This document is a site plan for the Newtown Estates Park Perimeter Trail Improvements, dated June 26, 2025. The project involves comprehensive park upgrades, including resurfacing a 1,600-foot long and 8-foot wide shell perimeter trail with asphalt, extending the new trail 30 feet past the existing shell base to connect with existing concrete sidewalks. The total perimeter loop trail will be 2,640 linear feet (approximately 1/2 mile). Key improvements include adding 1,040 linear feet of accessible public sidewalks connecting to the main entrance, installing a 5' long x 10' wide x 3' deep concrete box culvert for trail drainage, and replacing the existing mortise fence with five 6" round bollards.
Additional project elements include regrading the trail area for erosion control, providing riprap to the east, and relocating a pecan grove with two proposed relocation options that maintain 30 feet from the field and 10 feet from the trail. The baseball field will be replaced with a multi-purpose field by others, and a 3-foot wide person gate will be added to the mortise fence to accommodate wheelchairs. The site plan shows the park's layout on Martin Luther King Jr. Way and Newtown Boulevard, with detailed markings for the trail improvements, existing structures, and proposed changes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Newtown_Estates_Park_Asphalt_Trail.pdf | ||
| Attachment_10.jpg | JPG image | |
| Attachment_9.jpg | JPG image | |
| Attachment_8.jpg | JPG image | |
| Attachment_7.jpg | JPG image | |
| Attachment_6.jpg | JPG image | |
| Attachment_5.jpg | JPG image | |
| Attachment_4.jpg | JPG image | |
| Attachment_3.jpg | JPG image | |
| Attachment_2.jpg | JPG image | |
| 2025-QQ-567_Requirements.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE:
0'
1"=100'
50' 100'
11"x17" ORIGINAL SCALE IF ALTERED
PARK IMPROVEMENTS
11"x17" ORIGINAL SCALE IF ALTERED
NEWTOWN ESTATES PARK PERIMETER TRAIL
JUNE 26, 2025
NO CHANGE: INCORPORATE EXISTING
CONCRETE SIDEWALKS TO PERIMETER TRAIL
M
A R
T
I
N
L
U
T
H E
K
I N
G
J
W
A
Y
POINT OF BEGINNING: RESURFACE SHELL
PERIMETER TRAIL WITH ASPHALT.
1600 FT LONG x 8 FT WIDE = 12,800 SF
REPLACE 16 LF MORTISE FENCE WITH (5) 6"
ROUND BOLLARDS AT 3'-6" ON CENTER.
END OF NEW ASPHALT PAVING.
EXTEND NEW TRAIL 30 FEET PAST EXISTING
SHELL BASE TO MAKE CONNECTION TO
EXISTING CONCRETE SIDEWALK.
ACCESSIBLE PUBLIC SIDEWALKS CONNECT
TO MAIN ENTRANCE AND ADD 1040 LF.
TOTAL PERIMETER LOOP TRAIL = 2640 LF
= 1
2 MILE
INSTALL 5' LONG x 10' WIDE x 3' DEEP
CONCRETE BOX CULVERT AT TRAIL
REGRADE TO WEST FOR EROSION CONTROL;
PROVIDE RIP RAP TO EAST
PECAN GROVE TO BE RELOCATED AND
BASEBALL FIELD TO BE REPLACED WITH
MULTI-PURPOSE FIELD
BY OTHERS
ADD 3' WIDE PERSON GATE AT MORTISE
FENCE TO ALLOW WHEELCHAIRS
PECAN GROVE RELOCATION AREA
OPTION 2
MAINTAIN 30 FEET FROM FIELD AND 10 FEET
FROM TRAIL
PECAN GROVE RELOCATION AREA
OPTION 1
MAINTAIN 30 FEET FROM FIELD AND 10 FEET
FROM TRAIL
N E W T O W N B L V D