or open flame operations in accordance with AFOSH 91-5, and 29 CFR 1910-252.

8.9.2 The prevention of fire is imperative during construction projects. The Contractor is responsible for enforcing fire safety in the work area.

8.9.3 The Contractor shall have fire extinguishers and first aid kits available on construction equipment and at the job site. A 10 ABC minimum rating is required for fire extinguishers.

8.9.4 The Contractor must report all fires to the HARB Fire Department. The Contractor must attempt to extinguish the fire only if it is safe to do so, and/or go to the nearest phone and notify the Fire Department at 911 and have someone meet the Fire Department upon arrival to provide additional information. Cell phone users must call 786-415-7117 for the Fire Department at HARB.

8.9.5 The Contractor shall have serviceable fire extinguishers readily available at all times.

8.9.6 Burning of trash and rubbish at the construction site is strictly prohibited.

8.9.7 No open flame operations such as welding, cutting, or brazing will be done without approval of the Fire Department. The Fire Department will issue an AF Form 592 “USAF Welding Cutting & Brazing Permit” as verification of approval.

8.9.8 The Contractor may not use gasoline or diesel fuel for cleaning parts or surfaces.

8.9.9 Electrical extension cords may be used on a temporary basis to power tools and equipment. Do not overload extension cords. Frayed, cut, or spliced extension cords are prohibited.

8.10 Site Safety.

8.10.1 Fire, Environmental, and Public Health Inspections. At any time the construction site and laydown yard (if applicable) can be inspected by the CO or GPM for fire, safety, environmental, or public health discrepancies. Any discrepancies noted shall be fixed immediately. If discrepancies cannot be fixed immediately, the Contractor shall remove the items from the installation. Any costs or time delays associated with correcting discrepancies are the sole responsibility of the Contractor.

8.10.2 The Contractor shall assume full responsibility and liability for compliance with the applicable regulations pertaining to the health and safety of personnel during the execution of work and shall hold the Government harmless for any action on his part or that of his employees or subcontractors, which results in illness, injury, or death.

8.10.3 The Contractor shall conduct initial and periodic safety training for their employees and ensure that all subcontractor employees have had proper safety awareness training.

8.10.4 The Contractor must comply with U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, IAW FAR Clause 52.236-13, Accident Prevention. The Contractor shall comply with all federal, state, and local laws and Air Force Instructions for the protection of their employees while working on an Air Force Installation or property. The protection of Contractor employees is exclusively the obligation of the Contractor. The Contractor shall manage all work areas to ensure the safety of building occupants, Base personnel, and visitors in or near the areas.

8.10.5 The Contractor shall promptly report pertinent facts regarding mishaps involving reportable damage Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact to the CO. The Contractor shall provide a completed copy of an Accident Investigation Report (ENG Form 3394, United States Army Corps of Engineers Accident Investigation Report or Contractor equivalent) to the CO within five calendar days of completion.

8.10.6 IAW AFI 91-202 and AFMC Supplement to AFI 91-202, The U.S. Air Force Mishap Prevention Program, the Contractor shall submit a Safety and Health Plan and corresponding site safety checklist that describes the capabilities and processes to ensure compliance with safety and health requirements during the performance of the work described in the contract to the CO within 30 calendar days after contract award, for review/approval. The Contractor’s plan shall include appropriate measures to ensure the Contractor reacts promptly to investigate, correct, and track alleged safety and health violations and/or uncontrolled hazards in Contractor work areas. The plan shall:

8.10.6.1 Demonstrate a management commitment to employee safety and health;

8.10.6.2 Identify the application of the safety and health plan to subcontractors;

8.10.6.3 Identify the roles and responsibilities of the following individuals:

Management, Supervisors, Employees, and Safety Coordinator;

8.10.6.4 Identify applicable safety rules and regulations;

8.10.6.5 Include a worksite hazard analysis to include base-line hazard identification and required control measures;

8.10.6.6 Include a job site analysis to include hazards of tasks required to control measures;

8.10.6.7 Identify employee safety and health training requirements and the documentation process;

8.10.6.8 Include a workplace inspection frequency, to include identifying the individual conducting the inspections;

8.10.6.9 Include employee hazard reporting procedures;

8.10.6.10 Identify individual(s) responsible for corrective action hazards;

8.10.6.11 Identify first aid/injury procedures;

8.10.6.12 Identify procedures for accident investigation and reporting, to include mishap reporting procedures which result in damage to Government property or injury to Air Force personnel;

8.10.6.13 Identify emergency response procedures; and

8.10.6.14 Identify the process for tracking controlled hazards in Contractor work areas safety equipment.

8.10.6.15 Ensure the plan includes requirements relating to OSHA Form 300, Log of Work-Related Injuries and Illnesses, and OSHA Form 300A, Summary of Work-Related Injuries and Illness.

8.10.7 The Contractor shall ensure all Contractor and subcontractor personnel have personal safety equipment during performance of this contract. Safety equipment includes, among other things, shoes or boots, eyewear, respirators, hardhats, and gloves. The Contractor is responsible for establishing these requirements for all subcontractors who qualify as subcontractors under the resulting contract.

8.10.8 Jet…