Attachment_1.pdf

PDF 5 MB Posted

Attached to
Newtown Estates Park Asphalt Trail
Solicitation number
2025-QQ-567
Issued by
Sarasota County, Florida

About this file

This document is a site plan for the Newtown Estates Park Perimeter Trail Improvements, dated June 26, 2025. The project involves comprehensive park upgrades, including resurfacing a 1,600-foot long and 8-foot wide shell perimeter trail with asphalt, extending the new trail 30 feet past the existing shell base to connect with existing concrete sidewalks. The total perimeter loop trail will be 2,640 linear feet (approximately 1/2 mile). Key improvements include adding 1,040 linear feet of accessible public sidewalks connecting to the main entrance, installing a 5' long x 10' wide x 3' deep concrete box culvert for trail drainage, and replacing the existing mortise fence with five 6" round bollards.

Additional project elements include regrading the trail area for erosion control, providing riprap to the east, and relocating a pecan grove with two proposed relocation options that maintain 30 feet from the field and 10 feet from the trail. The baseball field will be replaced with a multi-purpose field by others, and a 3-foot wide person gate will be added to the mortise fence to accommodate wheelchairs. The site plan shows the park's layout on Martin Luther King Jr. Way and Newtown Boulevard, with detailed markings for the trail improvements, existing structures, and proposed changes.

View the file

Other files

File Type Posted
Newtown_Estates_Park_Asphalt_Trail.pdf PDF
Attachment_10.jpg JPG image
Attachment_9.jpg JPG image
Attachment_8.jpg JPG image
Attachment_7.jpg JPG image
Attachment_6.jpg JPG image
Attachment_5.jpg JPG image
Attachment_4.jpg JPG image
Attachment_3.jpg JPG image
Attachment_2.jpg JPG image
2025-QQ-567_Requirements.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCALE:

0'

1"=100'

50' 100'

11"x17" ORIGINAL SCALE IF ALTERED

PARK IMPROVEMENTS

11"x17" ORIGINAL SCALE IF ALTERED

NEWTOWN ESTATES PARK PERIMETER TRAIL

JUNE 26, 2025

NO CHANGE: INCORPORATE EXISTING

CONCRETE SIDEWALKS TO PERIMETER TRAIL

M

A R

T

I

N

L

U

T

H E

K

I N

G

J

W

A

Y

POINT OF BEGINNING: RESURFACE SHELL

PERIMETER TRAIL WITH ASPHALT.

1600 FT LONG x 8 FT WIDE = 12,800 SF

REPLACE 16 LF MORTISE FENCE WITH (5) 6"

ROUND BOLLARDS AT 3'-6" ON CENTER.

END OF NEW ASPHALT PAVING.

EXTEND NEW TRAIL 30 FEET PAST EXISTING

SHELL BASE TO MAKE CONNECTION TO

EXISTING CONCRETE SIDEWALK.

ACCESSIBLE PUBLIC SIDEWALKS CONNECT

TO MAIN ENTRANCE AND ADD 1040 LF.

TOTAL PERIMETER LOOP TRAIL = 2640 LF

= 1

2 MILE

INSTALL 5' LONG x 10' WIDE x 3' DEEP

CONCRETE BOX CULVERT AT TRAIL

REGRADE TO WEST FOR EROSION CONTROL;

PROVIDE RIP RAP TO EAST

PECAN GROVE TO BE RELOCATED AND

BASEBALL FIELD TO BE REPLACED WITH

MULTI-PURPOSE FIELD

BY OTHERS

ADD 3' WIDE PERSON GATE AT MORTISE

FENCE TO ALLOW WHEELCHAIRS

PECAN GROVE RELOCATION AREA

OPTION 2

MAINTAIN 30 FEET FROM FIELD AND 10 FEET

FROM TRAIL

PECAN GROVE RELOCATION AREA

OPTION 1

MAINTAIN 30 FEET FROM FIELD AND 10 FEET

FROM TRAIL

N E W T O W N B L V D

Sheets and Views
REBUILD_CONCEPT_1

File details come from the government source that posted it. Updated .