Attachment 1_Facility Diagrams.pdf

PDF 658 KB Posted

Attached to
Purchase and Installation of Vault Doors
Solicitation number
47QSSC255294
Issued by

About this file

This document is an Attachment containing facility diagrams for multiple buildings, specifically detailing door configurations for various rooms across seven different buildings (Buildings 1810, 1182, 1802, 1805, 1097, 1380). The diagrams highlight primary and vestibule doors for specific rooms, with most locations having either 1 or 2 doors. Each building's floor plan is drawn in detail, with red circles indicating the specific door locations being referenced. The rooms are typically labeled with room numbers and include additional contextual information such as "OPS Office", "Flight Briefing", and other functional area designations. The consistent formatting shows a methodical approach to documenting facility access points, which could be part of a security, facilities management, or infrastructure planning document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 Facility Diagrams

a. Building 1810 – Room 227 (primary door and vestibule door) = 2 doors

b. Building 1810 – Room 131 (primary door and vestibule door) = 2 doors

c. Building 1182 – Room 101 (primary door and vestibule door) = 2 doors

d. Building 1802 – Room 101 (127) (vestibule door) & 102 (127A) (primary door) = 1 door

e. Building 1805 – Room 105 (primary door and vestibule door) = 2 doors

f. Building 1097 – Room 134A (primary door) & B (primary door) = 1 door

g. Building 1380 – Room 120 (primary door and vestibule door) = 2 doors

File details come from the government source that posted it. Updated .