Statement of Work

USFS

Angeles National Forest Automated Fee Machine Site Preparation

1 SCOPE OF CONTRACT

A. This project consists of site preparation for installation of a concrete pad for later installation of

Automated Fee Machines. The project includes excavation and installation of a cast in place concrete pad as shown in the attached drawings at two separate locations near the Angeles National Forest.

B. The contractor shall work with the appropriate authorities to identify any buried underground utilities prior to excavation. The contractor shall schedule a meeting with the COR prior to commencing of excavation to approve trench locations.

C. The contractor shall excavate and burry one, up to 75 ft length, bore at each site from the installation pad to an adjacent building. Minimum depth of conduit is 18” below grade or industry standard, whichever is greater. Each bore will be capable of housing three individual ½” PVC conduits within the same bore. This may be completed with excavation or trenchless boring tools or any combination thereof. Multiple bends may be required in the trench path depending on the method selected.

D. Install phone line, network line, and phone line in individual conduit pipes. Each wire should extend 5 ft from each end of the conduit, per Ven Teck drawing.

E. After conduit is installed, contractor shall backfill and patch the excavation with concrete or asphalt, whichever material matches the existing surface adjacent to the excavation.

2 PROJECT LOCATION

The project work is in two sperate locations:

1. San Gabriel Canyon Gateway Center, N, 1960 San Gabriel Canyon Rd, Azusa, CA 91702

2. Clear Creek Information Station, Angeles Crest Hwy, La Cañada Flintridge, CA 91011 (34.27018414136522, -118.1531948156387)

3 SITE INFORMATION AND LIMITATIONS

The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:

1. Work completed at the San Gabriel Canyon Gateway Center will require contractor to obtain permits from the city of Azusa.

2. Water is available at the San Gabriel Canyon Gateway Visitor Center site for construction purposes. This water is similar to the volume and pressure available from a typical residential spigot.

3. Water is not available at the Clear Creek Information Station. Water may be available at the Clear Creek Fire Station on the opposite site of the Angeles Crest Highway (CA-2). This water cannot be guaranteed to be available, and could be impacted by fire suppression activities.

4. Toilet facilities are available at each site.

5. All work shall be completed between Monday through Friday Between the hours of 6:00AM and

6:00PM.

4. WORK CAMPS, STAGING AND STORAGE AREAS

Areas for staging operations and storage of materials shall be approved by the COR.

5. INSPECTION OF WORKSITE

The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.

6. TECHNICAL SPECIFICATIONS

The following specifications are included as an attachment to Section J. Some sections in the schedule of items refer to other sections not listed and are subsidiary to or are included in payment for other pay items in this contract. These items are considered incidental, and no additional compensation will be made.

Technical Specifications

Section 011900 - Mobilization Section 013300 - Submittal Procedures Section 014100 - Quality Control Section 023701 - Sediment And Erosion Control Measures Section 024100 - Waste Material Disposal Section 033000 - Cast-In-Place Concrete Section 033020 - Concrete From Packaged Dry Mix For Minor Structures Section 260500 - Common Work Results For Electrical Section 260526 - Grounding And Bonding For Electrical Systems Section 260533 - Raceways And Boxes For Electrical Systems Section 312000 - Earthwork Section 312100 - Project Site Preparation And Grading Section 312225 - Excavation & Embankment Section 321200 – Warm Mix Asphalt paving Section 321202- Cold Mix Asphalt for repairs.

Section 321204 - Crushed Aggregate Base Or Surface Course

1 SCOPE OF CONTRACT
2 PROJECT LOCATION
3 SITE INFORMATION AND LIMITATIONS
4. WORK CAMPS, STAGING AND STORAGE AREAS
5. INSPECTION OF WORKSITE
6. TECHNICAL SPECIFICATIONS

File details come from the government source that posted it. Updated .