This is a Quality Assurance Surveillance Plan (QASP) for a Veterans Affairs mental health residential rehabilitation treatment program contract that outlines performance monitoring requirements and rating criteria. The document specifies three key performance areas: veteran safety reporting (requiring incidents to be reported within 1 hour), incident resolution (requiring consultation with program manager within 1 business day), and veteran satisfaction monitoring (requiring monthly stakeholder meetings and quarterly satisfaction surveys).
The QASP establishes five performance rating levels - Exceptional, Very Good, Satisfactory, Marginal, and Unsatisfactory - with detailed criteria for each level. It outlines the process for documenting contractor performance through Contract Reports (CRs) and describes how corrective action plans must be implemented for unacceptable performance. The document includes templates for the Contract Report form and requires formal acknowledgement by both the COR and contractor. Performance documentation may become part of the Contractor Performance Assessment Report (CPAR) and can impact future contract actions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ AMENDMENT 36C25625Q0139 0001- MH RRTP.pdf | ||
| 36C25625Q0139 0001.docx | DOCX document | |
| REVISED RFQ- 36C25625Q0139- MH RRTP SERVICES 2 DEC 2024.pdf | ||
| ATTACHMENT 2 WAGE DETERMINATION- JACKSON- RESIDENTIAL SERVICES.pdf | ||
| 36C25625Q0139.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment D.1 Quality Assurance Surveillance Plan (QASP)
Veteran Safety – Reporting 7.1.1.5 Veteran safety incidents reported to the respective treatment program (DOM SUD and/or DOM PTSD) or on-call psychiatrist.
All incidents reported within one (1) hour of the incident.
Direct observations and periodic inspection, observed through communication and residential treatment records.
Veteran Safety – Incident Resolution
7.1.1.6 All Veteran safety
incidents are investigated, confirmed, and resolved.
Contractor will consult with the appropriate program manager within one (1) business day of the event.
Periodic inspection:
reviewed during analysis of critical incidents, routine site inspections, and any accreditation surveys.
Veteran Satisfaction 7.1.1.7 Contractor assesses Contractor representative Periodic patient satisfaction attends monthly inspection:
and solicits stakeholder meeting to attendance at complaints and receive and respond to stakeholder suggestions regarding feedback. Veteran meeting. User the quality of care. satisfaction survey is survey and administered by quarterly roll-up contractor, with results reports that tallied and reported to include any TRP and ADTP on at qualitative least a quarterly basis. statements from veterans.
7. CPAR RATINGS ASSIGNED TO QASP ITEMS:
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:
EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the
Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
VERY GOOD:
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.
SATISFACTORY:
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.
MARGINAL:
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTO
RY: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).
8. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR
PERFORMANCE ASSESSMENT REPORT (CPAR).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor's performance and the acceptability of the Contractor's corrective action plan.
Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
See Sample on following page.
9. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
COR NAME/TITLE DATE
CONTRACTOR NAME/TITLE DATE
CONTRACT REPORT
1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS DISCREPANCY
3. TO: (Contracting Officer) 4. FROM: (Name of COR)
5. DATES
a. CR PREPARED b. RETURNED BY
CONTRACTOR:
c. ACTION COMPLETE
6. Issue Identified (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
7. SIGNATURE OF COR Date:
8. SIGNATURE OF CONTRACTING OFFICER Date:
9a. TO (Contracting Officer) 9a. FROM (Contractor)
10. CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT RECURRENCE.
(Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:
12. GOVERNMENT EVALUATION.
13. GOVERNMENT ACTIONS
14. CLOSE OUT
NAME TITLE SIGNATURE DATE
CONTRACTOR
NOTIFIED
COR
CONTRACTING
OFFICER
| Quality Assurance Surveillance Plan (QASP) |
| Quality Assurance Surveillance Plan (QASP) |
| 8. DOCUMENTING PERFORMANCE |
| 9. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP |
| 2024-03-27T12:41:48-0500 | |
| Alexander S. Rakhshan |
File details come from the government source that posted it. Updated .