Attachment 1 - Form B - Technical Response.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- RFP 95-21 - Offsite Storage
- Solicitation number
- BD-21-1206-40000-40000-64171
- Issued by
- Suffolk County, Boston City, Massachusetts
About this file
This document is a technical response worksheet for a Request for Proposal (RFP) issued by the Massachusetts Bay Transportation Authority (MBTA) for offsite storage of file boxes. The MBTA is seeking a vendor to remove file boxes from their facility at Arborway and store them for a 5-year period. The worksheet requests information about the vendor's storage facility, including the address, age, fire suppression system, security system, timeline for box removal and storage, ability for the MBTA to access the boxes, and climate control/vault storage options. The vendor is also asked to provide information about the temperature range of the facility and to list 3 references for similar-sized jobs.
The RFP is identified as MBTA RFP 95-21 under COMMBUYS # 21-1206-40000-40000-64171. No additional details are provided about pricing, set-asides, incumbents, funding requirements, or other contract terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1 - Calendar.docx | DOCX document | |
| Attachment 2 - Form C- Price Proposal.xlsx | XLSX spreadsheet | |
| NoA~4.docx | DOCX document | |
| RFP 95-21 - Offsite Storage.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Form B: Technical Response | |
| MBTA RFP 95-21 | |
| COMMBUYS # 21-1206-40000-40000-64171 | |
| Instructions: Please answer all the questions below | |
| Vendor: | |
| Question | |
| Address of the storage Location | |
| How old is the facility | |
| Please describe the fire suppression system at your storage facility | |
| Please describe the security system at the storage facility | |
| Give a timeline for box removal and storage | |
| Will be MBTA have the ability to pull boxes over the life of the Contract? | |
| How much advance notice will be needed to pull boxes? | |
| If there are additional files that need to be stored, how much lead time will be needed to have the boxes picked up and placed in storage? | |
| Does your facility have climate controlled or vault storage options - please describe | |
| What is the temperate range of the facility under normal operating conditions | |
| List 3 jobs of similar size and provide contact information for references Name of Client Contact Information |
File details come from the government source that posted it. Updated .