Attachment 1. Draft SOR NIPR Virtual CORE Storage Hardware Upgrade.docx
DOCX document 59 KB Posted
- Attached to
- NIPR Virtual CORE Storage Hardware Upgrade
- Solicitation number
- FA330042CS26
About this file
This is a Statement of Requirements (SOR) for a turnkey NIPR Virtual CORE Storage Hardware Upgrade at Maxwell Air Force Base, Alabama, under solicitation number FA330042CS26. The 42nd Communications Squadron requires the procurement, installation, and integration of Hewlett Packard Enterprise (HPE) equipment, specifically an HPE MSA 2070 storage array and HPE DL360 Gen 11 servers, to upgrade its existing HPE 3PAR 8400 2N storage infrastructure. The project includes migrating data from the current system to the new MSA, adding a fourth node, transitioning four hosts to direct connect architecture, and removing two HPE SN6000B Fibre Channel switches from the data path. All equipment must include three years of initial licensing and sustainment support warranty. Delivery is FOB Destination to Maxwell AFB, Building 1154, IT Warehouse, 455 S. Kelly Street.
The contractor bears full responsibility for providing a complete turnkey solution encompassing project management, design, engineering, fabrication, installation, network configuration, data migration, testing, and operational handoff. Key deliverables include a Project Completion Test Plan submitted 30 days before contract start, material submittals for approval 10 days prior to project initiation, and comprehensive as-built documentation with knowledge transfer and basic administration training. All equipment must be new (no refurbished or gray market items), Trade Agreement Act compliant, JELA eligible, and forward/upward compatible. The contractor must provide 24/7 telephone support with next business day onsite response, perform remote diagnostics, and maintain all parts and labor for repairs. Security requirements include contractor notification 30 days before on-base performance, base identification credentials for personnel, compliance with REAL ID Act requirements, and adherence to Air Force installation access controls, traffic regulations, and security reporting requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2. Sources Sought.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF Requirement Maxwell_42CS_NIPR Virtual CORE Storage Hardware Upgrade
1.0. Introduction and Background. The 42nd Communications Squadron at Maxwell AFB, AL has a requirement to upgrade its HPE, 3PAR 8400 2N NIPR Core (File, Print, Web & Application) Storage Hardware, with a Modular Smart Array (MSA) and add a Fourth Node. After equipment installation and the data migration to the new MSA, the vendor will need to move the (4) Hosts to a Direct Connect and remove the (2) current HPE SN6000B 16GB 48/24 FC Switches from the data path.
2.0 Equipment Specifications:
2.0.1. Please see below and Excel Spreadsheet.
· Hewlett Packard Enterprise (HPE) MSA 2070
· Hewlett Packard Enterprise (HPE) DL360 Gen 11 8SFF Server
· 3 Years of Initial Licensing (If Required) and Sustainment Support (Warranty)
3.0 Contractor Responsibilities:
3.0.1. The contractor shall provide all Project Management Services, Design, Draft, Engineer, Fabricate, Modify, Furnish, Install, Program, Configure, Join to the Network, Migration Services, Transitions, Test and make Operational, a complete Turnkey Solution for the 42nd Communications Squadron’s NIPR Virtual CORE Storage Hardware Upgrade Project.
3.0.2. All bidding contractors are highly encouraged to conduct their own independent configuration survey PRIOR to submitting a bid. Government project information is deemed reliable but not guaranteed on interface, interconnect, configurations, versioning, licensing and hardware connections. It is the vendor’s responsibility to ensure the project will be a successful turnkey project as bid with no outstanding issues on the government.
3.0.3. The contractor will provide a Project Completion Test Plan 30 days before the contract start date, detailing all applicable tests to be performed, that will show all applicable equipment, software, circuits, trunks and dial plans are in 100% correct working order.
3.0.4. Contractor is to provide a submittal sheet for approval on all material, hardware and software to be used for government acceptance NLT 10 prior to start of the project.
3.4.1. Submittal data includes Make, model, operating system (OS), software, technical specification sheets and connections of items be deployed.
3.4.2. Any required Authority To Operate (ATO) documentation with expiration dates.
3.0.5. Provide final documentation to include as-built documents that describe the final deployed solution.
3.0.6. Provide knowledge transfer describing the final configurations and architecture.
3.0.7. Provide basic training on administration, management and troubleshooting the installed equipment.
3.0.8. Configure Security Technical Implementation Guide (STIG) hardening and/or other additional Information Assurance (IA) scans as required.
3.0.9. The contractor shall provide the customer with all manufacturer warranties as needed for any component incorporated into this project, along with equipment manuals, literature, CDs and DVDs and other documentation on all equipment.
3.0.10. All new Information Technology Services (ITS) equipment and cabling supplied must be ITS standard products and supplied from a reputable manufacturer. No refurbished, recertified, reconditioned, remanufactured or ‘gray’ items will be accepted.
3.0.11. No refurbished, re-manufactured or counterfeit parts will be accepted, nor will they be installed on the Air Force Network (AFNET).
3.0.12. All Work must be performed by Authorized Technicians.
3.0.13. Support: 24x7 Telephone with Next Business Day Onsite.
3.0.14. Perform Remote Diagnostics.
3.0.15. Perform On-Site Maintenance if Required.
3.0.16. Cover All Parts, Labor and Materials needed to Repair or Replace.
3.0.17. All new equipment must be Forward/Upward Compatible to growing technology.
3.0.18. All equipment and parts must be Trade Agreement Act (TAA) Compliant and JELA eligible.
3.0.19. When complete, all attached and/or associated equipment must be returned to a 100% fully operational state.
3.0.20. Keep Your Hard Drive: 42 CS will keep all old hard drives for sanitization purposes.
3.0.21. All replaced parts and any work generated residue must be removed, completely transported off Maxwel AFB and/or Gunter Annex and properly disposed. Use of base dumpsters IS NOT ALLOWED.
5.0 Technical POCs:
5.0.1. Johnny Batton, 42CS/SCXP, (334) 953-3461
5.0.2. Mike Jamison, 42CS/SCOO, (334) 953-9733
6.0. Shipping Information: The contractor shall provide and deliver the new equipment to 42CS/SCXE Attn: Johnny Batton Bldg. 1154, IT Warehouse 455 S. Kelly Street Maxwell AFB, AL 36112.
6.0.1. Delivery of the product will be F.O.B. Destination.
7.0. Security
7.0.1. Security Requirements For Unclassified Services Only, No CAC Required
1. 1. Contractor Notification Responsibilities: The contractor shall notify the contracting officer within 30 days before on-base performance of the service. The notification shall include:
a. Name, address, and telephone number of contractor employees working on the contract.
b. The contract number and contracting agency.
c. The location(s) of service performance and future performance, if known.
d. The date service performance begins.
e. Any change to information previously provided under this paragraph.
2. Installation Access Requirements: As prescribed by the DAFFARS 5352.242-9000, Contractor access to Air Force installations, AFI 31-218, Motor Vehicle Traffic Supervision, and DoDM5200.08v3_AFMAN31-101v3, Installation Perimeter Access Control.
The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Department of the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished contractor identification badges while visiting or performing work on the installation.
The contractor shall submit a written request on company letterhead to the Contracting Officer (CO) listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, and valid vehicle insurance certificate to obtain a vehicle pass.
During performance of the service, the contractor shall be responsible for obtaining the required identification for newly assigned personnel and for prompt return of credentials for any employee who no longer requires access to the work site.
Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
Failure to comply with these requirements may result in the withholding of final payment.
Vehicle Inspections. All commercial vehicles will be directed to Gate 3 (Kelly St) or Gate 4 (Congressman Dickenson for Gunter) for processing through the Commercial Vehicle Inspection (CVI) Area, when operational. During non-duty hours and holidays, commercial vehicle inspections will be conducted at Gate 1 (Maxwell Blvd) or Gate 4 (Congressman Dickinson Drive) only. Inspection members will conduct thorough inspections of the interior and exterior of the vehicle for items prohibited from the installation such as explosive devices, weapons and ammunition, drugs, and open or closed alcohol containers.
3. REAL ID Act: All Maxwell Air Force Base and Gunter Annex visitors must present a REAL ID-compliant credential to be issued a pass.
REAL ID-compliant cards have a star marking ⭐️on the upper portion of the card. If the card does not have a star marking, it is not REAL ID-compliant and won’t be accepted as proof of identity to board commercial aircraft or access military installations like Maxwell or Gunter.
Those without a REAL ID-compliant driver’s license may also use a U.S. passport or passport card, a Transportation Worker Identification Card (TWIC), a Veteran Health Identification Card (VHIC), or a combination of the following documents to be issued a pass:
· An original or certified true copy of a birth certificate with a raised seal
· A social security card
· A driver’s license issued by a state, territory, or the District of Columbia that is not REAL ID-compliant.
All three documents must reflect the same name (or a documented former name through legal name change documents such as a court order, marriage certificate, or divorce decree).
More information about accessing Maxwell can be found here: https://www.maxwell.af.mil/About-Us/Fact-Sheets/Display/Article/4024201/base-access-information/
4. Controlled/Restricted Areas: If work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with DAFI 31-101, Integrated Defense, and DoDM5200.02_DAFMAN 16-1405, Air Force Personnel Security Program.
If unescorted access is not authorized and the contractor requires access to controlled/restricted areas, they must be escorted by appropriately cleared government personnel at all times.
If work is required in a classified environment, the area must be sanitized, and the contractor will be escorted at all times by appropriately cleared government personnel.
5. Reporting Requirements: The contractor shall comply with DAFI 71-101, Volume-1, Criminal Investigations, and AFI 71-101, Volume-2, Protective Service Matters, requirements. Contractor personnel shall report to 42d Air Base Wing Information Protection Office, any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment and as required thereafter.
6. Traffic Laws: The contractor and their employees shall comply with base traffic regulations set forth in AFI 31-218, Motor Vehicle Traffic Supervision and DoDM5200.08v3_AFMAN31-101v3, Installation Perimeter Access Control. Personnel in violation may be issued a Central Violations Bureau Form 1805 traffic ticket.
7. Random Installation Entry/Exit Checks: Entry/exit vehicle checks are conducted by order of the 42 ABW Commander. These checks are conducted for the purpose of safeguarding the base and protecting government property by discovering and seizing stolen property, classified information, and contraband. Refusal to submit to an installation (entry/exit) vehicle check may result in the loss of base driving privileges, revocation of base registration, or debarment action.
8. Cellular Phone Operation Policy: The use of cellular phones while operating a motorized vehicle is prohibited on Maxwell-Gunter. Although discouraged, drivers are authorized to use devices, i.e. ear bud or ear boom, which allows their cellular phone to be operated hands-free. The device must not cover both ears. This policy applies to everyone driving on Maxwell AFB and Gunter Annex. Personnel in violation may be issued a Central Violations Bureau Form 1805 traffic ticket.
9. Wireless Electronic Devices: The contractor will not establish their own Information Technology (IT) systems or networks (Local Area Networks [LAN], Wide Area Network [WAN], Cellular phone/USB Modem as WAN, Wi-Fi as WAN, etc.), or camera system without the direct permission of the Program Manager and governing communications and responsible information systems office (42 CS).
10. Firearms and Ammunition: Transporting weapons or ammunition, concealed or otherwise, IS NOT permitted by any non-law enforcement personnel on Maxwell AFB/Gunter Annex at any time regardless of state issued concealed weapons/LEOSA permits. Violations may result in criminal prosecution under applicable federal laws.
11. Illegal Weapons. The weapons below are considered illegal, unless specifically authorized by competent authority and are prohibited on Maxwell AFB/Gunter Annex. Violations may result in criminal prosecution under applicable federal laws.
a. Switchblade knives or knives with any type of automatic blade release.
b. An incendiary/explosive weapon (e.g., grenades, flash bangs).
c. Fireworks
d. Homemade mortars, aka "tennis ball launchers" or similar devices.
image1.emf
42nd CS - Storage Options and Additional Server Node.xlsx Technical Solution
Line Item Description Manufacturer Part # Quantity
MSA 2070 - Storage Enclosure - 2U - Custom Config Below HPE S3T85A 1
MSA 2070 - Storage Enclosure - 2U - Gigabit Ethernet - Three-year limited warranty - Start with the unique and intuitive graphical user interface of HPE MSA Storage Management Utility (SMU) that provides step-by-step instructions and guided workflows to set up the array within minutes. HPE S3T85A 1
LA HPE MSA 1.92TB SAS 12G Read Intensive SFF (2.5in) M2 3-year Warranty FIPS Encrypted SSD HPE S4M81A 2
HPE MSA 14.4TB SAS 12G Enterprise 10K SFF (2.5in) M2 3-year Warranty FE 6-pack HDD Bundle HPE S4M84A 2
Device Type: Transceiver - Data Transfer Rate: 32Gbps - Data Link Protocol: 32Gb Fibre Channel - Form Factor: SFP+ HPE S3Y23A 1
HPE MSA 2060 Adv Data Services E-LTU HPE R2C33AAE 1
HPE Installation and Startup Service HPE HA114A1 1
HPE MSA Family Startup SVC HPE HA114A1#5J0 1
HPE 3Y TC Essential wCDMR SVC HPE HU4A8A3 1
HPE MSA ADS LTU Suppor HPE HU4A8A3#ZQC 1
HPE MSA 2070 Arrays Support HPE HU4A8A30BX3 1
Line Item Description Manufacturer Part # Quantity
HPE DL360 Gen11 8SFF - Custom Config Below HPE P52499-B21 1
HPE DL360 Gen11 8SFF CTO Server HPE P52499-B21 1
HPE DL360 G11 SFF CTO Server HPE P52499-B21#ABA 1
TAA Compliant Product HPE P52499-B21#GTA 1
INT XEON-G 6430 CPU FOR HPE HPE P49614-B21 2
Factory Integrated HPE P49614-B21#0D1 2
HPE 16GB (1x16GB) Single Rank x8 DDR5-4800 CAS-40-39-39 EC8 Registered Smart Memory Kit - HPE DDR5 Smart Memory is designed for small to large enterprise customers with a significant need for performance and capacity, along with a desire to manage total cost of ownership. HPE P43322-B21 16
Factory Integrated HPE P43322-B21#0D1 16
HPE DL360 G11 8SFF X1 U.3 TM BP KIT HPE P48895-B21 1
Factory Integrated HPE P48895-B21#0D1 1
HPE 480GB SATA 6G Read Intensive SFF BC Multi Vendor SSD - HPE 480 GB, SATA, read intensive, solid state, small form factor, Basic carrier, drive with 3-year warranty HPE P40497-B21 2
Factory Integrated HPE P40497-B21#0D1 2
HPE MR216i-o Gen11 SPDM Storage Cntlr HPE P47789-B21 1
Factory Integrated HPE P47789-B21#0D1 1
Broadcom BCM57412 Ethernet 10Gb 2port SFP+ OCP3 Adapter for HPE - P26256-B21 HPE P26256-B21 1
Factory Integrated HPE P26256-B21#0D1 1
HPE BladeSystem cClass 10Gb SFP+ SR Transceiver - 455883-B21 - Type: SFP+ - Maximum distance: 300 m - Transfer speed: 10 Gb - Family: HPE BladeSystem c-Class - Connector type: LC - Fiber type: Multi Mode - Wavelength: 850 nm - Weight: 0.04 lb. (0.02 kg) - Dimensions: 2.19(d) x 0.54(w) x 0.47(h) in. (5.57 x 1.38 x 1.19cm) HPE 455883-B21 2
Factory Integrated HPE 455883-B21#0D1 2
HPE DL3X0 GEN11 1U HIGH PERF FAN KIT HPE P48908-B21 1
Factory Integrated HPE P48908-B21#0D1 1
HPE 800W Flex Slot Platinum Hot Plug Low Halogen Power Supply Kit, Input voltage:100- 240V AC, Dimensions: 6.80 x 4.04 x 22.53 cm (2.68 x 1.59 x 8.87 in) HPE P38995-B21 2
Factory Integrated HPE P38995-B21#0D1 2
HPE iLO Advanced 1-server License with 3yr Support on iLO Licensed Features HPE BD505A 1
Factory Integrated HPE BD505A#0D1 1
HPE DL3XX GEN11 CPU2/OCP2 X8 ENABLE KIT HPE P48830-B21 1
Factory Integrated HPE P48830-B21#0D1 1
HPE DL360 GEN11 OROC TM CBL KIT HPE P52416-B21 1
Factory Integrated HPE P52416-B21#0D1 1
HPE DL3XX Gen11 1U Bezel Kit HPE P50450-B21 1
Factory Integrated HPE P50450-B21#0D1 1
HPE CE Mark Removal FIO Enable Kit HPE P35876-B21 1
HPE DL360 GEN11 HIGH PERF HEAT SINK KIT HPE P48905-B21 2
Factory Integrated HPE P48905-B21#0D1 2
HPE DL3XX Gen11 Easy Install Rail 3 Kit HPE P52341-B21 1
Factory Integrated HPE P52341-B21#0D1 1
HPE OV w/o iLO 3yr 24x7 Track 1Svr LTU HPE P8B25A 1
HPE Installation and Startup Service HPE HA114A1 1
300 Series Hardware Installation HPE HA114A1#5A6 1
HPE 3Y TC Basic wDMR SVC HPE HU4B3A3 1
HPE DL360 GEN11 SUPPORT HPE HU4B3A300DJ 1
Line Item Description Manufacturer Part # Quantity
HP Consulting Storage 40 Hour Onsite SVC HPE H7B28A1 2
File details come from the government source that posted it. Updated .