25Q0005 Solicitation.pdf
PDF 949 KB Posted
- Attached to
- Elevated Burn Simulator System
- Solicitation number
- W25G1V25Q0005
- Issued by
-
Department of the Army
About this file
This document is a solicitation for a non-personal services contract to provide preventative maintenance and emergency repairs for the Elevated Burn System Simulator (EBSS) equipment located at Tobyhanna Army Depot in Pennsylvania.
The contract will be a hybrid firm-fixed price and time and materials contract. Key requirements include performing routine scheduled preventative maintenance as well as responding to unscheduled and emergency repair calls. A site visit will be held on October 24, 2024. Proposals are due by November 7, 2024 and the contract will be awarded on a best value basis considering technical, past performance, and price factors. The contract will be a 100% small business set-aside and the incumbent contractor's contract ends in 2024. Pricing for the preventative maintenance and time and materials repair work must be submitted using the provided pricing template.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 Elevated Burn Pricing Sheet.xlsx | XLSX spreadsheet | |
| Attachment 2 - Wage Rate.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W51AA125Q0005 18-Oct-2024
b. TELEPHONE NUMBER
570-615-9288
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 07 Nov 2024
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W51AA19. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JASON BURKE
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SEE SCHEDULE
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
ACC-APG TOBYHANNA DIVISION (W51AA1)
11 HAP ARNOLD BLVD
TOBYHANNA PA 18466
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$9,000,000
NAICS:
811490
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF64
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W51AA125Q0005
Section SF 1449 - CONTINUATION SHEET
ADDENDUM
1. This Solicitation, W51AA1-25-Q-0005, is in accordance with FAR Part 12, Acquisition of Commercial Items and FAR Part 13, Simplified Acquisition Procedures, and therefore will utilize simplified procedures for soliciting competition, evaluation, award documentation and notification that comply with FAR 13. This requirement is a 100% Total Small Business Set-Aside.
2. The Army Contracting Command (ACC), APG, Tobyhanna Division, Tobyhanna, PA 18466, intends to solicit and award a hybrid firm-fixed price (FFP) and time and materials (T&M) services contract for these services located at Tobyhanna Army Depot, Tobyhanna PA 18466, in accordance with (IAW) the attached Performance Work Statement (PWS).
3. Site Visit: IAW FAR Clause 52.237-1, a single site visit will be conducted. The site visit will be held on Thursday, October 24, 2024, @ 1:00 p.m. The meeting location will be Building 20 (Guard Shack/Security).
Attendees are encouraged to arrive 15 minutes early to check in. If visitors do not possess a TYAD issued Contractor badge, they will be required to present a valid, Government issued photo I.D. to gain access to the base (vehicle registration and insurance may also be required). Attendees are encouraged complete ELTY 648-C, Dec 21 and forward completed ELTY 648-Cs to the POC listed below. Information provided at each site visit, as well as answers to any general questions, shall not affect the terms and conditions of the solicitation and/or specifications.
Terms remain unchanged unless the solicitation is amended in writing. The Contracting Officer Representative (COR) for this project is: Eric Wolfe, Phone: 570-615-3501; Email: eric.j.wolfe15.civ@army.mil Contact COR/POC to attend the site visit.
4. To receive an award, the company must have an active registration in the System for Award Management (SAM) https://www.SAM.gov with no active exclusions and have no debt subject to offset. Prospective offerors must be found to be responsible in accordance with FAR 9.1.
5. Parties interested in responding to this Request for Proposal (RFP) shall complete a standard form (SF) 1449 http://www.forms.gov, blocks 5, 12, 17a, 17b, 19 thru 24, 30a, and 30b; and 30c. The offer must be signed by a company official authorized to contractually bind the company.
6. BASIS FOR AWARD & EVALUATION CRITERIA: Award evaluation and basis for award will be performed in accordance with FAR 52.212-2, Evaluation-Commercial Items, located in the clause section of the solicitation.
Award will be Best Value to the Government using a Trade-off process for Technical, Past Performance and Price.
Offerors are cautioned that any award may not necessarily be made to the lowest offered price. Proposals shall be submitted, and award made by the Government on an all or none basis. Therefore, proposals are solicited on that basis only.
7. TYPE OF CONTRACT: Any resultant award will be a Hybrid contract with Firm-Fixed Price (FFP) and Time & Materials (T&M) Contract Line Items (CLINs). All approved unscheduled/emergency repair work will be invoiced against the T&M line item at the single, fully loaded labor rate, proposed in Attachment 1 – Proposed Pricing Sheet.
Any resultant award will be a single award only.
8. QUESTIONS: Offerors are advised to submit any questions regarding this Solicitation in writing as soon as practical, but no later than 28 October 2024 at 4:30 PM EST, to the contract specialist via email at jason.m.burke.civ@army.mil. Answers will be consolidated and posted to www.sam.gov only in the form of Questions and Answers or, if required, an Amendment to the Solicitation. Questions received after this time may not be answered.
9. PROPOSAL SUBMISSION: Proposal, along with all Proposal Requirements noted below, must be emailed to jason.m.burke.civ@army.mil by the closing date/time to be accepted.
Submission Document:
A. Contractor Proposal
B. Signed SF1449 (#5 above) C. Three (3) Past Performance References (FAR 52.212-2) D. All Signed Amendments if applicable E. Offeror’s submitted Proposed Pricing Sheet (Attachment 1)
10. Offerors shall prepare and submit their proposals and supporting documentation referencing Solicitation 51AA1- 25-Q-0005” via email to: jason.m.burke.civ@army.mil, in accordance with the submission requirements listed in Clause 52.212-1 Instructions to Offerors and Clause 52.212-2 Evaluation of Commercial Items. As stated therein, failure to follow the instructions may render the proposal non-responsive. The Government is not responsible for any proposal that was not received in the contract specialist’s email Inbox identified above by the time and date specified for receipt of offers, to include any type of firewall delays. Offerors are advised to transmit their complete proposal in enough time to ensure it is received in the contract specialist’s email Inbox identified above by the time and date specified for receipt of proposals. Proposals or parts of proposals received after the time and date specified for receipt of proposals will be considered Late.
11. Offerors shall not submit any assumptions, terms, conditions, caveats, or exceptions with proposals. All concerns shall be addressed and resolved by submitting questions by the date specified in this RFP. No assumptions, terms, conditions, caveats, or exceptions submitted with proposals in response to RFPs will be accepted or incorporated into the awarded contract.
12. Any amendments issued to this solicitation will be synopsized in the same manner as this solicitation. All offerors are advised to acknowledge all amendments issued to the solicitation with their proposal by signing and including one copy of the amendment with their proposal.
13. The Government is not responsible for any costs incurred for contractor’s time or materials expended in preparing a proposal for this solicitation.
14. The Offeror shall complete the pricing spreadsheet titled "Attachment 1 - Proposed Pricing Sheet". Pricing not submitted utilizing Attachment 1 – Proposed Pricing Sheet, may not be considered.
15. The minimum acceptable acceptance period for offers is ninety (90) days from the date specified in Block 8, on Page 1 of the SF1449.
16. Wage Rates can be found on the Service Contract Act side of WWW.SAM.GOV. The services to be performed fall under the authority of the service contract act unless otherwise exempt by the Contracting Officer. Department of Labor (DOL) Service Contract Act Wage Determination No: 2015-5797, Revision No.: 26, Dated: July 22, 2024 is provided at Attachment 2 to this solicitation.
17. DISCUSSIONS
The Government intends to award without discussions. Offerors should provide their best, complete proposal upon initial submission. The Government reserves the right to hold discussions with one or more offerors if deemed necessary by the Contracting Officer.
18. RFQ ATTACHMENTS:
The following documents are attached:
Attachment I - Proposed Pricing Sheet Attachment II - Service Contract Wage Rate Determination
508 COMPLIANCES:
Offeror must also meet the applicable accessibility standards at 36 CFR part 1194 per FAR 39.2, Section 508 of the Rehabilitation Act of 1973 (29 U.S.C. 794d) and the Architectural and Transportation Barriers Compliance Board Electronic and Information Technology (EIT) Accessibility Standards (36 CFR part 1194). Information may be found at the following websites:
Section 508. http://www.section508.gov Section 508 – Electronic and Information Technology. 21 December 2000, http://www.usdoj.gov/crt/508/508law.pdf
Desktop and Portable Computer (1194.26). 1 August 2001, http://www.accessboard. gov/sec508/guide/1194.26.html.
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
Elevated Burn System Simulator (EBSS)
Service Contract
Part 1 General Information
1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: This is a non-personal services contract to provide Preventative Maintenance, unscheduled and emergency repairs to all aspects and associated equipment comprising the Elevated Burn System Simulator (EBSS) in Building 3005, Tobyhanna, PA. The Contractor shall perform routine scheduled preventative maintenance as well as respond to unscheduled/emergency repair calls, when requested. A Contracting Officer’s Representative (COR) will be assigned for contractor’s main point of communication.
1.2 Background: This contract is a follow on to a previous contract that serviced the same equimpment. The previous contract started in 2021 and ended in 2024. Minimal changes have been made in the work required from the previous service contract. Also minimal changes in the EBSS equipment have been made since the last contract was written.
1.3 Scope: The contractor shall provide Preventative Maintenance, Annual Balancing and Binding of Contol Points as well as Unscheduled or Emergency Repairs on equipment identified in this PWS.
- Preventative Maintenance <Firm Fixed Price>
- Unscheduled/Emergency Maintenance <Time & Material>
1.4 Objectives: The objective of this contract is to provide preventative maintenance and emergency repair services described in this PWS in order to keep the EBSS and its equipment associated running to their optimal level as to minimize down-time.
1.5 General Information:
1.5.1 Quality Control Plan (QCP): The contractor’s existing quality assurance system shall be utilized in accordance with FAR 12.208. The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures that the work provided complies with the requirement of the contract.
The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within five (5) business days of contract award for approval. At any time, the contractor changes his quality control plan during the life of the contract, the contractor will submit a copy to the KO and COR for further approval.
1.5.1.1 The Contractor shall inform the COR of issues or potential issues that might affect the performance within 3 hours of identifying those issues. Verbal reports shall be followed up by written reports within 7 days
1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the
Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.
1.5.3.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in Jan Presidents Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th
1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.
1.5.4.1 Government Facility Office Hours: The Government facility office hours are open 0700 to 1700, on days Monday through Friday, except U.S. Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.5.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0600 to 1800, days Monday through Saturday. The Government facility is open for operations during the recognized U.S. Holidays identified in paragraph 1.5.3.1 above. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor.
1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0700 to 1700, days Monday through Friday. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor. The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.
1.5.4.3.1 Contractor Work Plan: The Contractor shall prepare and maintain a Work Plan. The plan, as a minimum, shall identify regularly scheduled work (to include location, work to be completed, timeline, etc.). If the need for overtime is anticipated, the Contractor must receive approval from the Contracting Officer at a minimum seven (7) calendar days prior to execution. The Contractor’s proposed Work Plan shall be submitted to the Contracting Officer via the COR for review within 7 days after date of contract award. The Government will review and either accept or return their comments to the Contractor within 10 days. The Contractor shall then have 3 days to submit a Final Work Plan. Any proposed change to the accepted Final Work Plan is required to be resubmitted via the COR for review and acceptance by the Contracting Officer at a minimum thirty (30) days prior to implementation. The timeline noted above shall apply for review and acceptance for proposed changes.
1.5.5 Training Holidays: N/A
1.5.6 Place of Performance: The work to be performed under this contract will be performed at Tobyhanna Army Depot, Building 3005.
1.6 Security Requirements: The following information is provided on security related matters.
1.6.1 Security Program: All contractor personnel and sub-contractors performing work under this contract must have a Local 648-C submitted at least 10 days prior to requiring access to the base, and must maintain the level of security required if they intend to come back on base at a later date. The security requirements are IAW with the DoD Contract Security Classification Specification (DD Form 254), which is currently accessible at the following link: http://www.dtic.mil/whs/directives/forms/eforms/dd0254.pdf The RA's unit security monitor is responsible for initiating this form.
1.6.2 Personnel Security Clearance Requirements: The security requirements are IAW the DoD Contract Security Classification Specification DD Form 254. The RA's unit security monitor is responsible for initiating this form. The Contractor shall ensure that Contractor employees and subcontractor employees performing services under this contract comply with FAR 52.204-2 Security Requirements when the employee has access to information classified “Confidential,” “Secret,” or “Top Secret.” The Contractor shall ensure the employee complies with the DoD Security Agreement (DD Form 441), and the NISPOM rule at 32 Code of Federal Regulation (CFR) Part 117, effective 24 Feb 2021. The NISPOM is the National Industrial Security Program Operating Manual to which contractors must implement and comply.
1.6.3 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings and controlled areas.
The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.
1.6.3.1 Installation Pass Log: In addition, the Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within 3 calendar days after contract award. The log must at a minimum contain the name and date of visit for each contractor personell. The log shall be updated as employees are added or removed.
The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) days after any changes to the log.
1.6.3.2 Individual Termination or Expiration of Employment: The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within 5 days.
1.6.3.3 Contract Termination or Cancellation: Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within 5 days.
1.6.3.4 Common Access Cards (CAC) and CAC Log: Contractor shall provide the following information: Last, First and Middle Names, government issued personal identifier (e.g. Social Security Number, Federal Identification Number, or Tax Identification Number), date of birth, primary email address (this email address will be used to contact the individual) and any other necessary information required to obtain a CAC or installation access card, to the COR with 10 days after award (unless circumstances require otherwise and as directed by the Contracting Officer). The Contractor shall ensure safeguarding of Personally Identifiable Information (PII) and comply with requirements under 1.22.5.
The Contractor shall provide a CAC log within the first 30 calendar days after contract award and within five (5) days after changes have been made (unless circumstances require otherwise and as directed by the Contracting Officer). The COR will provide format and content for the log during the post award meeting. Note - CACs are Government property and must be accounted for.
1.6.4 Background Checks: Background security approval shall remain in place throughout contract period of performance up to two years.
1.6.4.1 U.S. Citizen: The Requiring Activity Manager will determine the extent of background checks required.
The Contractor employee may begin performance of the contract after receiving a favorable local background check.
The Contractor agrees to replace the employee should results of the background check, if required, be unfavorable as determined by the Requiring Activity Manager. The Contractor’s replacement of the employee with the unfavorable background check shall be within a timeframe provided by the Requiring Activity Manager. The Contractor shall also replace employees whose background check, during their tenure of employment, renders them with an unfavorable local or stateside background check, as determined by the Requiring Activity Manager. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each favorable background check within 10 days of receipt by the Contractor, identifying such with the appropriate contract number. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each unfavorable background check within of receipt by the Contractor, identifying such with the appropriate contract number. When the Government awards a non-personal services contract directly to an individual, the failure of the individual to provide a favorable background check would be grounds for termination.
1.6.4.2 Local Nationals and Third Country Nationals: Local national and third country national Contractors that working under this contract are subject to background checks as determined by the Requiring Activity Manager. As a minimum prior to beginning performance, Contractors employing local national and third country nationals shall furnish the Contracting Officer via the COR and the Requiring Activity Manager current documents required for working on a US installation, no later than 5 days after cotracts award. Forwarding correspondence from the Contractors shall identify the associated contract number.
1.6.5 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13.”)
1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.
1.7 Key Control: The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Contractor’s Security Plan and the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any incidents of lost or duplicate keys to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from payment due to the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the payment due to the Contractor. The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees.
The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Quality Control Plan.
1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the
Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
These meetings shall be at no additional cost to the Government.
1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work.
The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
1.10 Key Personnel: N/A
1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.12.1 Contractor workspace (staging site, on-site office, desk or work area, etc.) shall contain a sign signifying the space is occupied by Contractor employee(s) to ensure that Government employees and the public know that they are not Government employees. The proposed sign shall be submitted to the Contracting Officer via the COR for review and acceptance within 10 calendar days after contract award. Workspace sign location shall be coordinated with the COR. Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting or attending meetings, and seminars. All Contractor correspondence (written, facsimile, and email display) shall include their company name. Requirements for Contractor vehicles is addressed under Part 4 paragraph 4.4.
1.12.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715). (For services at Child, Youth, and School Services where children are present, recommend personnel wear identification when children are present.) Contractor and sub contractor personell will be provided a with some form of identification with that will show that the they are allowed on base. Personell must have provided identification on display on their person at all times in a way that can be clearly seen. Companies with U.S. Government contracts will require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations. The Contractor shall collect all ID Badges upon completion of the contract or termination of employee. A listing of issued ID cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor personnel changes
1.13 Contractor Travel: The Contractor may be authorized travel expenses at rates no higher than the substantive provisions of the Joint Travel Regulation (JTR), IAW FAR Part 31.205-46, and the limitation of funds specified in this contract. All travel requires Government approval and authorization 10 days prior to scheduled travel.
1.14 Other Direct Costs (ODCs): Inclusion of ODCs must be preapproved by the Contracting Officer. This category includes travel (outlined in 1.13), printing and shipping expenses associated with training activities and visits to Contractor facilities. If there is uncertainty as to what counts as a ODCs consult the COR.
1.15 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights..
1.16 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel, shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
1.17 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/ , the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
1.18 Non-Disclosure Statements: NA
1.19 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.20 Phase In /Phase Out Period: NA
1.21 Safety: The following provides information pertaining to Safety and Accident Prevention:
Follow general radiation hazard safety procedures for the installation. Follow all posted signage and obey warning lights in and around the building if applicable (consult COR for any pre-service safety coordination).
Prior to soldering, welding, torch cutting, and all forms of burning and use of open flame the Contractor shall be responsible to obtain a Burn Permit from the TYAD Fire Department. The Contractor shall use safety screens that offer the required level of protection for the type of work being performed and to provide protection for all personnel in the surrounding area.
1.21.1 Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g. U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)).
The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:
(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel. Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.
(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1);
(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work;
(d) The Contractor shall discuss the plans in conferences convened by the Contracting Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within fifteen (15) calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than fifteen (15) calendar days prior to initiation of work on each major phase; and
(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:
(i) Short sleeve shirt;
(ii) Long trousers;
(iii) Steel-toed safety boots; and
(iv) Hard hat.
1.21.1.1 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes.
The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract.
1.21.1.2 The Contractor shall complete and provide safety notifications required and will provide documented proof to the Contracting Officer via the COR, no later than 7 days after that such notifications were made.
1.22 Environmental Compliance: The following provides information on Environmental Compliance.
1.22.1 Environmental Compliance Plan and Program:
1.22.1.1 Air Pollution Control
The contractor must control fugitive emissions, including dust, during their contract. The contractor must obtain approval from the Environmental Branch (EB) prior to exhausting equipment to the outside. The contractor must not allow any pollutant or particulate matter to be released to the atmosphere at levels that are visible from outside of
Tobyhanna Army Depot (TYAD). The contractor must not perform work that will release pollutants or particulate matter to the atmosphere when the wind speed exceeds ten miles per hour and will result in adverse effects to the surrounding areas. TYAD will monitor the wind speed; it is the contractor’s responsibility to obtain wind speed information through the Contracting Officer Representative (COR).
1.22.1.2 Asbestos
The contractor must ensure that all materials used in the performance of this contract are asbestos-free.
Unless specified in the contract, the contractor must not disturb any existing Asbestos-Containing Material (ACM) in the performance of this contract. If ACM, or suspect ACM might be disturbed in performance of this contract, the contractor must avoid coming in contact with the material and immediately notify the COR and the Contract Administrator in writing. The COR must coordinate with EB to have the material tested to determine if there is ACM. If the material is determined to be ACM and the contractor cannot avoid disturbing the material, the COR will notify the Contracting Officer. The Contracting Officer will direct a change pursuant to the contract clauses entitled “Changes” and “Differing Site Conditions.” If ACM, or suspect ACM has been disturbed, the contractor must immediately notify the COR and call the EB. The contractor will shut down and not move any equipment or supplies near the damaged ACM. The contractor will evacuate all non-contaminated contractor personnel from the immediate vicinity. Any contractor personnel thought to be contaminated with asbestos must remain in the area until the EB responds. If the damaged material is determined to be ACM and there is potential for further damage, the Contracting Officer will direct a change pursuant to the clauses of the contract clauses entitled “Changes” and “Differing Site Conditions.”
Asbestos abatement required under the contract as originally awarded must be in accordance with United Facilities Guide Specification 02 83 14 00 10 and as otherwise required in the contract. Asbestos abatement not required under the contract as originally awarded, can be incorporated into the existing contract via contract modification, or by the Government taking responsibility for the asbestos abatement.
The method of acquiring the abatement is at the discretion of the Government. The contractor must have an asbestos abatement work plan that has been approved by EB prior to beginning any asbestos abatement work.
1.22.1.3 Backflow
The contractor shall have a backflow prevention device installed on all contractor equipment that is connected to Tobyhanna Army Depot’s (TYAD) water distribution system. The contractor shall have a water meter installed to monitor water consumption during all phases of the contract. Water use will be reported monthly to the Environmental Branch.
1.22.1.4 Burning
The contractor must not burn refuse and debris anywhere on TYAD.
1.22.1.5 Buy Recycled-Content Materials
The Contractor must comply with Resource Conservation and Recovery Act (RCRA) Section 6002 (42 U.S.C. 6962, Federal Procurement) in the acquisition of materials with recycled content to meet the standards of Executive Order 13693, Planning for Federal Sustainability in the Next Decade; March 19, 2015. Specific designated items in this contract for which recycled content standards have been established have been set forth in the specification (e.g., insulation, roofing materials, carpet, carpet pad, paint, floor tiles, shower and restroom dividers). Recovered Material Certification: As required by the RCRA, the contractor must certify that the percentage of recovered materials to be used in the performance of the contract will be at least the amount required by the applicable contract specifications (see Federal Acquisition Regulation (FAR) Provision 52.223-4, Recovered Material Certification).
Prior to application for final payment, the contractor must provide a report in accordance with FAR Clause 52.223- 9, Estimate of Percentage of Recovered Material Content for Environmental Protection Agency (EPA) Designated Items, to the Contracting Office. Compliance with this program does not relieve the contractor from meeting all other specification requirements.
1.22.1.6 Cultural Resources
The contractor must not adversely affect any property listed on the National Register of Historic Places (NRHP) or properties eligible for inclusion on the NRHP without consultation and approval from the EB through the COR. If there is a discovery of any historic properties, including archeological sites and graveyards, work will cease immediately until requirements of National Historic Preservation Act, as amended, have been met. All archaeological artifacts found at TYAD, or TYAD-controlled properties are U. S. Government property until a determination is made otherwise.
1.22.1.7 Demolition Notification
If a project involves the demolition of any load-bearing structural members, whether or not asbestos is present, 25 days prior to the demolition, the Commonwealth of Pennsylvania Asbestos Abatement and Demolition/Renovation Notification Form 2700-FM-BAQ0021 must be submitted to EB as specified in the Unified Facilities Guide Specification 02 82 13.00 10. The contractor may obtain a copy of the form from the EB.
1.22.1.8 Drinking Water
The contractor must not perform any work on the TYAD potable water system prior to obtaining approval from the EB and the Installation Planning and Maintenance Division certified operator through the COR. If a permit is required due to construction or proposed chemical feed changes, it will be the responsibility of the contractor to obtain all permits associated with the project. Permit applications will first be reviewed and approved by the Environmental Branch before being submitted to regulatory authorities. Any piping or additions added to the TYAD water system must be disinfected following American Water Works Association circular C651-14 "Disinfecting Water Mains." Construction will be kept outside of drinking water wellhead protection zones when feasible. All new buildings and remodeled buildings will be equipped with a water meter that can easily be read from the exterior of the building.
1.22.1.9 Endangered Species
The contractor is responsible for meeting requirements of the Endangered Species Act of 1973. The contractor must not disturb any endangered species, their habitat or offspring during the implementation of this contract.
1.22.1.10 Emergency/Spills
All emergencies and spills must be reported to the TYAD Fire Department by calling 911 from a TYAD phone or
(570) 615-7300. If a 911 call is placed on a cell phone, the call will go to the Monroe County Emergency Office.
Notify the Monroe County Emergency Office that you are at TYAD, and the call will be forwarded to TYADs Fire Department. The contractor must ensure all personnel working on site are trained in the proper procedure according to 29 CFR 1910.120 (if applicable) to initiate a spill response to handle the hazardous substances they are working with. The contractor will take the necessary actions to prevent and contain spills of hazardous materials.
1.22.1.11 Energy Efficiency
The Energy Policy Act of 2005 section 109 and the Energy Independence and Security Act of 2007 require all new construction at federal facilities to be 30% better than ASHRAE 90.1. Energy Policy Act of 2005 section 104 and the Energy Independence and Security Act of 2007 require all new equipment to be Energy Star qualified when available. This is applicable to heating, ventilation and air conditioning equipment, plumbing, building materials, lighting, commercial food service equipment and appliances.
1.22.1.12 Environmental Automation and Control Systems
The contractor will not alter, modify, remove or tamper with any environmental automation or control system unless previous arrangements have been made with EB. This includes sensors, programmable logic controllers, equipment housing, power supplies, meters or other hardware/sensor technology.
1.22.1.13 Erosion and Sedimentation Control
The contractor shall protect streams, lakes and wetlands from sediment discharges caused by the contractor's activities. The contractor shall also provide (where applicable) an erosion and sedimentation control plan in compliance with state and local laws and regulations, to the COR for approval prior to executing any soil-disturbing activities.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .