About this file

This document appears to be an attachment titled "Attachment 1- Contractor Price Breakdown.xlsx" that provides instructions and a price schedule breakdown for a federal contract opportunity.

The price schedule breakdown is for a project to remove and replace sewer risers at the Portland VAMC in Oregon, under contract number 648-24-103. The price schedule includes line items for various construction divisions, insurance/bonds, taxes, O&M manuals, overhead, subcontract markup, and profit. The instructions clarify that the line items are for informational purposes only and do not represent separate billable deliverables. The contract is a fixed-price type. The related federal contract opportunity has a solicitation number of P00001 and seeks a contractor to coordinate sewer drain bypass, demolish and remove existing sewer drains, and furnish and install new sewer drains and piping at the facility.

View the file

Other files for this federal contract opportunity

Other files attached to 648-24-103 Replace Sewer Riser, newest first.
File Type Posted
36C26024Q0844 0001.docx DOCX document
Attachment 2- Sign in sheet.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN
648-24-103

Remove Risers Portland VAMC, Portland Oregon

RatesBase Item
General Requirements & Facility ConstructionPrice
Division Item 1 General RequirementsN/A$0.00
Division Item 2 Existing ConditionsN/A$0.00
Division Item 3 Thermal and Moisture ProtectionN/A$0.00
Division Item 4 Special ConditionsN/A$0.00
Division Item 5 PlumbingN/A$0.00

TOTAL DIVISION $0.00

Insurance / Bonds$0.00
Taxes / Other Fees (provide itemized list)$0.00
O&M Manuals and Red Line Drawings$0.00
Overhead$0.00
SubContract Mark-Up$0.00
Profit$0.00
SubTotals$0.00

Other Items not Requested Above (provide itemized list) $0.00

CONTRACT TOTALS$0.00