Shape Stable Nose Tip (SSNT) Accelerated Process Manufacturability
Solicitation number
N00030-26-RFPREQ-SP28-0030
Issued by

About this file

This is a Statement of Work (SOW) for the Shape Stable Nose Tip (SSNT) Accelerated Process Manufacturability effort under Navy Strategic Systems Programs. The contractor is required to procure, install, integrate, and qualify specialized Commercial-Off-The-Shelf (COTS) and bespoke industrial manufacturing equipment to support the lifetime manufacturing requirements of the Mk7, Mk4B, and Mk21A strategic programs. The scope includes phased procurement of Contractor-Acquired Property (CAP) with long-lead items, facility integration, execution of Installation Qualification/Operational Qualification/Performance Qualification (IQ/OQ/PQ) processes through manufacturing of SSNT proofing billets, and Systems Security Engineering to achieve Navy SSP Authority to Operate (ATO) certification.

The contract structure includes Cost-No Fee CLINs for physical equipment procurement and Cost-Plus Fixed Fee (CPFF) Level of Effort (LOE) CLINs for installation, qualification, and engineering services. The Period of Performance consists of a Base Year from July 1, 2026, through September 30, 2027, with two optional one-year periods extending through September 30, 2029. This pre-solicitation effort represents market research by the Department of the Navy Strategic Systems Programs to identify capable contractors with the technical expertise and manufacturing infrastructure to successfully execute this complex industrial equipment qualification and manufacturing capacity expansion program.

View the file

Other files

File Type Posted
SOW Attachment 1 - BOM - Final.xlsx XLSX spreadsheet
Attachment 2 - TABLE A format.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section C - Descriptions and Specifications

ITEM 0001 – Phased Equipment Procurement (Cost – No Fee)

During the period of 1 July 2026 – 30 September 2027, the Contractor shall make available and employ its facilities and personnel at the level of effort as specified within Section F, services of others, and materials, and shall use its best efforts to perform the following:

1.0 Specific Requirements

The Contractor shall provide the necessary personnel, materials, and facilities to execute the phased procurement, installation, and verification of distinct equipment systems (Equipment E1 through Equipment E13) identified in Attachment 1 – Bill of Materials (BOM). Because this effort will be executed across multiple Periods of Performance, the Contractor shall perform the following sub-tasks for each piece of equipment as directed by the Government.

1.1 Phased Equipment Procurement of Contractor-Acquired Property (CAP) The Contractor shall procure the items explicitly detailed in Attachment 1: Master Bill of Materials (BOM).

1.1.1 Phased Execution: Procurement shall occur in phases across the contract lifecycle. At the beginning of each Period of Performance (or as required), the Contractor shall procure items listed in Attachment 1 that correlate with the specific year.

1.1.2 CAP Management: The Contractor shall not initiate procurement of any equipment on the Master BOM without Contracting Officer authorization. Title to all procured equipment shall vest with the Government.

ITEM 0002 – Equipment Installation, Integration, and Testing (CPFF – LOE)

During the period of 1 July 2026 – 30 September 2027, the Contractor shall make available and employ its facilities and personnel at the level of effort as specified within Section F, services of others, and materials, and shall use its best efforts to perform the following:

1.1 Equipment Installation and Integration

Upon receipt of the authorized equipment at the Contractor’s facility, the contractor shall provide the Level of Effort (LOE) necessary to physically install, configure, and integrate the equipment into the overarching system architecture as defined.

1.1.1 Technical Installation: For each piece of authorized equipment, the contractor shall:

1.1.1.1 [Insert installations specifics. May be deleted if not needed].

1.1.1.2 [Insert installations specifics. May be deleted if not needed].

1.1.1.3 [Insert installations specifics. May be deleted if not needed].

1.2 Sub-System Testing and Verification

Following the installation of each phased equipment delivery, the Contractor shall execute functional testing to ensure the newly integrated hardware operates correctly.

1.2.1 Test Procedures: Prior to testing, the Contractor shall prepare and deliver a Test Procedure (CDRL A00X) tailored to the specific equipment installed during that phase.

1.2.2 Execution and Reporting: Upon COR approval of the procedure, the Contractor shall execute the verification test and prepare and deliver the results in a Test Report (CDRL A00X). No phase of installation shall be considered complete until the Government accepts the respective Test Report.

ITEM 1001 – Phased Equipment Procurement (Cost – No Fee)

If exercised, during the period of 1 October 2027 – 30 September 2028, the Contractor shall provide the services and data as described in Item 0001 above.

ITEM 1002 – Equipment Installation, Integration, and Testing (CPFF – LOE)

If exercised, during the period of 1 October 2027 – 30 September 2028, the Contractor shall provide the services and data as described in Item 0002 above.

ITEM 2001 –– Phased Equipment Procurement (Cost – No Fee)

If exercised, during the period of 1 October 2028 – 30 September 2029, the Contractor shall provide the services and data as described in Item 0001 above.

ITEM 2002 – Equipment Installation, Integration, and Testing (CPFF – LOE)

If exercised, during the period of 1 October 2028 – 30 September 2029, the Contractor shall provide the services and data as described in Item 0002 above.

ITEM 9998 – Contract Data Requirements List (CDRLs)

The contractor shall provide the data set forth in the Contract Data Requirements Lists (CDRL), DD Forms 1423, attached as Exhibit A.

The Contractor shall prepare and deliver technical, administrative, and financial data in accordance with the following:

1. Contract Data Requirements Lists, DD Forms 1423, Section J, Exhibit A; and the aforementioned documents shall include all classified annexes as applicable.

ITEM 9999 – Contractor Acquired Property (CAP)

The contractor shall provide the data set forth in the Contractor Acquired Property (CAP), DD Forms 250, attached as Exhibit B.

The Contractor shall prepare and deliver technical, administrative, and financial data in accordance with the following:

i. Contractor Acquired Property Lists, DD Forms 250, Exhibit B; and the aforementioned documents shall include all classified annexes as applicable.