Attachment 1- Gavins Drawings.pdf
PDF 461 KB Posted
- Attached to
- Concrete Pads and Project Pavement Marking
- Solicitation number
- W9128F24Q0085
About this file
This document appears to be a set of drawings related to a federal contract opportunity issued by the U.S. Army Corps of Engineers, Engineering District Omaha. The contract solicitation, identified as W9128F24Q0085, is for the supply of labor, equipment, and materials to prepare and pave concrete pads at the Gavins Point Cottonwood Campground, as well as undertake roadway marking throughout the Gavins Point Project area.
The estimated quantities for this contract are 735 square yards of 6-inch depth concrete pads and 16,700 linear feet of pavement markings. The drawings provide detailed information on the locations and layouts of the concrete pads and pavement markings required, including the Cottonwood Campground, Tailwaters, Training Dike, and other areas within the Gavins Point Project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers (2).pdf | ||
| Questions and Answers Gavins Point.pdf | ||
| Amendment 1.pdf | ||
| Solicitation- W9128F24Q0085 Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NIOBRARA
B A Z
IL
E
C R
CROFTON
BEAVER
W E
IG
A N
D
LOCATIION MAP
N E B R A S K A x x x x xx x x xx xx x x x xx x x x x x x x x x
OVERLOOK "C"
POWER
PLANT
S W
Y D
AREA 3
PICNIC
STOR BLDG
T A I L
W A
T
A
E A
M I S
S O
U R I
R I V
E R
T R
A I N I N
G
D I K
A
E A
F L
O W
TRAINING DIKE ROAD
SPILLWAY
EL 120
COTTONWOOD
AREA
LAKE YANKTON
WASTE
S O U T H
D A K O T A
ES FISH & WILDLIFE
LEASE BOUNDRY
REARING POINDS
LAB
BLDG
DOWNSTREAM
TOE ROAD
CREST
ROAD
PARKING
REST
ROOMS
CAMPING
AREA
PIERSON
RANCH
AREA
FLOODWALL
NATINAL
FISH
RES.
HATCHERY
B A Z
IL
C
BEAVER
W E
IG
A N
D x x x x xx x x xx xx x x x xx x x x x x x x x x
AREA 3
PICNIC
LEWIS & CLARK LAKE
EL 120
S O U T H
D A K O T A
LAB
BLDG
PARKING
FLOODWALL
RES.
ROOM
REST
SHELTER
PICNIC
GAVINS POINT DAM
center visitor
CORPS ROAD
STATE ROAD
swimming beach station fish cleaning rest room vault toilet parking kyak loop road picnic shelter vault toilet fishing pier handicap boat ramp vault toilet picnic shelter picnic shelter rest room rest room picnic shelter vault toilet fishing pier handicap vault toilet vault toilet boat ramp project location ramp road walkway boatyard
Training Dike
Tailwaters
Yellow line = Yellow paint Blue line = White paint
PARKING
y
M I S
S O
U R I
R I V
E
Tailwaters
TOE ROAD
swimming beach
Training Dike
POWER
PLANT SPILLWAY
walkway picnic shelter ramp road
C12
C11
Gate Valve W/Box
XC4
15(1)
C2
C3
C8
1P
C4
Hydrant
5-08
House Shelter
(BOOTH ATTENDANT)
CAMP PAD
CONTRACTOR
2P 4P
6P
8P 9P
10P
RESTROOM
EXISTING
4" PSI
Pipe
Sewage Lift Station
NO.1
MH 1
Cottonwood Campground Concrete Pad Locations
| Gavins Concrete Pads and Project Pavement Marking - Scope of Work |
| Gavins Concrete Pads and Project Pavement Marking - Scope Attachment |
| Proj Road Striping - Overview |
| Proj Road Striping - Overview |
| Proj Road Striping - Boatyard |
| Proj Road Striping - Tailwaters |
| Proj Road Striping - Toe Road |
| Proj Road Striping - Training Dike |
| Proj Road Striping - walkway and spillway |
| Proj Road Striping -Ramp Road |
Cottonwood Concrete Pads
File details come from the government source that posted it. Updated .