ATTACHMENT 1 FOR SOLICITATION HC101320QA330.pdf
PDF 187 KB Posted
- Solicitation number
- HC101320QA330
- Issued by
-
Defense Information Systems Agency
About this file
This solicitation requests quotes for a 10 gigabit Ethernet over OTN circuit between two government locations. The selected vendor must provide, install, and maintain the circuit with 10G Ethernet handoff and single mode fiber termination using either SC or LC connectors as determined by site survey. Quotes are due by March 26, 2020 with the requested service date and testing criteria outlined in the attachment. The Defense Information Systems Agency is the contracting agency, and the selected company must comply with commercial item terms and conditions in existing basic agreements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC101320QA330 amendment.pdf | ||
| Solicitation Sample Vendor Block Diagram and Circuit Path Maps_Version2.pdf | ||
| HC101320QA330.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1 FOR SOLICITATION HC101320QA330
VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) O
N EXTENSION FROM COMMERCIAL POP TO GOVERNMENT SERVICE DELIVERY PO
INT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE
GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE A
DJUSTED TO -3 TO -9 DBM. VENDOR MUST CONDUCT WALK-
THROUGH SITE SURVEY PRIOR TO INSTALLATION AT THE "A" AND "Z" LOCATION
S. VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND IMPLEM
ENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE COORDINA
TION AND ACTIVATION PROCESS. (C) 618-418-8627 (D) 418-
8627 PROVIDER MUST CONDUCT A SATISFACTORY 24-
HOUR TEST FROM THE DROP SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FD
P INSTALLED IN THEIR EQUIPMENT SUITE AT THE "A" LOCATION TO THEIR OR LO
CAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE
"Z" LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN THE
COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST ENSURE
TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION AND AT
THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER
TO THE GOVERNMENT FOR ACCEPTANCE TESTING.
1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:
(A) VENDOR PROVIDED 10G ETHERNET SIGNAL TO THE DISA ROUTERS. -
10GIGABIT ETHERNET OVER OTN (OTU2), OTU2 CIRCUIT WILL CARRY 10GBE LAN
PHY PAYLOAD, THE VENDOR WILL DEMONSTRATE THAT THE PAYLOAD STRUCT
URE IDENTIFIER (PSI) BYTE IN COLUMN 15, ROW 4 OF THE OTU2 FRAME CAN TRA
NSPORT VALUE 0X09 BIDIRECTIONALLY ERROR FREE.
- REFERENCE: PARA 17.4.1, ITU-T G.709/Y.1331 (06/2016) MAPPING
OF GFP FRAMES INTO AN EXTENDED OPU2 PAYLOAD AREA.
10GIGABIT ETHERNET -
LAN PHY INTERFACE REQUIRED AT COMMERCIAL DEMARC AT THE "A" AND "Z "
LOCATIONS.
FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-
10GB ETHERNET-LAN-PHY
SINGLE MODE FIBER), 1310NM. "SC" OR "LC" CONNECTORS AS DETERMINED BY SI
TE SURVEY. NOTE: WHEN EXTENDED REACH OPTICS ARE USED THAT CHANGE T
HE TX/RX WAVELENGTH OF THE OPTIC, THE VENDOR WILL
NOTIFY THE GOVERNMENT 30 DAYS PRIOR TO DELIVERY. (C) COMMITTED INF
ORMATION RATE (CIR): 10GB
(D) ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRAN
SMISSION UNIT (MTU) OF 9000 OCTETS (BYTES) JUMBO FRAMES.
(E) NO NETWORK INTERFACE UNIT, DEDICATED PATH
(F) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS
IAW ITU-T.Y.1564 (02/2016) ETHERNET SERVICE ACTIVATION - SIMPLE
CIR VALIDATION TEST WITH EMIX PATTERN ADDFH. NOTE: ETHERNET FRAME
SIZE DESIGNATOR 'H' (PHYSICAL MTU) IS EQUAL TO 9000 BYTES.
(G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24
HOURS A DAY, SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5%
AVAILABILITY OR BETTER.
(H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT OF
TROUBLE.
(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY
CIRCUIT OUTAGES.
(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.
(K) TELECOMM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND
ADMINISTRATION MONITORING OF ETHERNET CIRCUIT.
(L) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE
GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8627 (D)
418-8627.
2. VENDOR MUST PROVIDE: A. VENDOR WINNING AWARD IS RESPONSIBLE FOR IN
STALLATION AND MAINTENANCE OF THE SERVICE IAW THE UNIQUE INSTALLAT
ION FACTORS. B. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATIO
N FACTORS. C. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN
ADVANCE PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH USER
LOCATIONS.
3. ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE
TO THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP,
SCOTT AFB, IL. PRIMARY: (C) 618-418-9950, (D) 418-9950 TOLL FREE: 855-868-9950
MINIMUM TECHNICAL SPECIFICATIONS:
SPECIFIC FORMAT TO BE USED IS:
LINE RATE: 10.3125 GIGABITS/S, +- 100 PPM
LINE CODE: OPTIC
1. TEST AND ACCEPTANCE: CIRCUITS SHALL PASS A FULLY DOCUMENTED
SATISFACTORY 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL.
PRIMARY: (C) 618-418-8627 (D) 418-8627.
2. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE
FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY
SHALL BE GREATER THAN 99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL
TO ZERO WHEN TESTING AT 10 GIGABIT HIGHEST FRAME RATE, AND SHALL
MEET ITU-T-Y.1564 STANDARDS.
3. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE
GREATER THAN 24 HOURS.
4. ROUND TRIP DELAY (RTD): RTD SHALL BE MEASURED OVER THE 10GB
CIRCUIT AND SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS PER
350 MILES MEASURED AS THE GREAT CIRCLE DISTANCE BETWEEN THE "A"
AND "Z" LOCATIONS.
5. ROUND TRIP DELAY VARIANCE (JITTER) SHALL BE NO MORE THAN 3MS.
(**UNIQ INSTALL FACTORS**) (SP A) ION AND MAINTENANCE OF SINGLE
MODE FIBER FROM LINE SIDE OF
SITE PROVIDED FIBER TERMINATING PATCH PANEL BLDG 1700, TOWER B,
TELCO ROOM TO LINE SIDE OF SITE
PROVIDED FIBER TERMINATING PATCH PANEL BLDG 1700, TOWER A, TELCO
ROOM.
File details come from the government source that posted it. Updated .