Attachment 1 - Draft Specifications.pdf

PDF 243 KB Posted

Attached to
5G Cellular Base Station (BRAND NAME Nokia)
Solicitation number
NB675010-26-01753
Issued by

About this file

This is a Requirements/Specification Document for a federal procurement of a 5G cellular base station system by NIST's Communications Technology Laboratory, Spectrum Technology and Research Division.

The procurement requires a single outdoor Nokia 5G C-band Next-Generation NodeB (gNB) base station to modernize NIST's measurement and antenna calibration methodologies. The system comprises three line items: (1) a Radio Access Network base station with a 5G outdoor baseband unit (2 x 100 MHz mMIMO with GPS and ACOC), a 5G n77 mMIMO outdoor 64T64R unit (1 x 100 MHz, 320W, 16 layers), and 5G main software with value packs; (2) RAN CARES Bronze technical support services for one year annualized across the base period and two option periods; and (3) Nokia staging and commissioning services including RAN LLD, integration, and beamforming test support. Delivery is required within 90 days after release of order (three months from award) to NIST-Boulder, with partial delivery acceptable. Installation includes vendor technician on-site for uncrating, equipment setup, start-up services, and turnkey installation with RAN LLD, integration, and beamforming test support. Training for up to 10 trainees will be provided both on-site and virtually, covering operation, maintenance, troubleshooting, and safety, with vendor-supplied materials. A one-year base manufacturer warranty covering labor, parts, travel, and returns applies, with Technical Support Services (CARES) Bronze within 5 business days. A 3-year maintenance plan including software updates applies across the base period and two option periods. The vendor must possess an active Export Control Classification Number (ECCN) and an active Unique Entity Identification Number (UEI) on SAM.gov at time of award. Power availability is 110V with 30A maximum current. Inspection and acceptance is not expected to exceed 7 business days and will include basic functional testing and key performance indicators verification. NIST will provide a 19" rack and current-generation handsets; 40 hours of on-site vendor travel for installation is required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specification Document

TITLE: 5G Cellular Base Station (Nokia)

Requesting Laboratory / Division / Group:

Communications Technology Laboratory Spectrum Technology and Research Division Shared Spectrum Metrology Group (675.03)

General Statement of Need:

To modernize NIST’s measurement and antenna calibration methodologies, the Spectrum Technology and Research Division requires an outdoor Nokia 5G C-band Next-Generation NodeB (gNB). By incorporating advanced RF features and beamforming capabilities, this high-fidelity base station will allow researchers to replicate real-world deployment dynamics.

Item Specifications and Quantities:

Item 1: Radio Access Network (RAN) Base Station Hardware and Software Base Option

Quantity: 1 Each Specifications 1.1 5G Outdoor Baseband Unit (BBU) 2 x 100 MHz (mMIMO), GPS, ACOC, Cabinet HW + HWA

1.2 5G n77 mMIMO Outdoor 64T64R 1 x 100 MHz 320W 16

Layers HW + HWA

1.3 5G Main Software and 5G Value Packs 1 x 100 MHz 1SCC

= 20 MHz

Item 2: RAN CARES (See Warranty Section) Quantity: 1 years Annualized in Base Period, Option Period 1, and Option Period 2

Specifications: 2.1 Technical Support Services (CARES) Bronze

Item 3: RAN Service (See Installation section) Quantity: 1 Specifications: 3.1 Nokia Staging, incl RAN commissioning & Customer delivery PM. RAN LLD, Integration & beam forming test support.

Vendor Requirements

1. Possess at time of award/contracting an Export Control Classification Number (ECCN).

2. Possess at time of award/contracting a Unique Entity Identification Number (UEI) which registration is listed as “Active” on the GSA System for Award Management (SAM.gov).

Procurement Support Information and Ancillary Services:

[Provide input for each section Below or Mark Not Applicable (N/A)]

Section Requirements/Specifications

Planning Considerations ☐ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain Requirements.] ☒ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)

☐ Vendor Representative On-Site more than three (3) days.

☐ Other Considerations:

[List other considerations to ensure an accurate quote.]

Shipping & Delivery ☐ N/A

Shipping Address:

☐ NIST-Boulder

ATTN: Aziz Kord Mail Stop: 675.02 325 Broadway Boulder, CO 80305

☐ NIST-Gaithersburg

ATTN:

Mail Stop:

100 Bureau Dr Gaithersburg MD 20899

☐ [Alternate Shipping Address] Shipping Criteria:

☒ Partial Delivery Acceptable

☐ [Enter Shipping and Delivery information by item.] ☒ Direct Delivery to OU Building Required [Explain Need for Requirement]

Building /Room Number: [Enter Building/Room Number]

☐ Building has Loading Dock Containerization Preference: [Enter Container Type] Other Requirements:

[List Any Other Requirement] Delivery Date Criteria:

☒ Delivery Shall Be Competed No Later Than:

90 Days After Release of Order (ARO) Three months from the award date

☐ Delivery Shall Be Made No Earlier Than:

Click or tap to enter a date.

☐ Scheduled Deliveries:

Item Number Due Date

☐ Other:

Three months after the award date.

Electronic Media ☐ N/A

[Enter Electronic Media Requirements by Item.]

☒ Software ☒ Electronic Manuals ☐ License Key ☒ Other:

Annual Software Release Subscription for 5G Main Software and

5G Value Packs.

Requesting for Base Period, Option Period 1, Option Period 2

☒ US Government Email Address for Software Delivery:

azizollah.kord@nist.gov

Installation

[Enter Installation Requirements by Item]

☒ Vendor Technician on Site ☐ Rigging

☒ Uncrating / Unpackaging ☐ Removal of Packaging Material ☒ Equipment Set Up ☒ Start-Up Services

☒ Turnkey Installation ☒ Other:

RAN LLD, Integration & Beamforming Test Support NOTE: TPOC shall be the coordination POC.

Facility / Utility Considerations ☐ N/A

[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers

[List Work Order Numbers]

☒ Power Available

Voltage: 110 (V) Maximum Current: 30 (A) Phase: [Choose Phase]

Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:

[List Any Other Power Considerations.]

☐ Utility Connections:

[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]

☐ Other Considerations:

[List Other Considerations to Ensure an Accurate Quote.]

Inspection and Acceptance ☐ N/A

[Inspection Requirements Per Item (Who, When, What, Where)] ☐ On-Site

☒ Acceptance Not Expected to Exceed 7 Business Days

☐ Acceptance Expected to Exceed 7 Business Days:

☒ Inspection and Acceptance Plan:

Basic functional test and key performance indicators (KPIs) verification.

[Enter Other Requirements]

Training Training Requirements (Who, When, What, Where)

☒ Number of Trainees: 10

☒ On-Site

☒ Off-Site Location: Virtual Is Trainee Travel Required: NO Scope of Training ☒ Operation ☒ Maintenance ☒ Troubleshooting

☒ Safety ☐ Other ☐ Training Materials to be Provided by Government:

[Describe Materials] ☒ Training Materials to be Provided by Vendor:

PowerPoint presentation, electronic manual, or others.

☐ Other

NOTE: TPOC shall be coordination POC.

Warranty

Base Manufacturer Warranty is acceptable Warranty Period Length: 1 - Year What is included?

☒ Labor ☒ Parts ☒ Travel ☒ Cost and Liability for Returns

☒ Other Technical Support Services (CARES) Bronze Within 5 Business days.

☐ 1 Option Period ☒ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)

Calibration [Describe Calibration Requirements Per Item]

Calibration Plan Length: [i.e. 3 - Years]

☒ N/A What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables ☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Maintenance

[Describe Maintenance Requirements Per Item] Maintenance Plan Length: 3-Years What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☒ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☒ 2 Option Periods

Government Furnished Material / Equipment ☐ N/A

A 19” rack to host the gNB equipment.

☐ Samples for Testing

☐ Equipment which will leave Government Site

Description:

Serial Number:

[Enter Description] [Enter Serial Number]

NIST Property Number: [Enter NIST Property Number] ☒ Other: Current generation of handsets

Travel ☒ N/A

40 hours of onsite for installation.

☐ Explain:

[Enter Justification / Requirement]

[Enter Other Requirements]

NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.

File details come from the government source that posted it. Updated .