Attachment 1 Elevated Burn Pricing Sheet.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Elevated Burn Simulator System
- Solicitation number
- W25G1V25Q0005
- Issued by
-
Department of the Army
About this file
This document is an attachment containing a pricing table for Solicitation W51AA1-24-Q-0025 Elevated Burn Simulator System. The solicitation is for a non-personal services contract to provide preventative maintenance and unscheduled/emergency repairs for the Elevated Burn System Simulator located in Tobyhanna, PA. The pricing table includes Contract Line Items (CLINs) for base year and option year fixed-price preventative maintenance, as well as time-and-materials CLINs for unscheduled emergency repairs by labor category (general construction, mechanical/HVAC, balancing, electrical, and controls technicians). Offerors are instructed to provide fully burdened hourly labor rates for the unscheduled emergency repair CLINs, which will be evaluated as part of the total evaluated price. The total evaluated price is for evaluation purposes only, as the Government will approve and fund any unscheduled emergency repair work on an as-needed basis. A site visit is scheduled for October 24, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Wage Rate.pdf | ||
| 25Q0005 Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment - Pricing Table for Solicitation W51AA1-24-Q-0025 |
| Elevated Burn Simulator System |
| **This attachment shall be submitted as part of the offeror's proposal. | ||||||||||
| Contract Line | ||||||||||
| Number (CLIN) | Description | Quantity | Unit | Hourly Rate | Unit Price | Total Price | ||||
| CLIN 0001 | Base Year | FFP | Preventive Maintenance | 1 | Lot | $0.00 | Enter a Firm Fixed Price for "Preventive Maintenance" to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. | |||
| CLIN 0002 | Base Year | T&M | Unscheduled Emergency Repairs: | |||||||
| General Construction | 8 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing "Unscheduled Emergency Repairs" IAW PWS. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | ||||||
| Mechanical/HVAC technician | 8 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing "Unscheduled Emergency Repairs" IAW PWS. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | ||||||
| Balancing technician | 8 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing "Unscheduled Emergency Repairs" IAW PWS. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | ||||||
| Electrical technician | 8 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing "Unscheduled Emergency Repairs" IAW PWS. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | ||||||
| Controls technician | 8 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing "Unscheduled Emergency Repairs" IAW PWS. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | ||||||
| Total Evaluated Price for the Base Year: | $0.00 |
| CLIN 1001 | Option Year 1 | FFP | Preventive Maintenance | 1 | Lot | $0.00 | Enter a Firm Fixed Price for "Preventive Maintenance" to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. |
| CLIN 1002 | Option Year 1 | T&M | Unscheduled Emergency Repairs: | ||||
| General Construction | 8 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing "Unscheduled Emergency Repairs" IAW PWS. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| Mechanical/HVAC technician | 8 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing "Unscheduled Emergency Repairs" IAW PWS. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| Balancing technician | 8 | Hours | $0.00 | Enter a Firm Fixed Price for "Preventive Maintenance" to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. | |||
| Electrical technician | 8 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing "Unscheduled Emergency Repairs" IAW PWS. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| Controls technician | 8 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing "Unscheduled Emergency Repairs" IAW PWS. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| Total Evaluated Price for Option Year 1 | $0.00 |
| CLIN 2001 | Option Year 2 | FFP | Preventive Maintenance | 1 | Lot | $0.00 | Enter a Firm Fixed Price for "Preventive Maintenance" to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. |
| CLIN 2002 | Option Year 2 | T&M | Unscheduled Emergency Repairs: | ||||
| General Construction | 8 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing "Unscheduled Emergency Repairs" IAW PWS. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| Mechanical/HVAC technician | 8 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing "Unscheduled Emergency Repairs" IAW PWS. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| Balancing technician | 8 | Hours | $0.00 | Enter a Firm Fixed Price for "Preventive Maintenance" to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. | |||
| Electrical technician | 8 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing "Unscheduled Emergency Repairs" IAW PWS. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| Controls technician | 8 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing "Unscheduled Emergency Repairs" IAW PWS. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| Total Evaluated Price for the Option Year 2 | $0.00 |
| TOTAL EVALAUATED PRICE >>>>>>>>>>>>>>>> | $0.00 |
| Entries are required in the Green Shaded cells. |
Enter an HOURLY LABOR RATE for performing ALL approved "Unscheduled Emergency Repairs" IAW PWS. The hours estimated for the "Unscheduled Emergency Repairs" is strictly for use in evaluating offers and will not restrict or obligate the Government to a specified number of hours in any way.
REMINDER: Service Contract Labor Standards. FAR 37.107 and 41 USC Chapter 67, Service Contract Labor Standards, provides for minimum wages and fringe benefits as well as other conditions of work under certain types of service contracts. Service Contract Labor Standards are applicable to this acquisition (Reference Attachment III Wage Determinations).
TOTAL EVALUATED PRICE - This price will be used for "EVALUATION PURPOSES ONLY" as it includes an estimate for "On Call Inspections / Repairs". All funding for "On Call Inspections / Repairs" will be approved by the Contracting Officer Representative (COR) prior to commencement of any work.
Instructions: Offerors are instructed to fill in the green shaded cells. This pricing shall also be populated on the signed SF 1449.
File details come from the government source that posted it. Updated .