This document is a Statement of Objectives (SOO) for replacing the existing Flash X-Ray System at the Arnold Engineering Development Complex (AEDC) Hypervelocity Aeroballistics Ranges Facilities on Arnold Air Force Base, Tennessee.

The contract objectives include a defined Statement of Work to satisfy the performance parameters outlined in the SOO, planned project milestones, required data deliverables, and data rights clauses. The contract also requires a Quality Control Plan, Logistics Objective for hardware, software, and training support, and a Program Management Objective to provide the government visibility into the project schedule, performance, and risks.

The related federal contract opportunity is for a sole source, firm-fixed-price contract to Hadland Imaging, LLC for the new Flash X-Ray and Multi-Anode Flash X-Ray Systems at AEDC. However, the government will consider proposals from all responsible sources.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Objectives (SOO)

Flash X-Ray System Project

1.0 Project Objective: Replace existing Flash X‐Ray System currently housed in the Arnold Engineering

Development Complex (AEDC) Hypervelocity Aeroballistics Ranges Facilities located on Arnold Air

Force Base (AFB), Tennessee (TN) with a new Flash X-Ray System in accordance with (IAW) SOO

Attachment 1 – Performance Parameters.

2.0 Contract Objectives: The contract shall define, at a minimum, the following:

2.1 Work to be performed: Specific, performance‐based, quantitative terms of the work to‐be‐ done, in the form of a Statement of Work (SOW), to satisfy the Flash X-Ray System Project

IAW SOO Attachment 1 – Performance Parameters, Sections 2.0 and 3.0.

2.2 Project Milestones: Planned, significant events scheduled to occur at specific times in the

Flash X-Ray System Project (throughout a time period not to exceed 12 months) IAW

SOO Attachment 1 – Performance Parameters, Section 1.0.

2.3 Data Deliverables: Tangible or intangible data items produced as a result of the work performed, and their anticipated delivery date, method of delivery, format, and quantity. At a minimum, data deliverables shall include the data items listed in SOO Attachment 1 –

Performance Parameters, Section 4.0.

2.4 Data Rights: The following DFARS Clauses shall be included in the contract to address data rights.

• 252.227‐7014, Rights in Noncommercial Computer Software and Noncommercial

Computer Software Documentation

• 252.227‐7016, Rights in Bid or Proposal Information

• 252.227‐7019, Validation of Asserted Restrictions—Computer Software

• 252.227‐7037, Validation of Restrictive Markings on Technical Data

3.0 Quality Control Plan: Development and maintenance of a quality program to ensure the Flash X-

Ray System Project is made IAW the contractor‐developed Statement of Work (SOW).

Development and implementation of procedures to meet project milestones. Development and implementation of procedures to ensure appropriate corrective action is taken to meet project milestones.

4.0 Logistics Objective: Development and delivery of all data such as hardware and software, drawings, parts list, and training necessary to support the Flash X-Ray System Project.

5.0 Program Management Objective: Allow maximum flexibility to innovatively manage the project schedule, performance, risks, subcontracts (if applicable), and data to complete the Flash X-Ray

System Project so that it satisfies the user’s performance requirements IAW SOO Attachment 1 –

Performance Parameters. Clear government visibility into the project schedule, performance, and risks shall be maintained.

File details come from the government source that posted it. Updated .