Attachment 1 - Drawings - 2020_0826.pdf
PDF 14 MB Posted
- Solicitation number
- 36C25021B0002
About this file
This document provides details for a federal solicitation seeking construction services for a parking garage restoration project. The solicitation seeks a contractor to perform work including limited demolition, concrete, steel, and plumbing activities at the approximately 210,000 square foot parking garage at the Department of Veterans Affairs Medical Center in Cincinnati, Ohio. The estimated value of the construction project is between $250,000 and $500,000. Interested offerors may submit requests for the solicitation documents by November 19, 2020 at 12:00 PM EST. The solicitation is designated as a total small business set-aside issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. Upon award, the selected contractor must complete all work within 210 calendar days from notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI - Replys.pdf | ||
| 36C25021B0002 0001.docx | DOCX document | |
| Attachment 5 - DBA - OH20200082.pdf | ||
| 36C25021B0002_1.docx | DOCX document | |
| Attachment 4 - Request for Information Form.pdf | ||
| Attachment 3 - Safety and Environmental Record Evaluation Form.pdf | ||
| Attachment 2 - Specifications - 2020_0826.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
T A T
E OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2021
P ro je ct
N o
F
E
D
C
B
A
Department of Veterans Affairs Medical Center
LEVIN PORTER ASSOCIATES
ARCHITECTURE PLANNING INTERIOR DESIGN
3011 NEWMARK DRIVE
MIAMISBURG, OH 45342
937.224.1931 P
937.224.3091 F
THP LIMITED, INC
STRUCTURAL ENGINEERS
100 EAST EIGHTH ST. CINCINNATI, OHIO 45202
513.241.3222 P
513.241.2981 F
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
CONSTRUCTION
DOCUMENTS
SCHEMATIC DESIGN 05/25/20201
Chief Engineer
JASON REEVES
DESIGN DEVELOPMENT (DD1) 06/15/20202
DESIGN DEVELOPMENT (DD2) 07/06/20203
CONSTRUCTION DOCUMENTS 08/26/20204
3200 VINE STREET CINCINNATI, OH 45220
.0
TITLE SHEET
08/26/2020 VP SS
PARKING GARAGE RESTORATION
G001
539-21-209
Cincinnati, Ohio
P1
/2
/2
BLDG 16
BLDG 1
BLDG 2
CINCINNATI CAMPUS KEYPLAN
Scale: N.T.S.
GARAGE
VICINITY MAP
N.T.S.
NORTH
PARKING GARAGE RESTORATION
Sheet Number Sheet Name
01. GENERAL
G001 TITLE SHEET
G002 LIFE SAFETY PLAN
G003 PHASING PLANS
04. STRUCTURAL
101 LEVEL 1 PLAN
102 LEVEL 2 PLAN
103 LEVEL 3 PLAN
104 LEVEL 4 PLAN
105 LEVEL 5 PLAN
106 LEVEL 6 PLAN
201 REPAIR DETAILS
202 REPAIR DETAILS
203 REPAIR DETAILS
05. ARCHITECTURE
A301 STAIR 1 PLANS AND SECTIONS
A302 STAIR 2 PLANS AND SECTION
PARKING
GARAGE (P1)
SHEET INDEX
A. THE COR IS THE VA CONTRACTING OFFICER TECHNICAL REPRESENTATIVE.
B. ALL WORK WILL COMPLY WITH ALL APPLICABLE NATIONAL, STATE OR LOCAL CODES, ORDINANCES AND
REGULATIONS INCLUDING THE AMERICAN DISABILITIES ACT (ADA) AND THE AMERICAN NATIONAL STANDARDS
INSTITUTE (ANSI) GUIDELINES.
C. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE COR OF ANY WORK THAT MIGHT REQUIRE INTERRUPTION OF UTILITY SERVICES, CAUSE NOISE, OR CREATE VIBRATION PRIOR TO COMMENCEMENT OF THIS
WORK.
D. THE GENERAL CONTRACTOR SHALL COMPLY WITH ALL PROVISIONS OF THE SPECIFICATIONS INCLUDING ALL GENERAL CONDITIONS, SUPPLEMENTARY GENERAL CONDITIONS, MATERIAL AND CONSTRUCTION PROVISIONS
WHICH APPLY TO MATERIALS OR CONSTRUCTION METHODS REQUIRED.
E. DO NOT PAINT ANY SEALANTS OR CAULKING WHICH ARE SUBJECT TO MOVEMENT. CONTROL JOINTS SHALL BE CAULKED AFTER PAINTING AND SPECIAL COATING APPLICATIONS. PROVIDE CAULKING OR SEALANTS WHICH
MATCH ADJACENT FINISHED COLORS UNLESS NOTED OTHERWISE.
F. ALL EXISTING CONSTRUCTION TO REMAIN THAT ARE DAMAGED OR DISTURBED DURING CONSTRUCTION SHALL BE
PATCHED OR REPAIRED TO MATCH EXISTING ADJACENT CONSTRUCTION.
G. ALL SUSPENDED ITEMS SHALL BE ATTACHED DIRECTLY TO STRUCTURE AND NOT ANCHORED TO ANY NON-
STRUCTURAL ITEM, COMPONENT OR SYSTEM.
H. NEW CORE DRILLING THROUGH EXISTING STRUCTURAL ELEMENTS REQUIRED BY CONSTRUCTION SHALL BE COORDINATED BY THE CONTRACTOR TO AVOID DRILLING THROUGH OR INTO ANY STRUCTURAL ELEMENTS.
I. NEW CONSTRUCTION INSTALLED SHALL BE COORDINATED BY THE CONTRACTOR FOR PROPER FIT, DIMENSIONS AND ACCESS TO THE BUILDING PRIOR TO BEGINNING CONSTRUCTION AND DELIVERY OF COMPONENTS TO THE
SITE.
J. INTERIOR DIMENSIONS ARE TO FINISH FACE UNLESS NOTED OTHERWISE
K. CONTRACTOR'S BID SHALL INCLUDE THE GREATEST QUANTITY AND QUALITY OF ALL ITEMS AND ASSEMBLIES FOR
A COMPLETE AND FULLY OPERATIONAL PROJECT IN ACCORDANCE WITH THE VETERAN ADMINISTRATION'S
REQUIREMENTS
L. UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS, CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION, REMOVAL AND REPLACEMENT WORK SPECIFIED AND REQUIRED TO ACCOMMODATE THE REQUIRED IMPROVEMENTS, AND SHALL ALSO BE RESPONSIBLE FOR ANY AND ALL NECESSARY REPLACEMENT, REPAIRING, AND PATCHING. WORK TO BE DONE BY WORKMAN SKILLED AND REGULARLY EMPLOYED IN THE TRADES
INVOLVED.
M. CONTRACTOR SHALL PROPERLY PLAN AND EXECUTE ALL WORK. NO EXTRA COSTS FOR LACK OF PROPER
PLANNING AND EXECUTION SHALL BE CONSIDERED.
N. CONTRACTOR SHALL VERIFY AS-BUILT CONDITIONS FOR MATERIAL DIFFERENCES PRIOR TO PERFORMING ANY
WORK AND SHALL NOTIFY THE COR OF ANY DISCREPANCIES.
GENERAL PROJECT NOTES
# DESCRIPTION DATE
UP
UP
1 1.1 1.9 2 3 4 5 6 6.1 6.9 7'
C
B
A.3
A
MIN 1 ELEVATOR AS
ACCESSIBLE MEANS OF
EGRESS (NFPA 7.5.4.7)
ELEVATOR SHAFT TO
HAVE 2 HOUR FIRE RATING
EXIT TO GRADE STAIR #
1/ELEVATOR 32" MIN
CLEAR (NFPA 7.2.1.2.3.2)
DISTANCE TO ADJACENT
STRUCTURE >10'-0"
(NFPA 5.2.2) TYP.
MEANS OF EGRESS
STAIR #1 MIN. WIDTH
44" (NFPA TABLE
7.2.2.2.1.2(B))
FIRE EXTINGUISHER
CABINET
STORAGE USE
(149 OCCUPANTS)
(NFPA TABLE 7.3.1.2 W/IBC
2009-200 SQ. FT. PER PERSON)
FIRE EXTINGUISHER
CABINET
FIRE EXTINGUISHER
CABINET
FIRE
EXTINGUISHER
CABINET
MEANS OF EGRESS
STAIR #2 MIN. WIDTH
44" (NFPA TABLE
7.2.2.2.1.2(B))
EXIT TO GRADE STAIR #
1/ELEVATOR 32" MIN
CLEAR (NFPA 7.2.1.2.3.2)
OPENINGS ARE GREATER THAN 20% OF INTERIOR WALL
(NFPA48.8.13.3)
1 1.1 1.9 2 3 4 5 6 6.1 6.9 7'
C
B
A.3
A
STAIR 2
STAIR 1
11.1 1.92 3 4 5 66.1 6.97'
C
B
A.3
A
STAIR #1 STAIR #2
FIRE EXTINGUISHER
CABINET
FIRE EXTINGUISHER
CABINET
FIRE EXTINGUISHER
CABINET
STORAGE USE
(149 OCCUPANTS)
(NFPA TABLE 7.3.1.2 W/IBC
2009-200 SQ. FT. PER PERSON)
S
T A T
E OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2021
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
CONSTRUCTION
DOCUMENTS
SCHEMATIC DESIGN 05/25/20201
Chief Engineer
JASON REEVES
DESIGN DEVELOPMENT (DD1) 06/15/20202
DESIGN DEVELOPMENT (DD2) 07/06/20203
CONSTRUCTION DOCUMENTS 08/26/20204
.0
LIFE SAFETY PLAN
08/26/2020 VP SS
PARKING GARAGE RESTORATION
G002
539-21-209
Cincinnati, Ohio
P1
/2
/2
SCOPE OF WORK FOR THIS PROJECT WILL NOT CHANGE CODE
NFPA 101 2018 LIFE SAFETY CODE REVIEW:
CLASS I STANDPIPE REQUIRED IN ACCORDANCE WITH NFPA 88A 6.5.1
PARKING GARAGE IS AN OPEN STRUCTURE AND MEETS THE CRITERIA PER NFPA 42.8.1.3.1 & 42.8.1.3.2 AND
NFPA 88A - SECTION 5.5
BASEMENT = 823 S.F.
AREA PER FOOR = 35, 525 S.F.
6 FLOOR MAX. HEIGHT WITH PARTIAL BASEMENT AND ELEVATOR MACHINE ROOM.
BUILDING CLASSIFIED AS MIXED USE
- OPEN PARKING GARAGE/STORAGE
CHAPTER 8 - FIRE RATINGS:
8.3.4.2 ELEVATOR HOISTWAY - 2 HOURS
ELEVATOR MACHINE ROOM - 2 HOURS
CHAPTER 11 - SPECIAL STRUCTURES
11.2 OPEN STRUCTURES
11.2.2.3 OPEN STRUCTURES ARE EXEMPT FROM MINIMUM STAIR REQUIREMENTS. 44" MIN.
PROVIDED
11.2.2.4.1 OPEN STRUCTURES ARE EXEMPT FROM REQUIRING 2 EXITS. 2 EXITS ARE PROVIDED
11.2.2.6 OPEN STRUCTURES ARE EXEMPT FROM TRAVEL DISTANCES.
11.2.3.1 OPEN STRUCTURES ARE EXEMPT FROM PROTECTION OF VERTICAL OPENINGS
REQUIREMENTS.
11.2.3.2 OPEN STRUCTURES SHALL AUTOMATIC, MANUAL OR OTHER PROTECTION THAT IS
APPROPRIATE FOR HAZARD.
11.2.3.4 OPEN STRUCTURES SHALL BE EXEMPT FROM REQUIREMENTS FOR DETECTION,
ALARMS AND COMMUNICATION SYSTEMS.
CHAPTER 12 - STORAGE OCCUPANCIES (PARKING GARAGE)
(ORDINARY HAZARD FOR 6.2.2.3, 42.13.1.5)
42.4.1 TWO REMOTE MEANS OF EGRESS ARE REQUIRED.
EXCEPTION: BASEMENT ACCESS WILL BE LIMITED TO ONLY ELEVATOR ELECTRIC
MAINTENANCE UNTIL THE CONSTRUCTION OF THE FUTURE CONNECTOR CORRIDOR.
IBC (INTERNATIONAL BUILDING CODE)
311.3 LOW HAZARD STORAGE GROUP (S-2)
406.5 OPEN PARKING STRUCTURE PER DEFINITION
TABLE 406.5.4 2B CONSTRUCTION, 50,000 S.F. ALLOWABLE/8 TIER
TABLE 601 CONSTRUCTION TYPE 2B REQUIRES 0-HOUR RATINGS/NO SPRINKLER ON ALL
STRUCTURE, WALL & ROOF.
IBC CONSTRUCTION TYPE 2B = NFPA CONSTRUCTION TYPE 2 (000)
TABLE A.8.2.1.2 (NFPA 101) - TYPE 2 (000) = NO RATED STRUCTURE, WALL OR ROOF.
CODE ANALYSIS
NORTH
SCALE | 1/32" = 1'-0"
EXISTING LEVEL 1 - LIFE SAFETY PLAN1
SCALE | 1/32" = 1'-0"
EXISTING LEVEL 6 LIFE SAFETY PLAN3
NORTHNORTH
CAR COUNT
LEVEL
LEVEL 1
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
TOTAL
PARKING SPACES
HANDICAPP PARKING
UP
UP
1 1.1 1.9 2 3 4 5 6 6.1 6.9 7'
C
B
A.3
A
1 1.1 1.9 2 3 4 5 6 6.1 6.97'
C
B
A.3
A
11.1 1.92 3 4 5 66.1 6.97'
C
B
A.3
A
ENTIRE LEVEL TO BE CLOSE DURING PHASE A WORK
1 1.1 1.9 2 3 4 5 6 6.1 6.9 7'
C
B
A.3
A
1 1.1 1.9 2 3 4 5 6 6.1 6.9 7'
C
B
A.3
A
1 1.1 1.9 2 3 4 5 6 6.1 6.9 7'
C
B
A.3
A
S
T A T
E OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2021
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
CONSTRUCTION
DOCUMENTS
SCHEMATIC DESIGN 05/25/20201
Chief Engineer
JASON REEVES
DESIGN DEVELOPMENT (DD1) 06/15/20202
DESIGN DEVELOPMENT (DD2) 07/06/20203
CONSTRUCTION DOCUMENTS 08/26/20204
.0
PHASING PLANS
08/26/2020 VP SS
PARKING GARAGE RESTORATION
G003
539-21-209
Cincinnati, Ohio
P1
/2
/2
SCALE | 1/32" = 1'-0"
LEVEL 1 - PHASING PLAN6
SCALE | 1/32" = 1'-0"
LEVEL 3 - PHASING PLAN10SCALE | 1/32" = 1'-0"
LEVEL 6 - PHASING PLAN25
NORTH
NORTH
NORTH
SCALE | 1/32" = 1'-0"
LEVEL 2 - PHASING PLAN8
SCALE | 1/32" = 1'-0"
LEVEL 4 - PHASING PLAN21
SCALE | 1/32" = 1'-0"
LEVEL 5 - PHASING PLAN23
NORTH
NORTH
NORTH
EXISTING ELEVATORS
PHASING PLAN - GENERAL NOTES
A. THE PLANS ON THIS SHEET ARE SHOWN FOR DIAGRAMMATIC AND PHASING PURPOSE ONLY. IT
SHOULD NOT BE SCALED OR OTHERWISE USE FOR TAKE OFFS. THE SCOPE OF WORK IS MOST
ACCURATELY DETAILED IN THE ACCOMPANYING BID DOCUMENTS. IN THE EVENT THAT THERE
IS ANY AMBIGUITY OR CONFLICT BETWEEN THE SCOPE DESCRIBED IN THIS SHEET AND THE
SCOPE DETAILED IN THE ACCOMPANYING BID SET, THE BID SET SHALL GOVERN.
B. EXISTING PUBLIC MEANS OF EGRESS TO BE MAINTAINED THROUGHOUT PROJECT AT ALL TIMES.
C. MAINTAIN CONTINUOUS UNOBSTRUCTED ACCESS TO ALL GARAGE ENTRANCES/EXITS, STAIRS, ELEVATORS, AND OCCUPIED SPACES. WORK REQUIRING PARTIAL CLOSURE SHALL BE
COORDINATED IN ADVANCE WITH THE VA. PROVIDE PROFESSIONALLY PREPARED SIGNAGE
DIRECTING GARAGE PATRONS SAFELY THROUGH OR AROUND WORK AREAS.
D. PHASE WORK TO ACCOMMODATE CONTINUOUS TRAFFIC CIRCULATION. ERECT BARRICADES
AND PROVIDE PROFESSIONALLY PREPARED SIGNAGE DIRECTING TRAFFIC SAFELY THROUGH
OR AROUND WORK AREAS. AS REQUIRED TO PROTECT PERSONS AND PROPERTY, BLOCK OR
RESTRICT ACCESS AS NECESSARY TO AREAS DIRECTLY BELOW WORK AREAS. ALL PHASING
AND PROPOSED WORK AREAS SHALL BE REVIEWED AND APPROVED IN ADVANCE BY THE VA
CONTRACTING OFFICER TECHNICAL REPRESENTATIVE (COR). CONTRACTORS SHALL FOLLOW
THE CRITERIA BELOW WHEN DEVELOPING PHASING PLAN:
• MINIMUM DRIVE AISLE WIDTH = 12'-0"
• MINIMUM PEDESTRIAN WALKING AISLE = 6'-0"
• CLEAN, NEAT, LEGIBLE PROFESSIONALLY PREPARED SIGNAGE POSTED AND MAINTAINED AT
ALL TIMES.
• 4'-0" HIGH ORANGE CONSTRUCTION FENCE, SUPPORT AT DISTANCE TO SUFFICIENTLY
SUPPORT FENCES WITHOUT SAGGING OR 6'-0" HIGH SEGMENTED GALVANIZED STEEL
CONSTRUCTION FENCE WITH WEIGHTED SUPPORTS, STRUNG WITH DOUBLE ROW OF
CONSTRUCTION TAPE.
• MAXIMUM OF 100 PARKING SPACES CAN BE CLAIMED DURING DAYTIME WORKING HOURS,
200 SPACES CAN BE CLAIMED DURING NIGHT TIME HOURS.
E. CONTRACTOR SHALL PROTECT, AS NECESSARY, EXISTING SPRINKLER HEADS, DUCT WORK,
VIDEO AND SURVEILLANCE EQUIPMENT, MONITORY SYSTEMS, AND ALL EXISTING BUILDING
FEATURES TO REMAIN. DO NOT DAMAGE. CONTRACTOR SHALL REPAIR OR REPLACE DAMAGED
FEATURES (AS A RESULT OF INADEQUATE OR IMPROPER PROTECTION) TO THE SATISFACTION
OF THE PARKING GARAGE MANAGER.
F. PROTECT FLOOR DRAINS FORM DAMAGE AND DEBRIS DURING THE WORK. RESTORE EACH
DRAIN IN OR ADJACENT TO WORK AREAS TO FULLY FUNCTIONING CONDITION AFTER EACH
WORK DAY.
PHASE
EXISTING PEDESTRIAN EXIT
PHASE F2
STAIR #1
STAIR #2
STAIR
#1 STAIR
#2
PHASE E
PHASE F
STAIR
#1 STAIR
#2
PHASE D
STAIR
#1 STAIR
#2
PHASE A
STAIR
#1 STAIR
#2
PHASE B
STAIR
#1 STAIR
#2
PHASE C
PLAN
101 3/32" = 1'-0"
FIRST LEVEL
NORTH
1 1.1 1.9 2 3 4 5 6 6.1 6.9 7'
C
B
A.3
A
48'-0" 48'-0" 48'-0"48'-0" 48'-0" 48'-0"
'-0
'-0
RAMP UP
TO LEVEL 2
PLAN NOTES:
1. DRIVE LANES SHALL REMAIN OPEN TO TRAFFIC AT ALL TIMES. PHASE WORK AND PROVIDE BARRICADES AND SIGNAGE TO DIRECT TRAFFIC THROUGH OR AROUND WORK AREAS. COORDINATE ALL EFFORTS WITH OWNER IN
ADVANCE. REFER TO SPECIFICATION SECTIONS 011000.
2. STAIR TOWER. MAINTAIN CONTINUOUS UNOBSTRUCTED ACCESS TO STAIRWAYS. ALL WORK IN OR AROUND THE STAIRS SHALL BE PHASED OR CONTAINED TO ONE STAIR TOWER AT A TIME TO ALLOW CONTINUOUS USE OF STAIRWAYS AND MINIMIZE INCONVENIENCE WITHOUT COMPROMISING PATRON SAFETY. COORDINATE WITH
OWNER IN ADVANCE. REFER TO SPECIFICATION SECTION 011000.
3. PRIOR TO STARTING WORK, CONTRACTOR TO PERFORM VISUAL SURVEY OF THE SOFFITS AND OVERHEAD STRUCTURE OF ALL LEVELS TO IDENTIFY ANY LOOSE OVERHEAD CONCRETE. KNOCKDOWN ANY LOOSE MATERIAL ON A UNIT PRICE BASIS. REFER TO DETAIL 4 ON DRAWING 201. WALK WITH ENGINEER TO CONFIRM WHICH LOCATIONS SHOULD BE REPAIRED AS PART OF THE PROJECT. REPAIR ON A UNIT PRICE BASIS. REFER TO
DETAIL 3 ON DRAWING 201.
4. CONTRACTOR TO PERFORM VISUAL SURVEY OF PRECAST FLOOR SURFACES TO LOCATE, MARK, AND QUANTIFY SPALLED, HEAVED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE TOPPING SLAB.
CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASIS. REFER
TO DETAILS 1 & 2 ON DRAWING 201.
5. CONTRACTOR TO PERFORM CHAIN DRAG SURVEY OF CAST IN PLACE WASHES TO LOCATE, MARK, AND QUANTIFY SPALLED, HEAVED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE TOPPING SLAB.
CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASIS. REFER
TO DETAILS 1 & 2 ON DRAWING 201.
6. CONTRACTOR TO PERFORM VISUAL SURVEY OF VERTICAL SURFACES TO LOCATE, MARK, AND QUANTIFY SPALLED, HEAVED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE. CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASES. SIMILAR TO DETAIL 1 ON
DRAWING 201.
7. CONTRACTOR TO PERFORM A VISUAL SURVEY OF STAIR TOWER, TREADS, AND RISERS FOR SPALLED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE. CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASIS. REFER TO DETAIL 5 ON DRAWING 201.
8. CONTRACTOR TO VISUALLY REVIEW DRAINS FOR CORROSION. WHERE IDENTIFIED, CONFIRM LOCATIONS WITH ENGINEER AND REPLACE ON A UNIT PRICE BASIS. REFER TO DETAILS 5 & 6 ON DRAWING 202.
9. REMOVE EXISTING SEALANTS IN THEIR ENTIRETY IN ALL CAST-IN-PLACE AREAS (WASHES AND CROSS OVER POURSTRIPS) . PREPARE SURFACES AND INSTALL NEW URETHANE SEALANTS. REFER TO DETAILS 2, 3 & 4 ON
DRAWING 202.
10. CONTRACTOR TO PERFORM A COMPLETE VISUAL SURVEY OF ALL FLOOR SURFACES TO LOCATE, MARK AND QUANTIFY CRACKING. CONFIRM LOCATIONS AND QUANTITIES WITH OWNER, ROUTE AND SEAL JOINT CRACKS
WITH NEW URETHANE SEALANT ON A UNIT PRICE BASIS PER DETAIL 1 ON DRAWING 202.
11. WHERE IDENTIFIED ON DRAWINGS, REMOVE EXISTING TEE-TO-TEE SEALANTS IN THEIR ENTIRETY AND PROVIDE
NEW URETHANE SEALANTS. REFER TO DETAILS 2 & 3 ON DRAWING 202.
12. ON INTERIOR LEVELS 2, 3 AND 4, CONTRACTOR TO PERFORM A LEAK SURVEY DURING A RAIN EVENT. LOCATE AND MARK LEAKING TEE-TO-TEE JOINTS. CONFIRM LOCATION AND QUANTITY WITH ENGINEER AND REPAIR ON A UNIT PRICE BASIS (12 FULL JOINT REPLACEMENTS). REFER TO DETAILS 2 & 3 ON DRAWING 202.
13. IN CONJUNCTION WITH THE TEE-TO-TEE JOINT SEALANT REPLACEMENT, CONTRACTOR TO INSPECT EXISTING TEE JOINT SHEAR CONNECTORS FOR BROKEN CONNECTIONS. CONFIRM REPAIR NEEDS WITH ENGINEER BEFORE FABRICATING THE LOAD TRANSFER ANGLES. PROVIDE NEW ANGLES ON A UNIT PRICE BASIS AS DIRECTED BY
THE OWNER. REFER TO DETAIL 5 ON DRAWING 201.
14. AT THE PENTHOUSE METAL PAN STAIRS, PROVIDE COVE SEALANT AT ALL TREAD TO RISER VERTICAL
PROJECTIONS. REFER TO DETAIL 2 ON DRAWING 202.
15. EXISTING HEAVILY WORN MEMBRANE SYSTEM OVER OCCUPIED SPACE. REMOVE ANY LOOSE OR DEBONDED MEMBRANE, PREPARE SURFACE AND PROVIDE NEW TYPE C HEAVY DUTY VEHICULAR TRAFFIC MEMBRANE
RECOAT SYSTEM. REFER TO DETAILS ON DRAWING 202.
16. WHERE IDENTIFIED, PREPARE SURFACES AND INSTALL NEW HEAVY DUTY VEHICULAR TRAFFIC MEMBRANE SYSTEM. INSTALL TRAFFIC MEMBRANE 6" PAST EDGE OF WASH ONTO ADJACENT TOPPING SLAB. REFER TO
DETAIL 4 ON DRAWING 203 AND SPECIFICATION SECTION 071800.
17. KNOWN LOCATION OF RUTTS IN CONCRETE FINISH. IN CONJUNCTION WITH THE HEAVY DUTY MEMBRANE INSTALLATION, LEVEL DEPRESSION WITH EPOXY AND SAND PRIOR TO MEMBRANE INSTALLATION. REFER TO
SPECIFICATION SECTION 071800.
18. APPROXIMATE LOCATION OF TEE FLANGE CORNER CRACK. CONTRACTOR TO WALK GARAGE WITH ENGINEER TO CONFIRM INSTALLATION LOCATIONS PRIOR TO ORDERING ANGLES. REFER TO DETAILS 6 & 7 ON DRAWING 201.
19. KNOWN LOCATION OF EXISTING FAILED EXPANSION JOINT. REMOVE EXISTING JOINT AND INSTALL NEW COMPRESSIBLE EXPANSION JOINT. SAW CUT AND ESTABLISH NEW BLOCKOUT ON THE SLAB ON GRADE SIDE, AND FORM THE BLOCKOUT DURING THE TOPPING SLAB REPAIRS ON THE STRUCTURED SIDE. REFER TO DETAIL 6
ON DRAWING 202.
20. KNOWN LOCATION OF EXISTING FAILED VERTICAL EXPANSION JOINT. REMOVE ALL COMPONENTS OF EXISTING EXPANSION JOINT AND REPLACE WITH NEW VERTICAL COMPRESSION SEAL. REFER TO DETAIL 7 ON DRAWING 202.
21. REMOVE EXISTING FACADE SEALANTS IN THEIR ENTIRETY. PREPARE SURFACES AND INSTALL NEW SILICONE
SEALANT. SIMILAR TO DETAIL 3A ON DRAWING 202.
22. AT ALL STAIR TOWER RAILINGS, PREPARE SURFACES TO SSPC-SP6 CONDITION AND INSTALL NEW HIGH
PERFORMANCE PAINT SYSTEM. REFER TO SPECIFICATION SECTION 099100.
23. AFTER SUFFICIENT CURE TIME, PREPARE SURFACES AND INSTALL NEW SILICONE COVE SEALANT AT ALL
BOLLARD AND RAILING BASE PLATES. REFER TO DETAIL 2 ON DRAWING 202.
24. KNOWN LOCATION OF CRACK IN TOPPING SLAB. ROUT CRACK, PREPARE SURFACES, AND INSTALL NEW
URETHANE SEALANT. REFER TO DETAIL 1 ON DRAWING 202.
25. KNOWN LOCATION OF DISPLACED BEARING PAD. RESET BEARING PAD. SHORE TEE STEMS DIRECTLY ADJACENT TO THE REPAIR LOCATION AND THE CORRESPONDING STEMS ONE LEVEL BELOW. PROVIDE (6) 25K POST SHORES, (3) PER LEVEL. CONFIRM SHORING LOCATION AND LAYOUT WITH ENGINEER PRIOR TO BEGINNING
REPAIR.
26. AFTER ALL WORK IS COMPLETE, PROVIDE NEW LINE STRIPING ON LEVELS 5 & 6 AS WELL AS DRIVELANE
DIRECTIONAL ARROWS ON ALL LEVELS. REFER TO SPECIFICATION SECTION 321723.
97. DEDUCT ALTERNATE NO. 1: ON INTERIOR LEVELS 2, 3 AND 4, CONTRACTOR TO PERFORM A LEAK SURVEY DURING A RAIN EVENT. LOCATE AND MARK LEAKING TEE-TO-TEE JOINTS. CONFIRM LOCATION AND QUANTITY WITH ENGINEER AND REPAIR ON A UNIT PRICE BASIS (36 FULL JOINT REPLACEMENTS). REFER TO DETAILS 2 & 3
ON DRAWING 202.
98. DEDUCT ALTERNATE NO. 2: WHERE IDENTIFIED ON LEVEL 5, REMOVE ALL LEVEL 5 MEMBRANE INSTALLATIONS
ON CAST IN PLACE WASHES.
99. DEDUCT ALTERNATE NO. 3: WHERE IDENTIFIED ON LEVEL 5, DELETE THE LUMP SUM TEE-TO-TEE JOINT SEALANT
REPLACEMENTS IDENTIFIED AS PART OF NOTE 11.
LEGEND
EXISTING FLOOR DRAIN.
EXISTING BOLLARD TO BE REPLACED.
EXISTING EXPANSION JOINT
EXISTING EXPANSION JOINT TO BE REPLACED
EXISTING TEE-TO-TEE JOINT
EXISTING FAILED TEE-TO-TEE JOINT SEALANT
EXISTING CAST-IN-PLACE WASH/POUR STRIP.
NEW HEAVY DUTY MEMBRANE SYSTEM.
NEW HEAVY DUTY MEMBRANE RECOAT SYSTEM
DEDUCT ALTERNATE NO. 2: LEVEL 5 MEMBRANE TO BE REMOVED. 98
72TYP.
7 22 23 TYP.
22 23
23TYP.23 TYP.
21TYP.
21TYP.
P r o j e c t
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231 321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Cincinnati V.A.
Medical Center U.S. Department of Veterans
Affairs
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
Chief Engineer
JASON REEVES
539-21-209
08/26/2020 BW/VP JH/SP
Cincinnati, Ohio
FULLY SPRINKLERED
CONSTRUCTION
DOCUMENTS
PARKING GARAGE
RESTORATION
P1
SCHEMATIC DESIGN 05/25/2020
# DESCRIPTION DATE
DESIGN DEVELOPMENT (DD1) 06/15/2020
DESIGN DEVELOPMENT (DD2)
07/06/2020
CONSTRUCTION DOCUMENTS4 08/26/2020
LEVEL 1 PLAN
102 3/32" = 1'-0"
SECOND LEVEL
NORTH
1 1.1 1.9 2 3 4 5 6 6.1 6.9 7'
C
B
A.3
A
48'-0" 48'-0" 48'-0"48'-0" 48'-0" 48'-0"
'-0
'-0
RAMP UP
TO LEVEL 3
RAMP DOWN
TO LEVEL 1
11 15
5 KNOWN DETERIORATION
'-0
'-0
15'-0"3'-0"
7 KNOWN LOCATION
(~5 SF)
PLAN NOTES:
1. DRIVE LANES SHALL REMAIN OPEN TO TRAFFIC AT ALL TIMES. PHASE WORK AND PROVIDE BARRICADES AND SIGNAGE TO DIRECT TRAFFIC THROUGH OR AROUND WORK AREAS. COORDINATE ALL EFFORTS WITH OWNER IN
ADVANCE. REFER TO SPECIFICATION SECTIONS 011000.
2. STAIR TOWER. MAINTAIN CONTINUOUS UNOBSTRUCTED ACCESS TO STAIRWAYS. ALL WORK IN OR AROUND THE STAIRS SHALL BE PHASED OR CONTAINED TO ONE STAIR TOWER AT A TIME TO ALLOW CONTINUOUS USE OF STAIRWAYS AND MINIMIZE INCONVENIENCE WITHOUT COMPROMISING PATRON SAFETY. COORDINATE WITH
OWNER IN ADVANCE. REFER TO SPECIFICATION SECTION 011000.
3. PRIOR TO STARTING WORK, CONTRACTOR TO PERFORM VISUAL SURVEY OF THE SOFFITS AND OVERHEAD STRUCTURE OF ALL LEVELS TO IDENTIFY ANY LOOSE OVERHEAD CONCRETE. KNOCKDOWN ANY LOOSE MATERIAL ON A UNIT PRICE BASIS. REFER TO DETAIL 4 ON DRAWING 201. WALK WITH ENGINEER TO CONFIRM WHICH LOCATIONS SHOULD BE REPAIRED AS PART OF THE PROJECT. REPAIR ON A UNIT PRICE BASIS. REFER TO
DETAIL 3 ON DRAWING 201.
4. CONTRACTOR TO PERFORM VISUAL SURVEY OF PRECAST FLOOR SURFACES TO LOCATE, MARK, AND QUANTIFY SPALLED, HEAVED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE TOPPING SLAB.
CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASIS. REFER
TO DETAILS 1 & 2 ON DRAWING 201.
5. CONTRACTOR TO PERFORM CHAIN DRAG SURVEY OF CAST IN PLACE WASHES TO LOCATE, MARK, AND QUANTIFY SPALLED, HEAVED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE TOPPING SLAB.
CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASIS. REFER
TO DETAILS 1 & 2 ON DRAWING 201.
6. CONTRACTOR TO PERFORM VISUAL SURVEY OF VERTICAL SURFACES TO LOCATE, MARK, AND QUANTIFY SPALLED, HEAVED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE. CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASES. SIMILAR TO DETAIL 1 ON
DRAWING 201.
7. CONTRACTOR TO PERFORM A VISUAL SURVEY OF STAIR TOWER, TREADS, AND RISERS FOR SPALLED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE. CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASIS. REFER TO DETAIL 5 ON DRAWING 201.
8. CONTRACTOR TO VISUALLY REVIEW DRAINS FOR CORROSION. WHERE IDENTIFIED, CONFIRM LOCATIONS WITH ENGINEER AND REPLACE ON A UNIT PRICE BASIS. REFER TO DETAILS 5 & 6 ON DRAWING 202.
9. REMOVE EXISTING SEALANTS IN THEIR ENTIRETY IN ALL CAST-IN-PLACE AREAS (WASHES AND CROSS OVER POURSTRIPS) . PREPARE SURFACES AND INSTALL NEW URETHANE SEALANTS. REFER TO DETAILS 2, 3 & 4 ON
DRAWING 202.
10. CONTRACTOR TO PERFORM A COMPLETE VISUAL SURVEY OF ALL FLOOR SURFACES TO LOCATE, MARK AND QUANTIFY CRACKING. CONFIRM LOCATIONS AND QUANTITIES WITH OWNER, ROUTE AND SEAL JOINT CRACKS
WITH NEW URETHANE SEALANT ON A UNIT PRICE BASIS PER DETAIL 1 ON DRAWING 202.
11. WHERE IDENTIFIED ON DRAWINGS, REMOVE EXISTING TEE-TO-TEE SEALANTS IN THEIR ENTIRETY AND PROVIDE
NEW URETHANE SEALANTS. REFER TO DETAILS 2 & 3 ON DRAWING 202.
12. ON INTERIOR LEVELS 2, 3 AND 4, CONTRACTOR TO PERFORM A LEAK SURVEY DURING A RAIN EVENT. LOCATE AND MARK LEAKING TEE-TO-TEE JOINTS. CONFIRM LOCATION AND QUANTITY WITH ENGINEER AND REPAIR ON A UNIT PRICE BASIS (12 FULL JOINT REPLACEMENTS). REFER TO DETAILS 2 & 3 ON DRAWING 202.
13. IN CONJUNCTION WITH THE TEE-TO-TEE JOINT SEALANT REPLACEMENT, CONTRACTOR TO INSPECT EXISTING TEE JOINT SHEAR CONNECTORS FOR BROKEN CONNECTIONS. CONFIRM REPAIR NEEDS WITH ENGINEER BEFORE FABRICATING THE LOAD TRANSFER ANGLES. PROVIDE NEW ANGLES ON A UNIT PRICE BASIS AS DIRECTED BY
THE OWNER. REFER TO DETAIL 5 ON DRAWING 201.
14. AT THE PENTHOUSE METAL PAN STAIRS, PROVIDE COVE SEALANT AT ALL TREAD TO RISER VERTICAL
PROJECTIONS. REFER TO DETAIL 2 ON DRAWING 202.
15. EXISTING HEAVILY WORN MEMBRANE SYSTEM OVER OCCUPIED SPACE. REMOVE ANY LOOSE OR DEBONDED MEMBRANE, PREPARE SURFACE AND PROVIDE NEW TYPE C HEAVY DUTY VEHICULAR TRAFFIC MEMBRANE
RECOAT SYSTEM. REFER TO DETAILS ON DRAWING 202.
16. WHERE IDENTIFIED, PREPARE SURFACES AND INSTALL NEW HEAVY DUTY VEHICULAR TRAFFIC MEMBRANE SYSTEM. INSTALL TRAFFIC MEMBRANE 6" PAST EDGE OF WASH ONTO ADJACENT TOPPING SLAB. REFER TO
DETAIL 4 ON DRAWING 203 AND SPECIFICATION SECTION 071800.
17. KNOWN LOCATION OF RUTTS IN CONCRETE FINISH. IN CONJUNCTION WITH THE HEAVY DUTY MEMBRANE INSTALLATION, LEVEL DEPRESSION WITH EPOXY AND SAND PRIOR TO MEMBRANE INSTALLATION. REFER TO
SPECIFICATION SECTION 071800.
18. APPROXIMATE LOCATION OF TEE FLANGE CORNER CRACK. CONTRACTOR TO WALK GARAGE WITH ENGINEER TO CONFIRM INSTALLATION LOCATIONS PRIOR TO ORDERING ANGLES. REFER TO DETAILS 6 & 7 ON DRAWING 201.
19. KNOWN LOCATION OF EXISTING FAILED EXPANSION JOINT. REMOVE EXISTING JOINT AND INSTALL NEW COMPRESSIBLE EXPANSION JOINT. SAW CUT AND ESTABLISH NEW BLOCKOUT ON THE SLAB ON GRADE SIDE, AND FORM THE BLOCKOUT DURING THE TOPPING SLAB REPAIRS ON THE STRUCTURED SIDE. REFER TO DETAIL 6
ON DRAWING 202.
20. KNOWN LOCATION OF EXISTING FAILED VERTICAL EXPANSION JOINT. REMOVE ALL COMPONENTS OF EXISTING EXPANSION JOINT AND REPLACE WITH NEW VERTICAL COMPRESSION SEAL. REFER TO DETAIL 7 ON DRAWING 202.
21. REMOVE EXISTING FACADE SEALANTS IN THEIR ENTIRETY. PREPARE SURFACES AND INSTALL NEW SILICONE
SEALANT. SIMILAR TO DETAIL 3A ON DRAWING 202.
22. AT ALL STAIR TOWER RAILINGS, PREPARE SURFACES TO SSPC-SP6 CONDITION AND INSTALL NEW HIGH
PERFORMANCE PAINT SYSTEM. REFER TO SPECIFICATION SECTION 099100.
23. AFTER SUFFICIENT CURE TIME, PREPARE SURFACES AND INSTALL NEW SILICONE COVE SEALANT AT ALL
BOLLARD AND RAILING BASE PLATES. REFER TO DETAIL 2 ON DRAWING 202.
24. KNOWN LOCATION OF CRACK IN TOPPING SLAB. ROUT CRACK, PREPARE SURFACES, AND INSTALL NEW
URETHANE SEALANT. REFER TO DETAIL 1 ON DRAWING 202.
25. KNOWN LOCATION OF DISPLACED BEARING PAD. RESET BEARING PAD. SHORE TEE STEMS DIRECTLY ADJACENT TO THE REPAIR LOCATION AND THE CORRESPONDING STEMS ONE LEVEL BELOW. PROVIDE (6) 25K POST SHORES, (3) PER LEVEL. CONFIRM SHORING LOCATION AND LAYOUT WITH ENGINEER PRIOR TO BEGINNING
REPAIR.
26. AFTER ALL WORK IS COMPLETE, PROVIDE NEW LINE STRIPING ON LEVELS 5 & 6 AS WELL AS DRIVELANE
DIRECTIONAL ARROWS ON ALL LEVELS. REFER TO SPECIFICATION SECTION 321723.
97. DEDUCT ALTERNATE NO. 1: ON INTERIOR LEVELS 2, 3 AND 4, CONTRACTOR TO PERFORM A LEAK SURVEY DURING A RAIN EVENT. LOCATE AND MARK LEAKING TEE-TO-TEE JOINTS. CONFIRM LOCATION AND QUANTITY WITH ENGINEER AND REPAIR ON A UNIT PRICE BASIS (36 FULL JOINT REPLACEMENTS). REFER TO DETAILS 2 & 3
ON DRAWING 202.
98. DEDUCT ALTERNATE NO. 2: WHERE IDENTIFIED ON LEVEL 5, REMOVE ALL LEVEL 5 MEMBRANE INSTALLATIONS
ON CAST IN PLACE WASHES.
99. DEDUCT ALTERNATE NO. 3: WHERE IDENTIFIED ON LEVEL 5, DELETE THE LUMP SUM TEE-TO-TEE JOINT SEALANT
REPLACEMENTS IDENTIFIED AS PART OF NOTE 11.
LEGEND
EXISTING FLOOR DRAIN.
EXISTING BOLLARD TO BE REPLACED.
EXISTING EXPANSION JOINT
EXISTING EXPANSION JOINT TO BE REPLACED
EXISTING TEE-TO-TEE JOINT
EXISTING FAILED TEE-TO-TEE JOINT SEALANT
EXISTING CAST-IN-PLACE WASH/POUR STRIP.
NEW HEAVY DUTY MEMBRANE SYSTEM.
NEW HEAVY DUTY MEMBRANE RECOAT SYSTEM
DEDUCT ALTERNATE NO. 2: LEVEL 5 MEMBRANE TO BE REMOVED. 98
BELOW
9'- 1"
T
YP
9'- 1"
T
YP
PLAN NOTES:
1. DRIVE LANES SHALL REMAIN OPEN TO TRAFFIC AT ALL TIMES. PHASE WORK AND PROVIDE BARRICADES AND SIGNAGE TO DIRECT TRAFFIC THROUGH OR AROUND WORK AREAS. COORDINATE ALL EFFORTS WITH OWNER IN
ADVANCE. REFER TO SPECIFICATION SECTIONS 011000.
2. STAIR TOWER. MAINTAIN CONTINUOUS UNOBSTRUCTED ACCESS TO STAIRWAYS. ALL WORK IN OR AROUND THE STAIRS SHALL BE PHASED OR CONTAINED TO ONE STAIR TOWER AT A TIME TO ALLOW CONTINUOUS USE OF STAIRWAYS AND MINIMIZE INCONVENIENCE WITHOUT COMPROMISING PATRON SAFETY. COORDINATE WITH
OWNER IN ADVANCE. REFER TO SPECIFICATION SECTION 011000.
3. PRIOR TO STARTING WORK, CONTRACTOR TO PERFORM VISUAL SURVEY OF THE SOFFITS AND OVERHEAD STRUCTURE OF ALL LEVELS TO IDENTIFY ANY LOOSE OVERHEAD CONCRETE. KNOCKDOWN ANY LOOSE MATERIAL ON A UNIT PRICE BASIS. REFER TO DETAIL 4 ON DRAWING 201. WALK WITH ENGINEER TO CONFIRM WHICH LOCATIONS SHOULD BE REPAIRED AS PART OF THE PROJECT. REPAIR ON A UNIT PRICE BASIS. REFER TO
DETAIL 3 ON DRAWING 201.
4. CONTRACTOR TO PERFORM VISUAL SURVEY OF PRECAST FLOOR SURFACES TO LOCATE, MARK, AND QUANTIFY SPALLED, HEAVED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE TOPPING SLAB.
CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASIS. REFER
TO DETAILS 1 & 2 ON DRAWING 201.
5. CONTRACTOR TO PERFORM CHAIN DRAG SURVEY OF CAST IN PLACE WASHES TO LOCATE, MARK, AND QUANTIFY SPALLED, HEAVED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE TOPPING SLAB.
CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASIS. REFER
TO DETAILS 1 & 2 ON DRAWING 201.
6. CONTRACTOR TO PERFORM VISUAL SURVEY OF VERTICAL SURFACES TO LOCATE, MARK, AND QUANTIFY SPALLED, HEAVED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE. CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASES. SIMILAR TO DETAIL 1 ON
DRAWING 201.
7. CONTRACTOR TO PERFORM A VISUAL SURVEY OF STAIR TOWER, TREADS, AND RISERS FOR SPALLED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE. CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASIS. REFER TO DETAIL 5 ON DRAWING 201.
8. CONTRACTOR TO VISUALLY REVIEW DRAINS FOR CORROSION. WHERE IDENTIFIED, CONFIRM LOCATIONS WITH ENGINEER AND REPLACE ON A UNIT PRICE BASIS. REFER TO DETAILS 5 & 6 ON DRAWING 202.
9. REMOVE EXISTING SEALANTS IN THEIR ENTIRETY IN ALL CAST-IN-PLACE AREAS (WASHES AND CROSS OVER POURSTRIPS) . PREPARE SURFACES AND INSTALL NEW URETHANE SEALANTS. REFER TO DETAILS 2, 3 & 4 ON
DRAWING 202.
10. CONTRACTOR TO PERFORM A COMPLETE VISUAL SURVEY OF ALL FLOOR SURFACES TO LOCATE, MARK AND QUANTIFY CRACKING. CONFIRM LOCATIONS AND QUANTITIES WITH OWNER, ROUTE AND SEAL JOINT CRACKS
WITH NEW URETHANE SEALANT ON A UNIT PRICE BASIS PER DETAIL 1 ON DRAWING 202.
11. WHERE IDENTIFIED ON DRAWINGS, REMOVE EXISTING TEE-TO-TEE SEALANTS IN THEIR ENTIRETY AND PROVIDE
NEW URETHANE SEALANTS. REFER TO DETAILS 2 & 3 ON DRAWING 202.
12. ON INTERIOR LEVELS 2, 3 AND 4, CONTRACTOR TO PERFORM A LEAK SURVEY DURING A RAIN EVENT. LOCATE AND MARK LEAKING TEE-TO-TEE JOINTS. CONFIRM LOCATION AND QUANTITY WITH ENGINEER AND REPAIR ON A UNIT PRICE BASIS (12 FULL JOINT REPLACEMENTS). REFER TO DETAILS 2 & 3 ON DRAWING 202.
13. IN CONJUNCTION WITH THE TEE-TO-TEE JOINT SEALANT REPLACEMENT, CONTRACTOR TO INSPECT EXISTING TEE JOINT SHEAR CONNECTORS FOR BROKEN CONNECTIONS. CONFIRM REPAIR NEEDS WITH ENGINEER BEFORE FABRICATING THE LOAD TRANSFER ANGLES. PROVIDE NEW ANGLES ON A UNIT PRICE BASIS AS DIRECTED BY
THE OWNER. REFER TO DETAIL 5 ON DRAWING 201.
14. AT THE PENTHOUSE METAL PAN STAIRS, PROVIDE COVE SEALANT AT ALL TREAD TO RISER VERTICAL
PROJECTIONS. REFER TO DETAIL 2 ON DRAWING 202.
15. EXISTING HEAVILY WORN MEMBRANE SYSTEM OVER OCCUPIED SPACE. REMOVE ANY LOOSE OR DEBONDED MEMBRANE, PREPARE SURFACE AND PROVIDE NEW TYPE C HEAVY DUTY VEHICULAR TRAFFIC MEMBRANE
RECOAT SYSTEM. REFER TO DETAILS ON DRAWING 202.
16. WHERE IDENTIFIED, PREPARE SURFACES AND INSTALL NEW HEAVY DUTY VEHICULAR TRAFFIC MEMBRANE SYSTEM. INSTALL TRAFFIC MEMBRANE 6" PAST EDGE OF WASH ONTO ADJACENT TOPPING SLAB. REFER TO
DETAIL 4 ON DRAWING 203 AND SPECIFICATION SECTION 071800.
17. KNOWN LOCATION OF RUTTS IN CONCRETE FINISH. IN CONJUNCTION WITH THE HEAVY DUTY MEMBRANE INSTALLATION, LEVEL DEPRESSION WITH EPOXY AND SAND PRIOR TO MEMBRANE INSTALLATION. REFER TO
SPECIFICATION SECTION 071800.
18. APPROXIMATE LOCATION OF TEE FLANGE CORNER CRACK. CONTRACTOR TO WALK GARAGE WITH ENGINEER TO CONFIRM INSTALLATION LOCATIONS PRIOR TO ORDERING ANGLES. REFER TO DETAILS 6 & 7 ON DRAWING 201.
19. KNOWN LOCATION OF EXISTING FAILED EXPANSION JOINT. REMOVE EXISTING JOINT AND INSTALL NEW COMPRESSIBLE EXPANSION JOINT. SAW CUT AND ESTABLISH NEW BLOCKOUT ON THE SLAB ON GRADE SIDE, AND FORM THE BLOCKOUT DURING THE TOPPING SLAB REPAIRS ON THE STRUCTURED SIDE. REFER TO DETAIL 6
ON DRAWING 202.
20. KNOWN LOCATION OF EXISTING FAILED VERTICAL EXPANSION JOINT. REMOVE ALL COMPONENTS OF EXISTING EXPANSION JOINT AND REPLACE WITH NEW VERTICAL COMPRESSION SEAL. REFER TO DETAIL 7 ON DRAWING 202.
21. REMOVE EXISTING FACADE SEALANTS IN THEIR ENTIRETY. PREPARE SURFACES AND INSTALL NEW SILICONE
SEALANT. SIMILAR TO DETAIL 3A ON DRAWING 202.
22. AT ALL STAIR TOWER RAILINGS, PREPARE SURFACES TO SSPC-SP6 CONDITION AND INSTALL NEW HIGH
PERFORMANCE PAINT SYSTEM. REFER TO SPECIFICATION SECTION 099100.
23. AFTER SUFFICIENT CURE TIME, PREPARE SURFACES AND INSTALL NEW SILICONE COVE SEALANT AT ALL
BOLLARD AND RAILING BASE PLATES. REFER TO DETAIL 2 ON DRAWING 202.
24. KNOWN LOCATION OF CRACK IN TOPPING SLAB. ROUT CRACK, PREPARE SURFACES, AND INSTALL NEW
URETHANE SEALANT. REFER TO DETAIL 1 ON DRAWING 202.
25. KNOWN LOCATION OF DISPLACED BEARING PAD. RESET BEARING PAD. SHORE TEE STEMS DIRECTLY ADJACENT TO THE REPAIR LOCATION AND THE CORRESPONDING STEMS ONE LEVEL BELOW. PROVIDE (6) 25K POST SHORES, (3) PER LEVEL. CONFIRM SHORING LOCATION AND LAYOUT WITH ENGINEER PRIOR TO BEGINNING
REPAIR.
26. AFTER ALL WORK IS COMPLETE, PROVIDE NEW LINE STRIPING ON LEVELS 5 & 6 AS WELL AS DRIVELANE
DIRECTIONAL ARROWS ON ALL LEVELS. REFER TO SPECIFICATION SECTION 321723.
97. DEDUCT ALTERNATE NO. 1: ON INTERIOR LEVELS 2, 3 AND 4, CONTRACTOR TO PERFORM A LEAK SURVEY DURING A RAIN EVENT. LOCATE AND MARK LEAKING TEE-TO-TEE JOINTS. CONFIRM LOCATION AND QUANTITY WITH ENGINEER AND REPAIR ON A UNIT PRICE BASIS (36 FULL JOINT REPLACEMENTS). REFER TO DETAILS 2 & 3
ON DRAWING 202.
98. DEDUCT ALTERNATE NO. 2: WHERE IDENTIFIED ON LEVEL 5, REMOVE ALL LEVEL 5 MEMBRANE INSTALLATIONS
ON CAST IN PLACE WASHES.
99. DEDUCT ALTERNATE NO. 3: WHERE IDENTIFIED ON LEVEL 5, DELETE THE LUMP SUM TEE-TO-TEE JOINT SEALANT
REPLACEMENTS IDENTIFIED AS PART OF NOTE 11.
LEGEND
EXISTING FLOOR DRAIN.
EXISTING BOLLARD TO BE REPLACED.
EXISTING EXPANSION JOINT
EXISTING EXPANSION JOINT TO BE REPLACED
EXISTING TEE-TO-TEE JOINT
EXISTING FAILED TEE-TO-TEE JOINT SEALANT
EXISTING CAST-IN-PLACE WASH/POUR STRIP.
NEW HEAVY DUTY MEMBRANE SYSTEM.
NEW HEAVY DUTY MEMBRANE RECOAT SYSTEM
DEDUCT ALTERNATE NO. 2: LEVEL 5 MEMBRANE TO BE REMOVED. 98
SLAB ON GRADE STRUCTURED SLAB
72TYP.
9 TYP.
9 TYP.9 TYP.
9 TYP.
9 TYP.
9 TYP.
16 TYP.16 TYP.
21TYP.
21TYP.
22 23 TYP.
22 23
23TYP.23 TYP.
TYP.
12 13 97
TYP.
12 13 97 43
TYP.
12 13 97
P r o j e c t
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231 321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Cincinnati V.A.
Medical Center U.S. Department of Veterans
Affairs
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
Chief Engineer
JASON REEVES
539-21-209
08/26/2020 BW/VP JH/SP
Cincinnati, Ohio
FULLY SPRINKLERED
CONSTRUCTION
DOCUMENTS
PARKING GARAGE
RESTORATION
P1
SCHEMATIC DESIGN 05/25/2020
# DESCRIPTION DATE
DESIGN DEVELOPMENT (DD1) 06/15/2020
DESIGN DEVELOPMENT (DD2)
07/06/2020
CONSTRUCTION DOCUMENTS4 08/26/2020
LEVEL 2 PLAN
103 3/32" = 1'-0"
THIRD LEVEL
NORTH
1 1.1 1.9 2 3 4 5 6 6.1 6.9 7'
C
B
A.3
A
48'-0" 48'-0" 48'-0"48'-0" 48'-0" 48'-0"
'-0
'-0
RAMP UP
TO LEVEL 4
RAMP DOWN
TO LEVEL 2
5 KNOWN LOCATION
(~2 SF)
5 KNOWN LOCATION
(~4 SF TOTAL)
PLAN NOTES:
1. DRIVE LANES SHALL REMAIN OPEN TO TRAFFIC AT ALL TIMES. PHASE WORK AND PROVIDE BARRICADES AND SIGNAGE TO DIRECT TRAFFIC THROUGH OR AROUND WORK AREAS. COORDINATE ALL EFFORTS WITH OWNER IN
ADVANCE. REFER TO SPECIFICATION SECTIONS 011000.
2. STAIR TOWER. MAINTAIN CONTINUOUS UNOBSTRUCTED ACCESS TO STAIRWAYS. ALL WORK IN OR AROUND THE STAIRS SHALL BE PHASED OR CONTAINED TO ONE STAIR TOWER AT A TIME TO ALLOW CONTINUOUS USE OF STAIRWAYS AND MINIMIZE INCONVENIENCE WITHOUT COMPROMISING PATRON SAFETY. COORDINATE WITH
OWNER IN ADVANCE. REFER TO SPECIFICATION SECTION 011000.
3. PRIOR TO STARTING WORK, CONTRACTOR TO PERFORM VISUAL SURVEY OF THE SOFFITS AND OVERHEAD STRUCTURE OF ALL LEVELS TO IDENTIFY ANY LOOSE OVERHEAD CONCRETE. KNOCKDOWN ANY LOOSE MATERIAL ON A UNIT PRICE BASIS. REFER TO DETAIL 4 ON DRAWING 201. WALK WITH ENGINEER TO CONFIRM WHICH LOCATIONS SHOULD BE REPAIRED AS PART OF THE PROJECT. REPAIR ON A UNIT PRICE BASIS. REFER TO
DETAIL 3 ON DRAWING 201.
4. CONTRACTOR TO PERFORM VISUAL SURVEY OF PRECAST FLOOR SURFACES TO LOCATE, MARK, AND QUANTIFY SPALLED, HEAVED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE TOPPING SLAB.
CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASIS. REFER
TO DETAILS 1 & 2 ON DRAWING 201.
5. CONTRACTOR TO PERFORM CHAIN DRAG SURVEY OF CAST IN PLACE WASHES TO LOCATE, MARK, AND QUANTIFY SPALLED, HEAVED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE TOPPING SLAB.
CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASIS. REFER
TO DETAILS 1 & 2 ON DRAWING 201.
6. CONTRACTOR TO PERFORM VISUAL SURVEY OF VERTICAL SURFACES TO LOCATE, MARK, AND QUANTIFY SPALLED, HEAVED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE. CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASES. SIMILAR TO DETAIL 1 ON
DRAWING 201.
7. CONTRACTOR TO PERFORM A VISUAL SURVEY OF STAIR TOWER, TREADS, AND RISERS FOR SPALLED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE. CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASIS. REFER TO DETAIL 5 ON DRAWING 201.
8. CONTRACTOR TO VISUALLY REVIEW DRAINS FOR CORROSION. WHERE IDENTIFIED, CONFIRM LOCATIONS WITH ENGINEER AND REPLACE ON A UNIT PRICE BASIS. REFER TO DETAILS 5 & 6 ON DRAWING 202.
9. REMOVE EXISTING SEALANTS IN THEIR ENTIRETY IN ALL CAST-IN-PLACE AREAS (WASHES AND CROSS OVER POURSTRIPS) . PREPARE SURFACES AND INSTALL NEW URETHANE SEALANTS. REFER TO DETAILS 2, 3 & 4 ON
DRAWING 202.
10. CONTRACTOR TO PERFORM A COMPLETE VISUAL SURVEY OF ALL FLOOR SURFACES TO LOCATE, MARK AND QUANTIFY CRACKING. CONFIRM LOCATIONS AND QUANTITIES WITH OWNER, ROUTE AND SEAL JOINT CRACKS
WITH NEW URETHANE SEALANT ON A UNIT PRICE BASIS PER DETAIL 1 ON DRAWING 202.
11. WHERE IDENTIFIED ON DRAWINGS, REMOVE EXISTING TEE-TO-TEE SEALANTS IN THEIR ENTIRETY AND PROVIDE
NEW URETHANE SEALANTS. REFER TO DETAILS 2 & 3 ON DRAWING 202.
12. ON INTERIOR LEVELS 2, 3 AND 4, CONTRACTOR TO PERFORM A LEAK SURVEY DURING A RAIN EVENT. LOCATE AND MARK LEAKING TEE-TO-TEE JOINTS. CONFIRM LOCATION AND QUANTITY WITH ENGINEER AND REPAIR ON A UNIT PRICE BASIS (12 FULL JOINT REPLACEMENTS). REFER TO DETAILS 2 & 3 ON DRAWING 202.
13. IN CONJUNCTION WITH THE TEE-TO-TEE JOINT SEALANT REPLACEMENT, CONTRACTOR TO INSPECT EXISTING TEE JOINT SHEAR CONNECTORS FOR BROKEN CONNECTIONS. CONFIRM REPAIR NEEDS WITH ENGINEER BEFORE FABRICATING THE LOAD TRANSFER ANGLES. PROVIDE NEW ANGLES ON A UNIT PRICE BASIS AS DIRECTED BY
THE OWNER. REFER TO DETAIL 5 ON DRAWING 201.
14. AT THE PENTHOUSE METAL PAN STAIRS, PROVIDE COVE SEALANT AT ALL TREAD TO RISER VERTICAL
PROJECTIONS. REFER TO DETAIL 2 ON DRAWING 202.
15. EXISTING HEAVILY WORN MEMBRANE SYSTEM OVER OCCUPIED SPACE. REMOVE ANY LOOSE OR DEBONDED MEMBRANE, PREPARE SURFACE AND PROVIDE NEW TYPE C HEAVY DUTY VEHICULAR TRAFFIC MEMBRANE
RECOAT SYSTEM. REFER TO DETAILS ON DRAWING 202.
16. WHERE IDENTIFIED, PREPARE SURFACES AND INSTALL NEW HEAVY DUTY VEHICULAR TRAFFIC MEMBRANE SYSTEM. INSTALL TRAFFIC MEMBRANE 6" PAST EDGE OF WASH ONTO ADJACENT TOPPING SLAB. REFER TO
DETAIL 4 ON DRAWING 203 AND SPECIFICATION SECTION 071800.
17. KNOWN LOCATION OF RUTTS IN CONCRETE FINISH. IN CONJUNCTION WITH THE HEAVY DUTY MEMBRANE INSTALLATION, LEVEL DEPRESSION WITH EPOXY AND SAND PRIOR TO MEMBRANE INSTALLATION. REFER TO
SPECIFICATION SECTION 071800.
18. APPROXIMATE LOCATION OF TEE FLANGE CORNER CRACK. CONTRACTOR TO WALK GARAGE WITH ENGINEER TO CONFIRM INSTALLATION LOCATIONS PRIOR TO ORDERING ANGLES. REFER TO DETAILS 6 & 7 ON DRAWING 201.
19. KNOWN LOCATION OF EXISTING FAILED EXPANSION JOINT. REMOVE EXISTING JOINT AND INSTALL NEW COMPRESSIBLE EXPANSION JOINT. SAW CUT AND ESTABLISH NEW BLOCKOUT ON THE SLAB ON GRADE SIDE, AND FORM THE BLOCKOUT DURING THE TOPPING SLAB REPAIRS ON THE STRUCTURED SIDE. REFER TO DETAIL 6
ON DRAWING 202.
20. KNOWN LOCATION OF EXISTING FAILED VERTICAL EXPANSION JOINT. REMOVE ALL COMPONENTS OF EXISTING EXPANSION JOINT AND REPLACE WITH NEW VERTICAL COMPRESSION SEAL. REFER TO DETAIL 7 ON DRAWING 202.
21. REMOVE EXISTING FACADE SEALANTS IN THEIR ENTIRETY. PREPARE SURFACES AND INSTALL NEW SILICONE
SEALANT. SIMILAR TO DETAIL 3A ON DRAWING 202.
22. AT ALL STAIR TOWER RAILINGS, PREPARE SURFACES TO SSPC-SP6 CONDITION AND INSTALL NEW HIGH
PERFORMANCE PAINT SYSTEM. REFER TO SPECIFICATION SECTION 099100.
23. AFTER SUFFICIENT CURE TIME, PREPARE SURFACES AND INSTALL NEW SILICONE COVE SEALANT AT ALL
BOLLARD AND RAILING BASE PLATES. REFER TO DETAIL 2 ON DRAWING 202.
24. KNOWN LOCATION OF CRACK IN TOPPING SLAB. ROUT CRACK, PREPARE SURFACES, AND INSTALL NEW
URETHANE SEALANT. REFER TO DETAIL 1 ON DRAWING 202.
25. KNOWN LOCATION OF DISPLACED BEARING PAD. RESET BEARING PAD. SHORE TEE STEMS DIRECTLY ADJACENT TO THE REPAIR LOCATION AND THE CORRESPONDING STEMS ONE LEVEL BELOW. PROVIDE (6) 25K POST SHORES, (3) PER LEVEL. CONFIRM SHORING LOCATION AND LAYOUT WITH ENGINEER PRIOR TO BEGINNING
REPAIR.
26. AFTER ALL WORK IS COMPLETE, PROVIDE NEW LINE STRIPING ON LEVELS 5 & 6 AS WELL AS DRIVELANE
DIRECTIONAL ARROWS ON ALL LEVELS. REFER TO SPECIFICATION SECTION 321723.
97. DEDUCT ALTERNATE NO. 1: ON INTERIOR LEVELS 2, 3 AND 4, CONTRACTOR TO PERFORM A LEAK SURVEY DURING A RAIN EVENT. LOCATE AND MARK LEAKING TEE-TO-TEE JOINTS. CONFIRM LOCATION AND QUANTITY WITH ENGINEER AND REPAIR ON A UNIT PRICE BASIS (36 FULL JOINT REPLACEMENTS). REFER TO DETAILS 2 & 3
ON DRAWING 202.
98. DEDUCT ALTERNATE NO. 2: WHERE IDENTIFIED ON LEVEL 5, REMOVE ALL LEVEL 5 MEMBRANE INSTALLATIONS
ON CAST IN PLACE WASHES.
99. DEDUCT ALTERNATE NO. 3: WHERE IDENTIFIED ON LEVEL 5, DELETE THE LUMP SUM TEE-TO-TEE JOINT SEALANT
REPLACEMENTS IDENTIFIED AS PART OF NOTE 11.
LEGEND
EXISTING FLOOR DRAIN.
EXISTING BOLLARD TO BE REPLACED.
EXISTING EXPANSION JOINT
EXISTING EXPANSION JOINT TO BE REPLACED
EXISTING TEE-TO-TEE JOINT
EXISTING FAILED TEE-TO-TEE JOINT SEALANT
EXISTING CAST-IN-PLACE WASH/POUR STRIP.
NEW HEAVY DUTY MEMBRANE SYSTEM.
NEW HEAVY DUTY MEMBRANE RECOAT SYSTEM
DEDUCT ALTERNATE NO. 2: LEVEL 5 MEMBRANE TO BE REMOVED. 98
9'- 1"
T
YP
9'- 1"
T
YP
6" BEYOND JOINT TYP.
9 TYP.
9 TYP.9 TYP.
9 TYP.
9 TYP.
9 TYP.
16 TYP.16 TYP.
72TYP.
7 22 23 TYP.
22 23
23TYP.23 TYP.
21TYP.
21TYP.
TYP.
12 13 97
TYP.
12 13 97 43
TYP.
12 13 97
P r o j e c t
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231 321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Cincinnati V.A.
Medical Center U.S. Department of Veterans
Affairs
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
Chief Engineer
JASON REEVES
539-21-209
08/26/2020 BW/VP JH/SP
Cincinnati, Ohio
FULLY SPRINKLERED
CONSTRUCTION
DOCUMENTS
PARKING GARAGE
RESTORATION
P1
SCHEMATIC DESIGN 05/25/2020
# DESCRIPTION DATE
DESIGN DEVELOPMENT (DD1) 06/15/2020
DESIGN DEVELOPMENT (DD2)
07/06/2020
CONSTRUCTION DOCUMENTS4 08/26/2020
LEVEL 3 PLAN
104 3/32" = 1'-0"
FOURTH LEVEL
NORTH
PLAN NOTES:
1. DRIVE LANES SHALL REMAIN OPEN TO TRAFFIC AT ALL TIMES. PHASE WORK AND PROVIDE BARRICADES AND SIGNAGE TO DIRECT TRAFFIC THROUGH OR AROUND WORK AREAS. COORDINATE ALL EFFORTS WITH OWNER IN
ADVANCE. REFER TO SPECIFICATION SECTIONS 011000.
2. STAIR TOWER. MAINTAIN CONTINUOUS UNOBSTRUCTED ACCESS TO STAIRWAYS. ALL WORK IN OR AROUND THE STAIRS SHALL BE PHASED OR CONTAINED TO ONE STAIR TOWER AT A TIME TO ALLOW CONTINUOUS USE OF STAIRWAYS AND MINIMIZE INCONVENIENCE WITHOUT COMPROMISING PATRON SAFETY. COORDINATE WITH
OWNER IN ADVANCE. REFER TO SPECIFICATION SECTION 011000.
3. PRIOR TO STARTING WORK, CONTRACTOR TO PERFORM VISUAL SURVEY OF THE SOFFITS AND OVERHEAD STRUCTURE OF ALL LEVELS TO IDENTIFY ANY LOOSE OVERHEAD CONCRETE. KNOCKDOWN ANY LOOSE MATERIAL ON A UNIT PRICE BASIS. REFER TO DETAIL 4 ON DRAWING 201. WALK WITH ENGINEER TO CONFIRM WHICH LOCATIONS SHOULD BE REPAIRED AS PART OF THE PROJECT. REPAIR ON A UNIT PRICE BASIS. REFER TO
DETAIL 3 ON DRAWING 201.
4. CONTRACTOR TO PERFORM VISUAL SURVEY OF PRECAST FLOOR SURFACES TO LOCATE, MARK, AND QUANTIFY SPALLED, HEAVED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE TOPPING SLAB.
CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASIS. REFER
TO DETAILS 1 & 2 ON DRAWING 201.
5. CONTRACTOR TO PERFORM CHAIN DRAG SURVEY OF CAST IN PLACE WASHES TO LOCATE, MARK, AND QUANTIFY SPALLED, HEAVED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE TOPPING SLAB.
CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASIS. REFER
TO DETAILS 1 & 2 ON DRAWING 201.
6. CONTRACTOR TO PERFORM VISUAL SURVEY OF VERTICAL SURFACES TO LOCATE, MARK, AND QUANTIFY SPALLED, HEAVED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE. CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASES. SIMILAR TO DETAIL 1 ON
DRAWING 201.
7. CONTRACTOR TO PERFORM A VISUAL SURVEY OF STAIR TOWER, TREADS, AND RISERS FOR SPALLED, DELAMINATED, DEBONDED, OR OTHERWISE DETERIORATED CONCRETE. CONFIRM LOCATIONS AND QUANTITIES WITH ENGINEER AND PERFORM REPAIRS ON A UNIT PRICE BASIS. REFER TO DETAIL 5 ON DRAWING 201.
8. CONTRACTOR TO VISUALLY REVIEW DRAINS FOR CORROSION. WHERE IDENTIFIED, CONFIRM LOCATIONS WITH ENGINEER AND REPLACE ON A UNIT PRICE BASIS. REFER TO DETAILS 5 & 6 ON DRAWING 202.
9. REMOVE EXISTING SEALANTS IN THEIR ENTIRETY IN ALL CAST-IN-PLACE AREAS (WASHES AND CROSS OVER POURSTRIPS) . PREPARE SURFACES AND INSTALL NEW URETHANE SEALANTS. REFER TO DETAILS 2, 3 & 4 ON
DRAWING 202.
10. CONTRACTOR TO PERFORM A COMPLETE VISUAL SURVEY OF ALL FLOOR SURFACES TO LOCATE, MARK AND QUANTIFY CRACKING. CONFIRM LOCATIONS AND QUANTITIES WITH OWNER, ROUTE AND SEAL JOINT CRACKS
WITH NEW URETHANE SEALANT ON A UNIT PRICE BASIS PER DETAIL 1 ON DRAWING 202.
11. WHERE IDENTIFIED ON DRAWINGS, REMOVE EXISTING TEE-TO-TEE SEALANTS IN THEIR ENTIRETY AND PROVIDE
NEW URETHANE SEALANTS. REFER TO DETAILS 2 & 3 ON DRAWING 202.
12. ON INTERIOR LEVELS 2, 3 AND 4, CONTRACTOR TO PERFORM A LEAK SURVEY DURING A RAIN EVENT. LOCATE AND MARK LEAKING TEE-TO-TEE JOINTS. CONFIRM LOCATION AND QUANTITY WITH ENGINEER AND REPAIR ON A UNIT PRICE BASIS (12 FULL JOINT REPLACEMENTS). REFER TO DETAILS 2 & 3 ON DRAWING 202.
13. IN CONJUNCTION WITH THE TEE-TO-TEE JOINT SEALANT REPLACEMENT, CONTRACTOR TO INSPECT EXISTING TEE JOINT SHEAR CONNECTORS FOR BROKEN CONNECTIONS. CONFIRM REPAIR NEEDS WITH ENGINEER BEFORE FABRICATING THE LOAD TRANSFER ANGLES. PROVIDE NEW ANGLES ON A UNIT PRICE BASIS AS DIRECTED BY
THE OWNER. REFER TO DETAIL 5 ON DRAWING 201.
14. AT THE PENTHOUSE METAL PAN STAIRS, PROVIDE COVE SEALANT AT ALL TREAD TO RISER VERTICAL
PROJECTIONS. REFER TO DETAIL 2 ON DRAWING 202.
15. EXISTING HEAVILY WORN MEMBRANE SYSTEM OVER OCCUPIED SPACE. REMOVE ANY LOOSE OR DEBONDED MEMBRANE, PREPARE SURFACE AND PROVIDE NEW TYPE C HEAVY DUTY VEHICULAR TRAFFIC MEMBRANE
RECOAT SYSTEM. REFER TO DETAILS ON DRAWING 202.
16. WHERE IDENTIFIED, PREPARE SURFACES AND INSTALL NEW HEAVY DUTY VEHICULAR TRAFFIC MEMBRANE SYSTEM. INSTALL TRAFFIC MEMBRANE 6" PAST EDGE OF WASH ONTO ADJACENT TOPPING SLAB. REFER TO
DETAIL 4 ON DRAWING 203 AND SPECIFICATION SECTION 071800.
17. KNOWN LOCATION OF RUTTS IN CONCRETE FINISH. IN CONJUNCTION WITH THE HEAVY DUTY MEMBRANE INSTALLATION, LEVEL DEPRESSION WITH EPOXY AND SAND PRIOR TO MEMBRANE INSTALLATION. REFER TO
SPECIFICATION SECTION 071800.
18. APPROXIMATE LOCATION OF TEE FLANGE CORNER CRACK. CONTRACTOR TO WALK GARAGE WITH ENGINEER TO CONFIRM INSTALLATION LOCATIONS PRIOR TO ORDERING ANGLES. REFER TO DETAILS 6 & 7 ON DRAWING 201.
19. KNOWN LOCATION OF EXISTING FAILED EXPANSION JOINT. REMOVE EXISTING JOINT AND INSTALL NEW COMPRESSIBLE EXPANSION JOINT. SAW CUT AND ESTABLISH NEW BLOCKOUT ON THE SLAB ON GRADE SIDE, AND FORM THE BLOCKOUT DURING THE TOPPING SLAB REPAIRS ON THE STRUCTURED SIDE. REFER TO DETAIL 6
ON DRAWING 202.
20. KNOWN LOCATION OF EXISTING FAILED VERTICAL EXPANSION JOINT. REMOVE ALL COMPONENTS OF EXISTING EXPANSION JOINT AND REPLACE WITH NEW VERTICAL COMPRESSION SEAL. REFER TO DETAIL 7 ON DRAWING 202.
21. REMOVE EXISTING FACADE SEALANTS IN THEIR ENTIRETY. PREPARE SURFACES AND INSTALL NEW SILICONE
SEALANT. SIMILAR TO DETAIL 3A ON DRAWING 202.
22. AT ALL STAIR TOWER RAILINGS, PREPARE SURFACES TO SSPC-SP6 CONDITION AND INSTALL NEW HIGH
PERFORMANCE PAINT SYSTEM. REFER TO SPECIFICATION SECTION 099100.
23. AFTER SUFFICIENT CURE TIME, PREPARE SURFACES AND INSTALL NEW SILICONE COVE SEALANT AT ALL
BOLLARD AND RAILING BASE PLATES. REFER TO DETAIL 2 ON DRAWING 202.
24. KNOWN LOCATION OF CRACK IN TOPPING SLAB. ROUT CRACK, PREPARE SURFACES, AND INSTALL NEW
URETHANE SEALANT. REFER TO DETAIL 1 ON DRAWING 202.
25. KNOWN LOCATION OF DISPLACED BEARING PAD. RESET BEARING PAD. SHORE TEE STEMS DIRECTLY ADJACENT TO THE REPAIR LOCATION AND THE CORRESPONDING STEMS ONE LEVEL BELOW. PROVIDE (6) 25K POST SHORES, (3) PER LEVEL. CONFIRM SHORING LOCATION AND LAYOUT WITH ENGINEER PRIOR TO BEGINNING
REPAIR.
26. AFTER ALL WORK IS COMPLETE, PROVIDE NEW LINE STRIPING ON LEVELS 5 & 6 AS WELL AS DRIVELANE
DIRECTIONAL ARROWS ON ALL LEVELS. REFER TO SPECIFICATION SECTION 321723.
97. DEDUCT ALTERNATE NO. 1: ON INTERIOR LEVELS 2, 3 AND 4, CONTRACTOR TO PERFORM A LEAK SURVEY DURING A RAIN EVENT. LOCATE AND MARK LEAKING TEE-TO-TEE JOINTS. CONFIRM LOCATION AND QUANTITY WITH ENGINEER AND REPAIR ON A UNIT PRICE BASIS (36 FULL JOINT REPLACEMENTS). REFER TO DETAILS 2 & 3
ON DRAWING 202.
98. DEDUCT ALTERNATE NO. 2: WHERE IDENTIFIED ON LEVEL 5, REMOVE ALL LEVEL 5 MEMBRANE INSTALLATIONS
ON CAST IN PLACE WASHES.
99. DEDUCT ALTERNATE NO. 3: WHERE IDENTIFIED ON LEVEL 5, DELETE THE LUMP SUM TEE-TO-TEE JOINT SEALANT
REPLACEMENTS IDENTIFIED AS PART OF NOTE 11.
LEGEND
EXISTING FLOOR DRAIN.
EXISTING BOLLARD TO BE REPLACED.
EXISTING EXPANSION JOINT
EXISTING EXPANSION JOINT TO BE REPLACED
EXISTING TEE-TO-TEE JOINT
EXISTING FAILED TEE-TO-TEE JOINT SEALANT
EXISTING CAST-IN-PLACE WASH/POUR STRIP.
NEW HEAVY…